Construction of the DW 780 connection (ul. Prince Jozef in Kraków) with the southern bypass of Krakow – Mirowski Node (Q112965)

From EU Knowledge Graph
Revision as of 20:07, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Construction d’une nouvelle route provinciale no 780 d’une longueur de 1 060,20 m de l’ul. Le prince Józef reliera le contournement sud de Cracovie — l’autoroute A4 à la jonction Mirowski et l’extension de la route provinciale no 780 sur une longueur de 162,5 m (ul. Prince Joseph) et l’extension de la liaison autoroutière sur une longueur de 80,50 m à Cracovie et dans le village de Kryspinów, la commune de Liszki, le district de Cracovie, la voï...)
Jump to navigation Jump to search
Project Q112965 in Poland
Language Label Description Also known as
English
Construction of the DW 780 connection (ul. Prince Jozef in Kraków) with the southern bypass of Krakow – Mirowski Node
Project Q112965 in Poland

    Statements

    0 references
    13,764,525.88 zloty
    0 references
    3,303,486.21 Euro
    13 January 2020
    0 references
    16,193,559.91 zloty
    0 references
    3,886,454.38 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 November 2015
    0 references
    31 August 2016
    0 references
    WOJEWÓDZTWO MAŁOPOLSKIE
    0 references
    Budowa nowego przebiegu drogi wojewódzkiej nr 780 o długości 1060,20 m od ul. Księcia Józefa do połączenia z południową obwodnicą Krakowa – autostradą A4 w węźle Mirowskim oraz rozbudowa drogi wojewódzkiej nr 780 na długości 162,5 m (ul. Księcia Józefa) i rozbudowa łącznicy autostradowej na długości 80,50 m w Krakowie oraz w miejscowości Kryspinów, gmina Liszki, powiat krakowski, województwo małopolskie Zakres zamierzenia planowanej inwestycji: 1. W ramach budowy drogi wojewódzkiej - nowy przebieg DW 780 realizowane będą następujące roboty budowlane w liniach rozgraniczających pas drogi krajowej – autostrady A-4 : - budowa skrzyżowania skanalizowanego typu "średnie rondo" czterowlotowego - rozbudowa wlotów łącznicy autostradowej (ul. Mirowska) - budowa i przebudowa ciągów pieszo-rowerowych - przebudowa rowu drogowego - budowa i przebudowa kanalizacji deszczowej wraz z przykanalikami - budowa oświetlenia ulicznego - przebudowa sieci elektroenergetycznej średniego napięcia 2. W ramach budowy drogi wojewódzkiej - nowy przebieg DW 780 realizowane będą następujące roboty budowlane w liniach rozgraniczających pas drogi wojewódzkiej nr 780: - budowa drogi wojewódzkiej nr 780 jezdnojezdniowej o szerokości 7,0m, o dwóch pasach ruchu 2x3,5m klasy G odługości 1060,20m - budowa mostu nad rzeką Sanka w km rzeki 0+942, w km DW780 0+668 (1), o długości całkowitej Lc=62,0m, rozpiętości teoretycznej Lt=11,8+18,1+11,8m, szerokości całkowitej B=13,94m / 14,29m - budowa skrzyżowania skanalizowanego typu "małe rondo" czterowlotowego - budowa wlotu północnego z ronda na drogę gminną, - rozbudowa drogi wojewódzkiej nr 780 z chodnikiem, - budowy dojazdu do obsługi i konserwacji projektowanych rowów szczelnych, projektowanych urządzeń podczyszczających, dla służb utrzymaniowych do obsługi projektowanego obiektu mostowego nad rzeką Sanką - budowa ciągu pieszo-rowerowego - budowa chodnika - budowa rowów drogowych nieszczelnych (trapezowych) w ciągu projektowanej drogi wojew (Polish)
    0 references
    Construction of a new course of the Voivodeship Road No. 780 with a length of 1060.20 m from ul. Prince Józef to connect to Krakow’s southern ring road – the A4 motorway in the Mirowski junction and extension of the provincial road no. 780 to the length of 162.5 m (ul. Prince Józef) and extension of the motorway link with a length of 80.50 m in Krakow and in Kryspinów, Liszki commune, Krakow county, Małopolskie Voivodeship Scope of the planned investment: 1. As part of the construction of the voivodship road – the new DW 780 course will be carried out the following construction works in lines separating the national road runway – the A-4 motorway: — construction of the intersection of the “medium roundabout” type – extension of the inlets of the motorway link (ul. Mirowska) – construction and reconstruction of foot-bike lines – reconstruction of the road ditch – construction and reconstruction of rainwater drainage and sewers – construction of street lighting – reconstruction of the power grid of medium voltage 2. As part of the construction of the voivodship road – the new DW 780 course will be carried out the following construction works in lines separating the belt of the voivodship road no. 780: — construction of the Voivodeship road No. 780, 7.0 m wide, two lanes of 2x3,5 m class G distance 1060.20 m – construction of the bridge over the Sanka river in km of river 0 + 942, in km DW780 0+ 668 (1), with the total length of Lc=62.0m total length, construction of the local road, the construction of the theoretic length Lt=11,8 + 18,1 + 11,8 m, total width B=13,94 m/14 (English)
    20 October 2020
    0 references
    Construction d’une nouvelle route provinciale no 780 d’une longueur de 1 060,20 m de l’ul. Le prince Józef reliera le contournement sud de Cracovie — l’autoroute A4 à la jonction Mirowski et l’extension de la route provinciale no 780 sur une longueur de 162,5 m (ul. Prince Joseph) et l’extension de la liaison autoroutière sur une longueur de 80,50 m à Cracovie et dans le village de Kryspinów, la commune de Liszki, le district de Cracovie, la voïvodie de Małopolska. 1. Dans le cadre de la construction de la route de voïvodie — le nouveau parcours de la DW 780, les travaux de construction suivants seront réalisés sur les lignes délimitant la voie nationale — l’autoroute A-4: — construction d’une intersection «point rond moyen» à quatre entrées — extension des entrées de la liaison autoroutière (ul. Mirowska) — construction et reconstruction de pistes piétonnes-vélos — reconstruction d’un fossé routier — construction et reconstruction d’un système de drainage des eaux de pluie avec des canaux — construction d’éclairage public — reconstruction du réseau électrique moyenne tension 2. Dans le cadre de la construction de la route de voïvodie — la nouvelle route DW 780 sera réalisée les travaux de construction suivants sur les lignes délimitant la route de voïvodie no 780: — construction d’une route provinciale no 780 de largeur de 7,0 m, avec deux voies de 2x3,5 m de longueur de classe G de 1 060,20 m — construction d’un pont au-dessus de la rivière Sanka en km de rivière 0 + 942, en km DW780 0 + 668 (1), avec une longueur hors tout Lc=62,0 m, portée théorique Lt=11, 8+ 18,1+ 11,8 m, largeur totale B=13,94 m/14,29 m — construction d’une intersection à quatre entrées «petit rond-point» — construction d’une entrée nord du rond-point à la route municipale, — extension de la route provinciale no 780 avec chaussée, — construction de l’accès à l’exploitation et de l’entretien de fossés scellés conçus, équipement de nettoyage conçu, pour les services d’entretien pour l’exploitation de la structure de pont prévue sur la rivière Sanka — construction d’une route piétonne-bicyclette — construction d’un trottoir — construction de fossés routiers à fuites (trapezic) à l’intérieur de la route prévue des navires de guerre (French)
    1 December 2021
    0 references

    Identifiers

    RPMP.07.01.01-12-0062/15
    0 references