Construction of a sewage treatment plant in Krempachy with the construction of a sewage system in Krempachy. (Q112669)

From EU Knowledge Graph
Revision as of 19:59, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Dans le cadre de l’investissement, 10,75 km de réseau d’assainissement à Krempachy seront construits: DN 300 160 mm avec une longueur de 7 362,10 m et raccords gravitationnels de 160 mm en PVC et tuyau d’extrusion PE de 50 mm d’une longueur totale de 3 393,60 m.L’investissement implique également la construction d’une station d’épuration mécanique biologique des eaux usées à Krempachy. Capacité de la station de traitement: débit horaire maximum...)
Jump to navigation Jump to search
Project Q112669 in Poland
Language Label Description Also known as
English
Construction of a sewage treatment plant in Krempachy with the construction of a sewage system in Krempachy.
Project Q112669 in Poland

    Statements

    0 references
    4,687,346.37 zloty
    0 references
    1,124,963.13 Euro
    13 January 2020
    0 references
    6,260,647.02 zloty
    0 references
    1,502,555.28 Euro
    13 January 2020
    0 references
    74.87 percent
    0 references
    1 October 2017
    0 references
    31 December 2019
    0 references
    GMINA NOWY TARG
    0 references
    W ramach inwestycji wybudowane zostanie 10,75 km sieci kanalizacyjnej w m. Krempachy: DN 300 160 mm o długości 7.362,10 m oraz przyłączy grawitacyjnych rury PCV 160 mm i tłocznych rury PE 50 mm o łącznej długości 3.393,60 mb.Inwestycja zakłada też budowę mechanicznobiologicznej oczyszczalni ścieków w miejscowości Krempachy. Wydajność oczyszczalni: przepływ max godzinowy Qhmax 76,7 m3h przepływ średniodobowy Qdśr 500 m3d przepływ max dobowy Qdmax 800 m3dW ramach budowy oczyszczalni ścieków w m. Krempachy planuje się budowę: budynek socjalny: kubatura 611 m3, pow. zab. 135,59 m2 budynek technologiczny: 750 m3, 138,78 m2 budynek odwadniania osadów: 533 m3, 106,56 m2Przestrzegania przez aglomerację będącą przedmiotem projektu przepisów dyrektywy dotyczącej oczyszczania ścieków komunalnych: Stan przed realizacją.Ładunek aglomeracji RLM 0Poziom zbierania w ładunku 0Poziom powiązania w ładunku 0IAS pojedyncze systemy i inne właściwe systemy: w ładunku 0Wydajność oczyszczalni ścieków komunalnych obsługującej daną aglomerację RLM 0 RLMObowiązujący poziom oczyszczania oczyszczanie wtórneWydajność oczyszczania 0 RLM Stan po realizacji:Ładunek aglomeracji RLM 2660Poziom zbierania w ładunku 70,68 W m. Nowa Biała część kanalizacji zostanie wybudowana w późn. terminie.Poziom powiązania w ładunku 70,68IAS pojedyncze systemy i inne właściwe systemy: w ładunku 0Wydajność oczyszczalni ścieków komunalnych obsługującej daną aglomerację RLM Obiekt nowy, wydajność oczyszczalni 500md, zapewnia oczyścić cały ładunek aglomeracji 3767Obowiązujący poziom oczyszczania: BZT525, ChZT125, SS35, N15, P2Wydajność oczyszczania 500 md (Polish)
    0 references
    As part of the investment, 10.75 km of sewage network will be built in Krempachy: Dn 300160 mm with a length of 7362.10 m and gravitational connections of 160 mm PVC pipe and 50 mm PE pipe with a total length of 3.393.60 m.The investment also assumes the construction of a mechanical sewage treatment plant in Krempachy. Efficiency of the treatment plant: hourly flow Qhmax 76.7 m3h medium daily flow Qdśr 500 m3d max daily flow Qdmax 800 m3dThe construction of a sewage treatment plant in m. Krempachy is planned to build: social building: cubicure 611 m³, per. tob. 135,59 m² technological building: 750 m³, 138,78 m² sediment drainage building: 533 m³, 106,56 m2Respect by agglomeration which is the subject of the draft provisions of the Urban Waste Water Treatment Directive: Load of the agglomeration RLM 0Aggregation level in cargo 0 Level of connection in cargo 0IAS single systems and other relevant systems: in cargo 0The efficiency of the municipal waste water treatment plant supporting the RLM 0 RLM agglomeration level of secondary treatmentThe treatment efficiency of 0 RLM Condition after implementation:The load load RLM 2660Receiving level of collection in cargo 70,68 W m. The new White part of the sewer will be built late.The level of connections in the load 70,68IAS single systems and other relevant systems: in cargo 0The efficiency of the municipal waste water treatment plant supporting the RLM agglomeration The new facility, 500md treatment plant efficiency, ensures cleansing of the entire agglomeration charge 3767Applicable level of treatment: BZT525, COD125, SS35, N15, P2 Purification efficiency 500 md (English)
    20 October 2020
    0 references
    Dans le cadre de l’investissement, 10,75 km de réseau d’assainissement à Krempachy seront construits: DN 300 160 mm avec une longueur de 7 362,10 m et raccords gravitationnels de 160 mm en PVC et tuyau d’extrusion PE de 50 mm d’une longueur totale de 3 393,60 m.L’investissement implique également la construction d’une station d’épuration mécanique biologique des eaux usées à Krempachy. Capacité de la station de traitement: débit horaire maximum Qhmax 76,7 m3h débit moyen-jour Qdśr 500 m3d débit journalier max Qdmax 800 m3dDans le cadre de la construction d’une station d’épuration en m. Krempachy est prévu de construire: construction sociale: volume de 611 m³, surface 135,59 m² de bâtiment technologique: 750 m³, 138,78 m² bâtiment d’assèchement des sédiments: 533 m³, 106,56 m2Conformité par l’agglomération couverte par le projet de dispositions de la directive relative au traitement des eaux urbaines résiduaires: Condition préalable à la mise en œuvre.Load of agglomérations p.e. 0Niveau de collecte en charge 0Niveau de raccordement dans la charge 0IAS systèmes individuels et autres systèmes pertinents: dans la charge 0Officiency de l’usine de traitement des eaux urbaines résiduaires desservant une agglomération donnée p.e. 0 RLMO Niveau applicable de traitement secondaireOffectives 0 E.P. Etat après mise en œuvre: Charge de l’agglomération p.e. 2660Niveau de collecte en charge 70,68 W m. La nouvelle partie blanche du système d’égouts sera construite à une date ultérieure.Le niveau de raccordement dans les systèmes de charge 70,68IAS et autres systèmes appropriés: en charge 0La capacité de l’usine de traitement des eaux urbaines résiduaires desservant une agglomération donnée p.e. La nouvelle installation, la capacité de la station de traitement de 500 md, assure le nettoyage de l’ensemble de la charge de l’agglomération 3767Niveau de traitement applicable: BZT525, ChZT125, SS35, N15, P2P Capacité de purification 500md (French)
    1 December 2021
    0 references