Reconstruction of the power grid with SN and NN voltages allowing connection of electricity generation units from RES in the districts of Nowy Sądecki and Gorlicky (Q112107)

From EU Knowledge Graph
Revision as of 19:52, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La mise en œuvre du projet garantira le bon fonctionnement des réseaux électriques dans certaines localités des districts de Nowysądecki et Gorlicki, étendant ainsi la possibilité de raccorder de nouvelles unités de production d’électricité à partir de sources renouvelables en dispersion. Dans les municipalités où le projet est situé, une augmentation significative du nombre d’installations SER produisant de l’électricité est prévue. La plupart...)
Jump to navigation Jump to search
Project Q112107 in Poland
Language Label Description Also known as
English
Reconstruction of the power grid with SN and NN voltages allowing connection of electricity generation units from RES in the districts of Nowy Sądecki and Gorlicky
Project Q112107 in Poland

    Statements

    0 references
    3,541,067.37 zloty
    0 references
    849,856.17 Euro
    13 January 2020
    0 references
    5,893,920.44 zloty
    0 references
    1,414,540.91 Euro
    13 January 2020
    0 references
    60.08 percent
    0 references
    2 January 2019
    0 references
    31 March 2020
    0 references
    TAURON DYSTRYBUCJA SPÓŁKA AKCYJNA
    0 references
    0 references
    Realizacja projektu zapewni prawidłowe funkcjonowanie sieci elektroenergetycznych na terenie wybranych miejscowości powiatu nowosądeckiego i gorlickiego poszerzając możliwość przyłączania nowych jednostek wytwarzania energii elektrycznej ze źródeł odnawialnych w rozproszeniu. W gminach gdzie zlokalizowany jest projekt planowany jest znaczący wzrost ilości instalacji OZE wytwarzających energię elektryczną. Zadania polegają w przeważającej części na budowie sieci SN kablowych i napowietrznych. Planuje się nowe odcinki sieci dla poprawy pewności zasilania poprzez wzajemne rezerwowanie się sieci SN. Planuje się również w niezbędnym zakresie przebudowy istniejących linii SN i nN ze względu na zły stan techniczny istniejących sieci oraz ich znaczenie. Projekt składa się z czterech zadań:Zadanie 1. Budowa powiązania sieci SN 30kV pomiędzy stacjami transformatorowymi nr 8523 Biała Wyżna 06 i nr 8656 Ptaszkowa 07;Zadanie 2. Budowa powiązania elektroenergetyczną siecią SN15kV pomiędzy stacjami transformatorowymi nr 8180 Gostwica 2 i 8741 Długołęka 3;Zadanie 3. Budowa linii SN 15kV jako powiązanie pomiędzy stacją transformatorową Moszczenica 15 nr 81109 linia 15kV Rzepiennik, a stacją transformatorową Kwiatonowice 03 nr 81284 linia 15kV Biecz;Zadanie 4. Przebudowa sieci napowietrznej SN 15kV relacji Rożnów Tabaszowa na sieć dwutorową.Budowa nowych odcinków sieci oraz zwiększenie przekrojów sieci istniejących, a także modernizacja stacji transformatorowych pozwoli na zwiększenie mocy przyłączeniowej OZE. Zadania mają również na celu poprawę warunków zasilania oraz pewności zasilania odbiorców, poprzez wykonanie dodatkowych połączeń modernizowanych sieci. Inwestycje pozwolą Wnioskodawcy skuteczniej zarządzać energią elektryczną wytworzoną w ramach OZE. Wybrane rozwiązania techniczne oraz architektoniczne, przebudowa i budowa linii kablowych oraz napowietrznych, są rozwiązaniami najkorzystniejszymi dla ww. obszarów.Ciąg dalszy w punkcie Q. (Polish)
    0 references
    The implementation of the project will ensure the proper functioning of electricity networks in the selected towns of Nowy Sądecki and Gorlicki districts, extending the possibility of connecting new units of electricity generation from renewable sources in dispersion. In municipalities where the project is located, a significant increase in the number of RES installations producing electricity is planned. The tasks consist mainly of the construction of cable and overhead SN networks. New network sections are planned to improve power security by reserving SN networks. It is also planned to rebuild existing SN and NN lines to the necessary extent due to the poor technical condition of existing networks and their importance. The project consists of four tasks: Task 1. Construction of the connection of SN 30 kV between transformer stations 8523 Biała Wyżna 06 and No 8656 bird 07;Task 2. Construction of the electrical connection with the SN15 kV network between transformer stations No. 8180 Gostwica 2 and 8741 Długołęka 3;Task 3. Construction of line SN 15 kV as a link between the Moszczenica 15 transformer station no. 81109 line 15 kV Rzepiennik, and the transformer station Kwiatonowice 03 nr 81284 line 15 kV Biecz;Task 4. The conversion of the overhead network SN 15 kV of Rożnów Tabaszowa’s relationship into a two-track network.Construction of new sections of the network and increasing cross-sections of existing networks, as well as modernisation of transformer stations will allow to increase the connection power of RES. The tasks are also aimed at improving the conditions of power supply and the certainty of power supply, by making additional connections of modernised networks. The investments will allow the Applicant to manage the electricity generated by RES more effectively. Selected technical and architectural solutions, reconstruction and construction of cable and overhead lines are the most advantageous solutions for these areas. (English)
    20 October 2020
    0 references
    La mise en œuvre du projet garantira le bon fonctionnement des réseaux électriques dans certaines localités des districts de Nowysądecki et Gorlicki, étendant ainsi la possibilité de raccorder de nouvelles unités de production d’électricité à partir de sources renouvelables en dispersion. Dans les municipalités où le projet est situé, une augmentation significative du nombre d’installations SER produisant de l’électricité est prévue. La plupart des tâches consistent à construire des réseaux de câbles et de réseaux SN. De nouveaux tronçons de réseau sont prévus pour améliorer la sécurité d’approvisionnement grâce à la réservation croisée du réseau SN. Il est également prévu de reconstruire les lignes SN et NN existantes dans la mesure nécessaire en raison de l’état technique médiocre des réseaux existants et de leur importance. Le projet se compose de quatre zadań:Zadanie 1. Construction de la liaison du réseau SN 30 kV entre les stations de transformation no 8523 Biała Wyżna 06 et no 8656 Ptaszkowa 07;Tâche 2. Construction de la liaison électrique entre les stations de transformation no 8180 Gostwica 2 et 8741 Długołęka 3; tâche 3. Construction de la ligne SN 15 kV comme liaison entre la station de transformation Moszczenica 15 no 81109 ligne 15 kV Rzepiennik et la station de transformation Kwiatonowice 03 no 81284 ligne 15 kV Biecz; tâche 4. La reconstruction du réseau aérien SN 15 kV de la relation Rożnów Tabaszów en un réseau à double voie. La construction de nouveaux tronçons du réseau et l’augmentation des sections transversales des réseaux existants, ainsi que la modernisation des stations de transformation permettront d’augmenter la puissance de raccordement des SER. Les tâches visent également à améliorer les conditions d’alimentation et la sécurité de l’alimentation des clients par l’établissement de connexions supplémentaires aux réseaux modernisés. Les investissements permettront à la requérante de gérer plus efficacement l’électricité produite par les sources d’énergie renouvelables. Les solutions techniques et architecturales sélectionnées, la reconstruction et la construction de câbles et de lignes aériennes sont les solutions les plus avantageuses pour les zones ci-dessus. (French)
    1 December 2021
    0 references

    Identifiers

    RPMP.04.01.02-12-0276/18
    0 references