Implementation of thermal modernisation works and the use of renewable energy sources in F.U.H. Rolbud buildings (Q112140)
Jump to navigation
Jump to search
Project Q112140 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Implementation of thermal modernisation works and the use of renewable energy sources in F.U.H. Rolbud buildings |
Project Q112140 in Poland |
Statements
362,845.65 zloty
0 references
530,318.57 zloty
0 references
68.42 percent
0 references
17 July 2019
0 references
17 July 2021
0 references
FIRMA USŁUGOWO-HANDLOWA "ROLBUD" SPÓŁKA JAWNA ZOFIA I WŁADYSŁAW SYCHOWSCY
0 references
Projekt jest częścią zintegrowanego regionalnego przedsięwzięcia dotyczącego ograniczenia niskiej emisji oraz wykorzystania odnawialnych źródeł energii. Przedmiotem projektu jest termomodernizacja dwóch budynków należących do Wnioskodawcy mająca na celu obniżenia zużycia ciepła i zanieczyszczenia powietrza. Na podstawie wykonanego audytu energetycznego budynków biurowomagazynowego, handlowego wymagane jest przeprowadzenie termomodernizacji w celu wyżej wspomnianego zmniejszenia zapotrzebowania na energię. Na podstawie dokonanej oceny wynikającej z przeprowadzonego audytu energetycznego optymalnym wariantemprzedsięwzięcia termomodernizacyjnego w powyżej opisanych budynkach jest Wariant I polegający na:Budynek sali sprzedeżowej: 1. Ocieplenie podłogi na gruncie w piwnicy2. Ocieplenie podłogi na gruncie na parterze3. Ocieplenie ścian zewnętrznych parteru4. Ocieplenie stropodachu5. Wymiana okien 6. Wymiana drzwi zewnętrznych 7. Wymiana istniejącego źródła ciepła na kocioł o wyższej sprawności zasilany gazem ziemnym Budynek magazynowy:1. Ocieplenie podłogi na gruncie 2. Ocieplenie ścian zewnętrznych 3. Ocieplenie dachu4. Wymiana okien 5. Wymiana drzwi zewnętrznych 6. Wymiana bram przemysłowych 7. Wymiana istniejącego źródła ciepła na gruntową pompę ciepła 8. Montaż instalacji fotowoltaicznej szczegółowy opis w punkcie F. Zakres rzeczowy projektuWnioskodawca posiada pełną gotowość do realizacji operacji tj. posiada dokumenty formalnoprawne nie wnoszącezastrzeżeń do realizacji programu zgodnie z niniejszymi zadaniami. Wnioskodawca posiada prawa własnościowe dobudynku w której zostanie zrealizowana operacja. Na podstawie wykonanego audytu stwierdzono iż poddanietermomodernizacji dwóch budynków jest konieczne i zasadne w celu zwiększenia efektywności energetycznej dopoziomu : . Natomiast emisja CO2 nowej instalacji w odniesieniu do stanu z istniejącej instalacji spadnie o (Polish)
0 references
The project is part of an integrated regional project to reduce low emissions and the use of renewable energy sources. The object of the project is the modernisation of two buildings belonging to the Applicant with the aim of reducing the consumption of heat and air pollution. On the basis of an energy audit of the office warehouse buildings, a thermomodernisation is required in order to reduce the energy demand mentioned above. On the basis of the assessment resulting from the energy audit carried out, the optimal option of thermomodernisation in the buildings described above is Option I, which consists of: 1. Warming the floor on the ground in the basement2. Floor warming on ground floor3. Warming of the outer walls of the ground floor4. Warming of the ceiling5. Window replacement 6. Replacement of external doors 7. Replacement of existing heat source for higher efficiency boiler powered by natural gas Warehouse building:1. Floor warming on ground 2. Warming of the outer walls 3. Roof warming4. Window replacement 5. Replacement of external doors 6. Replacement of industrial gates 7. Replacement of existing heat source for ground heat pump 8. Installation of a photovoltaic installation detailed description in point F. Physical scope of the projectThe applicant has full readiness to carry out the operation, i.e. has formal legal documents that do not object to the implementation of the programme in accordance with these tasks. The applicant holds ownership of the building in which the operation will be carried out. On the basis of the audit, it was found that the thermal modernisation of two buildings was necessary and justified in order to increase energy efficiency to the level of: .. On the other hand, the CO2 emissions of the new installation in relation to the status of an existing installation will fall by (English)
20 October 2020
0 references
Le projet s’inscrit dans le cadre d’un projet régional intégré visant à réduire les faibles émissions et l’utilisation des sources d’énergie renouvelables. Le projet concerne la thermomodernisation des deux bâtiments de la requérante visant à réduire la consommation de chaleur et la pollution de l’air. Sur la base de l’audit énergétique des bâtiments de bureaux et commerciaux, une thermomodernisation est nécessaire pour réduire la demande d’énergie mentionnée ci-dessus. Sur la base de l’évaluation résultant de l’audit énergétique effectué, l’option optimale du projet de thermomodernisation dans les bâtiments susmentionnés est la variante I composée de la salle na:Budynek: 1. Réchauffement du sol au sol au sous-sol2. Réchauffement du sol sur le sol sur le sol3. Isolation des murs extérieurs du rez-de-chaussée4. Réchauffement du terrain5. Remplacement des fenêtres 6. Remplacement des portes extérieures 7. Remplacement d’une source de chaleur existante par une chaudière à haut rendement alimentée par un bâtiment d’entrepôt au gaz naturel:1. Chauffer le sol sur le sol 2. Isolation des murs extérieurs 3. Réchauffement du toit4. Remplacement des fenêtres 5. Remplacement des portes extérieures 6. Remplacement des portes industrielles 7. Remplacement d’une source de chaleur existante par une pompe à chaleur souterraine 8. Installation d’une installation photovoltaïque description détaillée au point F. Le champ d’application matériel du projetLe demandeur est pleinement prêt à réaliser l’opération, c’est-à-dire qu’il dispose de documents officiels ne faisant pas de réserves à l’égard de la mise en œuvre du programme conformément à ces tâches. Le demandeur est propriétaire du bâtiment dans lequel l’opération sera réalisée. Sur la base de l’audit, il a été constaté que la thermomodernisation de deux bâtiments était nécessaire et justifiée afin d’augmenter l’efficacité énergétique aux niveaux suivants: . En revanche, les émissions de CO2 de la nouvelle installation par rapport à l’état de l’installation existante diminueront de (French)
1 December 2021
0 references
Identifiers
RPMP.04.02.00-12-0326/18
0 references