Construction of a system of bicycle paths and walking tracks in the district road from Aleksandrowice to the intersection with the voivodeship road in Balice on the A4 motorway in Zabierzów (Q112519)
Jump to navigation
Jump to search
Project Q112519 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a system of bicycle paths and walking tracks in the district road from Aleksandrowice to the intersection with the voivodeship road in Balice on the A4 motorway in Zabierzów |
Project Q112519 in Poland |
Statements
3,268,496.0 zloty
0 references
3,845,290.01 zloty
0 references
85.0 percent
0 references
29 May 2017
0 references
31 December 2020
0 references
GMINA ZABIERZÓW
0 references
Przedmiotem projektu jest wykonanie projektów i zrealizowanie na ich podstawie kompletnych co do niezbędnego asortymentu, niżej wymienionych robót budowlanych w ciągu drogi powiatowej na długości ok. 2780 m tj. od ok km 2550 w m. Balice do ok km 5320 w m. Aleksandrowice według przyjętego hektometrażu roboczego zastosowanego dla opisania odcinków drogi do wniosku o wydanie decyzji środowiskowej.W tym odcinku drogi zostaną zaprojektowane i wykone, ścieżki rowerowe, ciągi pieszorowerowe, modernizacja odwodnienia w związku z budową ww. elementów infrastruktury rowerowej w tym kanalizacja opadową jeśli będzie konieczna, modernizacja oświetlenia ulicznego oraz wszelkie roboty towarzyszące.Szacunkowe ilości robót:1.budowa chodników, peronów na przystankach na długości ok. 157m2.budowa ścieżki rowerowej na długości ok. 945 m3.budowa ciąg pieszorowerowego na długości ok. 2776 m4.budowa i modernizacja oświetlenia ulicznego na długości ok. 2530 m5.modernizacja odwodnienia w związku z budową infrastruktury rowerowej, w tym budowa kanalizacji deszczowej na długości ok. 825 m6.przedłużenie przepustów pod drogą powiatową, wymuszone budową infrastruktury rowerowej szt. 27.budowa przejazdów przez ciągi rowerowe i pieszorowerowe w miejscu istniejących zjazdów8.rozbiórka kolidujących ogrodzeń, bram i furtek9.wycinka kolidującej zieleni wysokiejParamenty projektowanych elementówaszerokość jednokierunkowej ścieżki rowerowej:1,70 mbszerokość ciągu pieszorowerowego z jednokierunkowym ruchem rowerowym :2,50 mcszerokość ciągu pieszorowerowego z dwukierunkowym ruchem rowerowym :3,50 mdszerokość chodników przy jezdni:2,0 meszerokość peronów przystankowych:1,5 mfszerokość zjazdów indywidualnych:zgodnie ze stanem istniejącym, min. 3,0 mgszerokość zjazdów publicznych:zgodnie ze stanem istniejącym, min. 3,5 m (Polish)
0 references
The object of the project is to carry out projects on the basis of them complete assortment of the necessary assortment, the following construction works within the district road for approx. 2780 m, i.e. from approx. 2550 in Balice to approx. km 5320 in Aleksandrowice according to the adopted work hectometer used to describe the sections of the road to the application for an environmental decision.In this section the roads will be designed and constructed, cycle paths, walking cycles, modernisation of drainage works in connection with the construction of the above-mentioned bicycle infrastructure elements including rain drainage if necessary, modernisation of periphery lengths and all associated works. 157 m². construction of the bike path approx. 945 m³. construction of a footbike along the length of approx. 2776 m4.construction and modernisation of street lighting approx. 2530 m5.modernisation of dehydration in connection with the construction of bicycle infrastructure, including the construction of rainwater drainage over a length of approx. 825 m6.Extension of culverts under the district road, forced by the construction of bicycle infrastructure, pc. 27.construction of crossings through cycle and footways at the site of existing exits8.decommissioning fences, gates and gates9.cut of colliding greenery high-growthParaments of designed element aswidth of one-way cycle path:1.70 MBS speed of walking distance with one-way cycle traffic:2,50 min. (English)
20 October 2020
0 references
L’objet du projet est de réaliser des projets et de réaliser sur la base de ceux-ci un assortiment complet de travaux de construction énumérés ci-dessous pendant la route de district sur une longueur d’environ. 2 780 m, soit d’environ 2 550 km à Balice à environ 5 320 km à Aleksandrowice selon l’héctométrie adoptée pour décrire des tronçons de la route à la demande de décision environnementale.Dans ce tronçon de la route sera conçu et construit, pistes cyclables, pistes de marche, modernisation du drainage en liaison avec la construction des éléments susmentionnés de l’infrastructure cyclable, y compris l’eau de pluie si nécessaire, modernisation de l’éclairage des rues et tous les travaux d’accompagnement. 157 m². construction d’une piste cyclable sur une longueur d’env. 945 m³. construction d’une ligne de marche sur une longueur d’env. 2776 m4.construction et modernisation de l’éclairage public sur une longueur d’env. 2530 m5.modernisation du drainage dans le cadre de la construction d’infrastructures cyclables, y compris la construction d’égouts d’eau de pluie sur une longueur d’env. 825 m6.extension des ponceaux sous la route de district, construction forcée d’infrastructures cyclables 27.construction de passages à niveau à travers des voies cyclables et piétonnes à l’emplacement des sorties existantes8.Dépannage de clôtures, de portes et de portes en conflit9.coupement des collisions vertsParaments des éléments prévusLa taille du chemin à sens unique rowerowej:1,70 mbswidth de la ligne piétonne avec mouvement unidirectionnel rowerowym:2,50 mcwidth de la trajectoire piétonne avec mouvement bidirectionnel rowerowym:3,50 mdslargeur des trottoirs à la largeur des plates-formes à l’état existant, min. 3,0 mgge largeur des sorties avec état existant, min. 3,5 mg (French)
1 December 2021
0 references
Identifiers
RPMP.04.05.01-12-0964/17
0 references