Creation of a modern Municipal Waste Collection Point in Targowisk (Q112600)

From EU Knowledge Graph
Revision as of 19:54, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet en question est mis en œuvre dans le cadre de la procédure de conception et de construction sur la base du programme des services publics fonctionnels, qui répond aux exigences énoncées dans le règlement du ministre de l’infrastructure du 2 septembre 2004 sur la portée et la forme détaillées de la documentation de conception, les spécifications techniques pour l’exécution et l’acceptation des travaux de construction et le programme d’u...)
Jump to navigation Jump to search
Project Q112600 in Poland
Language Label Description Also known as
English
Creation of a modern Municipal Waste Collection Point in Targowisk
Project Q112600 in Poland

    Statements

    0 references
    1,545,359.09 zloty
    0 references
    370,886.18 Euro
    13 January 2020
    0 references
    1,818,069.53 zloty
    0 references
    436,336.69 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 April 2017
    0 references
    31 December 2020
    0 references
    GMINA KŁAJ
    0 references
    0 references
    Przedmiotowy projekt jest realizowany w procedurze zaprojektuj i wybuduj w oparciu o Program Funkcjonalno Użytkowy, który spełnia wymogi określone w Rozporządzeniu Ministra Infrastruktury z dnia 2 września 2004 r. w sprawie szczegółowego zakresu i formy dokumentacji projektowej, specyfikacji technicznych wykonania i odbioru robót budowlanych oraz programu funkcjonalnoużytkowego załączono do wniosku. Parametry techniczne zostaną uszczegółowione na etapie wykonywania projektu.Planowana inwestycja obejmować będzie zaprojektowanie oraz budowę:Budynku biurowego wraz z zapleczem socjalnym o powierzchni rzutu poziomego nie mniejszej niż 78 m2;Wiaty stalowej wraz ze stanowiskami warsztatowymi o powierzchni nie mniejszej niż 70m2;Rampy rozładunkowej PSZOK minimalna powierzchnia rampy 62,5 m2, minimalna powierzchnia podjazdów w rzucie 60 m2, maksymalny kąt pochylenia podjazdów 15o;Zewnętrznej instalacji kanalizacyjnej sanitarnej oraz deszczowej, wraz z separatorem substancji ropopochodnych 1szt. oraz osadnikiem 1szt. minimalna długość instalacji kanalizacyjnej 145 m bieżących, rury kanalizacyjne oraz kształtki o średnicy minimalnej 110mm;Zewnętrznej instalacji wodociągowej minimalna długość instalacji 100 metrów bieżących, rury i kształtki o średnicy minimalnej 110mm;Zewnętrznej instalacji elektrycznej minimalna długość 70 metrów bieżących;Oświetlenia zewnętrznego minimum 11 lamp, minimalna długość okablowania 280 metrów;Systemu łączności i monitoringu minimum 6 kamer;Instalacji technicznych minimalna długość 150 metrów bieżącychObiektów drogowych obejmujących:Układ komunikacji wewnętrznej zapewniający bezkolizyjną komunikację na terenie obiektu min. 410 m2;Wewnętrzne place manewrowych min. 2800 m2;Rozbiórkę istniejącego placu z kostki brukowej o powierzchni ok. 530m2 przy założeniu, że 80 materiału z rozbiórki będzie nadawało się do ponownego wykorzystania w ramach przedmiotowej inwestycji;Dalej pkt Q (Polish)
    0 references
    This project is implemented in a procedure designed and built on the basis of the Functional Use Program, which meets the requirements set out in the Regulation of the Minister of Infrastructure of 2 September 2004 on the detailed scope and form of design documentation, technical specifications for the execution and reception of construction works and the functional-use programme is attached to the proposal. The planned investment will include design and construction: office building with a floor space with a horizontal project area of not less than 78 m²; steel winding with workshop stations with a surface area of not less than 70 m²; minimum length of the internal installation of the installation PZOK minimum surface area of the ramp 62.5 m², minimum area of driveways in 60 m², maximum angle of sub-installation; 530 m² on the assumption that 80 demolition material will be suitable for re-use for the investment in question; (English)
    20 October 2020
    0 references
    Le projet en question est mis en œuvre dans le cadre de la procédure de conception et de construction sur la base du programme des services publics fonctionnels, qui répond aux exigences énoncées dans le règlement du ministre de l’infrastructure du 2 septembre 2004 sur la portée et la forme détaillées de la documentation de conception, les spécifications techniques pour l’exécution et l’acceptation des travaux de construction et le programme d’utilisation fonctionnelle est joint à la demande. Les paramètres techniques seront détaillés au stade de la mise en œuvre du projet.L’investissement prévu comprendra la conception et budowę:Budynku des espaces de bureaux avec une surface horizontale du projet d’au moins 78 m²; les vents d’acier avec des stations d’atelier d’une superficie d’au moins 70 m²; les rampes de déchargement PSZOK d’une superficie minimale de 62,5 m², la surface minimale des voies d’accès dans un jet de 60 m², l’angle d’inclinaison maximal de 15o; avec 1pcs séparateur de pétrole et 1pcs. longueur minimale du système d’égout 145 m courant, tuyaux et raccords d’un diamètre minimum de 110 mm; système d’alimentation en eau extérieure longueur minimale d’installation de 100 mètres de course, tuyaux et raccords d’un diamètre minimum de 110 mm; installation électrique externe longueur minimale de 70 mètres de course; éclairage extérieur minimum 11 lampes, longueur minimale de câblage 280 mètres; système de communication et de surveillance au moins 6 caméras;Installations techniques longueur minimale 150 mètres Courant Objets obejmujących:Układ Communication interne assurant une communication sans collision dans les locaux de l’installation min. 410 m²;Matériel de manœuvre interne min. 2 800 m²;éclatement d’un carré existant de chaussée d’une superficie d’env. 530 m² en supposant 80 matériaux de démolition seront réutilisables pour l’investissement; Point suivant Q (French)
    1 December 2021
    0 references

    Identifiers

    RPMP.05.02.02-12-0491/17
    0 references