Renovation of the building of the Municipal Office in Lasowice Wielkie with installation of heat pump and photovoltaic equipment (Q114856)
Jump to navigation
Jump to search
Project Q114856 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of the building of the Municipal Office in Lasowice Wielkie with installation of heat pump and photovoltaic equipment |
Project Q114856 in Poland |
Statements
485,306.25 zloty
0 references
621,948.3 zloty
0 references
78.03 percent
0 references
1 May 2019
0 references
31 October 2019
0 references
GMINA LASOWICE WIELKIE
0 references
Projekt realizowany przez Gminę Lasowice Wielkie polega na wykonaniu prac zmierzających do głębokiej modernizacji energetycznej budynku użyteczności publicznej, w którym ma siedzibę Urząd Gminy Lasowice Wielkie oraz Gminny Ośrodek Pomocy Społecznej. Obiekt zlokalizowany jest w Lasowicach Wielkich 99A, w powiecie kluczborskim. Zakres rzeczowy projektu obejmuje: montaż gruntowej dwustopniowej pompy ciepła solanka – woda o mocy Q=57,6kW ze sterowaniem umożliwiającym automatyczną regulację temperatury wody grzewczej wychodzącej z pompy w zależności od temperatury zewnętrznej, jak i wewnątrz obiektu - zasilanej z instalacji PV zainstalowanej w ramach projektu - 80 szt. naziemnych paneli fotowoltaicznych o łącznej mocy AC 24,8kWp, wymianę wewnętrznej instalacji centralnego ogrzewania (tj. m.in. wymiana grzejników wraz z głowicami termostatycznymi - szt.39), zamianę istniejącej kotłowni opalanej paliwem stałym na centralę cieplną (szt.1) wraz z pracami towarzyszącymi (robotami rozbiórkowymi, robotami murowymi, malowanie), wymianę wyeksploatowanych opraw świetlówkowych i żarowych na nowe energooszczędne oprawy ze źródłami typu LED. Planowane do realizacji działania wynikają z przeprowadzonego audytu energetycznego i sugerowanego optymalnego wariantu. W wyniku realizacji przedmiotowego projektu wzrośnie efektywność energetyczna, emisja gazów cieplarnianych spadnie o 94,20% oraz nastąpi zwiększenie udziału energii odnawialnej o 87,7%. Projekt będzie realizowany w 2019 roku. Efekt projektu – dysponowanie przez Gminę Lasowice Wielkie obiektem o wysokich parametrach energooszczędności (szt.1) oraz o ekologicznym i wydajnym systemie wytwarzania energii na własne potrzeby (szt.1), przyczyniającym się do spadku emisji gazów cieplarnianych oraz zwiększenia oszczędności energii. Bezpośrednimi produktami projektu będą również: powierzchnia użytkowa budynku poddanego termomodernizacji - 717,54 m2 oraz liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE - szt. 1 (Polish)
0 references
The project implemented by the Municipality of Lasowice Wielkie consists of carrying out works aimed at deep energy modernisation of the public utility building, in which the Municipal Office of Lasowice Wielkie and the Municipal Centre for Social Welfare are located. The facility is located in Lasowice Wielkie 99A, in Keybor County. The project’s material scope includes: installation of a two-stage heat pump brine – water with power Q=57.6 kW with control enabling automatic control of the temperature of heating water coming out of the pump depending on the external temperature and inside the facility – powered from PV installation installed in the project – 80 pieces of ground heat exchange panels with a total power of AC 24,8kWp. The planned action results from the energy audit carried out and the suggested optimal option. As a result of this project, energy efficiency will increase, greenhouse gas emissions will fall by 94.20 % and the share of renewable energy will be increased by 87.7 %. The project will be implemented in 2019. Project effect – Lasowice Municipality has a large facility with high energy efficiency parameters (pc.1) and an ecological and efficient system of self-contained energy generation (pc.1), which contributes to reducing greenhouse gas emissions and increasing energy savings. Direct products of the project will also be: usable area of the thermally upgraded building – 717.54 m² and number of built units of thermal energy production from RES – pcs. 1 (English)
20 October 2020
0 references
Le projet mis en œuvre par la municipalité de Lasowice Wielkie consiste à réaliser des travaux de modernisation énergétique profonde du bâtiment d’utilité publique dans lequel se trouve le bureau municipal de Lasowice Wielkie et le centre municipal de protection sociale. L’établissement est situé à Lasowice Wielkie 99A, dans le quartier de Keybork. Le champ d’application du projet comprend: installation d’une pompe à chaleur en saumure à deux étages — eau d’une puissance de Q=57,6 kW avec contrôle permettant un contrôle automatique de la température de l’eau de chauffage sortant de la pompe en fonction de la température extérieure et à l’intérieur de l’installation — alimentée par l’installation photovoltaïque installée dans le cadre du projet — 80 pièces de panneaux photovoltaïques hors sol avec une puissance totale de 24,8 kWp, remplacement du système de chauffage central interne (c.-à-d. remplacement des radiateurs avec têtes thermostatiques — pcs.39), remplacement d’une chaudière à combustible solide existante dans une unité de contrôle thermique (point 1) avec des travaux d’accompagnement (robots de construction, travaux de maçonnerie, peinture, remplacement de luminaires à haute efficacité fluorescente et électroluminescente). L’action envisagée résulte de l’audit énergétique effectué et de l’option optimale suggérée. Ce projet permettra d’accroître l’efficacité énergétique, de réduire les émissions de gaz à effet de serre de 94,20 % et d’augmenter la part des énergies renouvelables de 87,7 %. Le projet sera mis en œuvre en 2019. Le projet a pour effet que la municipalité de Lasowice dispose d’une grande installation comportant des paramètres d’efficacité énergétique élevés (point 1) et d’un système écologique et efficace d’énergie autogénératrice (point 1), ce qui contribue à réduire les émissions de gaz à effet de serre et à accroître les économies d’énergie. Les produits directs du projet seront également les suivants: surface utilisable du bâtiment en cours de modernisation thermique — 717,54 m² et nombre d’unités de production de chaleur SER construites — pcs. 1 (French)
1 December 2021
0 references
Identifiers
RPOP.03.02.01-16-0001/18
0 references