Reconstruction and expansion of the building at ul. Czech Republic in Limanowa for the needs of the Culture House with a showroom (Q112806)
Jump to navigation
Jump to search
Project Q112806 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and expansion of the building at ul. Czech Republic in Limanowa for the needs of the Culture House with a showroom |
Project Q112806 in Poland |
Statements
1,817,488.26 zloty
0 references
4,192,151.71 zloty
0 references
43.35 percent
0 references
3 April 2017
0 references
31 March 2020
0 references
MIASTO LIMANOWA
0 references
W ramach projektu zaprojektowano przebudowę i rozbudowę sali widowiskowej poprzez powiększenie widowni do 439 miejsc. Powiększenie sceny wraz z rozbudową zaplecza scenicznego w postaci garderób, magazynów i niezbędnego zaplecza technicznego. Rozbudowę foyer wraz z punktem szatniowo-kasowym i węzłem sanitarnym. Zaprojektowano dostosowanie obiektu dla potrzeb osób niepełnosprawnych. Zaprojektowano również termomodernizację budynku i przebudowę elewacji wraz z wymianą stolarki okiennej i drzwiowej. Bryłę sali widowiskowej wyodrębniono wizualnie poprzez zastosowanie ażurowych elementów elewacji. Zaprojektowano nową strefę wejściową do budynku. W zakresie zagospodarowania działki przewidziano wykonanie utwardzenia terenu (dojścia i dojazdy). Dodatkowe wyjaśnienia: Zakres rzeczowy projektu obejmują działania inwestycyjne: 1.1 Prace rozbiórkowe i demontażowe 1.2 Stan surowy zamknięty budynku - część dobudowana i roboty adaptacyjne w części istniejącej 1.3 Roboty wykończeniowe wewnętrzne 1.4 Roboty wykończeniowe zewnętrzne 1.5 Roboty instalacyjne 1.6 Instalacja elektryczna 1.7 Instalacja teletechniczna 1.8 Plac przy budynku 1.9 Wyposażenie Sali Widowiskowej 1.10 Adaptacja części komercyjnej na szatnie oraz toalety oraz działania związane z pozostałymi kosztami: 2.1 Nadzór inwestorski 2.2 Nadzór autorski 2.3 Certyfikat energetyczny 2.4 Promocja projektu (Polish)
0 references
The project was designed to rebuild and expand the showroom by enlarging the audience to 439 seats. Enlarged stage with the expansion of stage facilities in the form of wardrobe, warehouses and necessary technical facilities. Expansion of the foyer along with the dressing room and cash register and sanitary knot. An adaptation of the facility was designed for the needs of people with disabilities. The building was also designed to modernise the building and rebuild the facade along with the replacement of window and door carpentry. The shape of the showroom was visually separated by the use of openwork elements of the facade. A new entrance area has been designed to enter the building. In the area of land management, there is a plan to make a hardening of the area (access and access). Additional explanations: The project’s material scope includes investment activities: 1.1 Dismantling and dismantling work 1.2 Raw closed condition of the building – built-in part and adaptation works in the existing part 1.3 Interior works 1.4 External finishing works 1.5 Installation work 1.6 Electrical installation 1.7 Teletechnical installation 1.8 Square at the building 1.9 Equipment of the View Hall 1.10 Adaptation of the commercial part on the dressing room and toilets and activities related to the remaining costs: 2.1 Investor supervision 2.2 Copyright supervision 2.3 Energy certificate 2.4 Project promotion (English)
20 October 2020
0 references
Identifiers
RPMP.06.01.03-12-0380/16
0 references