Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the districts of Dąbrowa and Tarnów (Q112100)
Jump to navigation
Jump to search
Project Q112100 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the districts of Dąbrowa and Tarnów |
Project Q112100 in Poland |
Statements
2,326,651.3 zloty
0 references
3,927,500.58 zloty
0 references
59.24 percent
0 references
22 July 2019
0 references
30 June 2020
0 references
TAURON DYSTRYBUCJA S.A.
0 references
Przedmiotem projektu jest modernizacja niedostosowanej infrastruktury energetycznej na terenie wybranych miejscowości powiatu dąbrowskiego i tarnowskiego do planowanych obciążeń. Modernizacja będzie polegać na wymianie odcinków sieci napowietrznej średniego napięcia SN, oraz budowie i modernizacji odcinków napowietrznych i kablowych sieci niskiego nN na nowe o zwiększonych przekrojach, a także wymianie części infrastruktury towarzyszącej, takiej jak: słupy, stacje transformatorowe, przyłącza napowietrzne oraz kablowe. Realizacja inwestycji zapewni prawidłowe funkcjonowanie sieci elektroenergetycznej poszerzając możliwości przyłączenia nowych jednostek wytwarzania energii elektrycznej ze źródeł odnawialnych OZE. Poniższe zadania mają również na celu poprawę warunków zasilania odbiorców indywidualnych zasilanych z sieci napowietrznej nN oraz pewności zasilania odbiorców.W celu zachowania optymalizacji kosztowej, większość zmodernizowanych odcinków linii zostanie poprowadzona po tej samej trasie; odstępstwa od tej zasady występują jedynie w miejscach, w których zmiana trasy była zależna od zgód na wejście w teren właścicieli gruntów lub uwarunkowań technicznych. Projekty wykonawcze dla wyszczególnionych zadań zostały pozytywnie uzgodnione w 2018r., co oznacza, że są zgodne z aktualnymi wymaganiami i normami w tym zakresie oraz z najlepszą praktyką w tej dziedzinie. Zastosowane w projektach rozwiązania są powszechnie wykorzystywane w tego typu zadaniach, ze względu na optymalną relację jakości do ceny.Łączna długość modernizowanych sieci dla OZE: łączna długość sieci przebudowywanych nN: 25 502,5 m, łączna długość sieci przebudowywanych SN: 461 m, łączna długość sieci budowanych nN: 677 m. (Polish)
0 references
The object of the project is to modernise the unsuitable energy infrastructure in selected districts of Dąbrowski and Tarnów to the planned burdens. The modernisation will consist of the replacement of the overhead sections of the medium-voltage SN, and the construction and modernisation of the overhead and cable sections of the low nN network with new ones with increased cross-sections, as well as the replacement of a part of the associated infrastructure, such as: poles, transformer stations, overhead and cable connections. The implementation of the investment will ensure the proper functioning of the electricity grid, extending the possibility of connecting new units of electricity generation from renewable sources of RES. The following tasks are also aimed at improving the supply conditions for individual customers powered from the overhead network nN and the certainty of supply to the customers.In order to maintain cost optimisation, most of the upgraded sections of the line will be conducted along the same route; derogations from this rule only occur in places where the change of route was dependent on permission to enter the landowners’ premises or technical conditions. Implementing projects for the specific tasks were agreed positively in 2018, which means that they are in line with current requirements and standards in this respect and with best practice in this field. The solutions used in the projects are commonly used in these tasks, due to the optimal quality-to-price ratio.The total length of modernised RES networks: total length of remodeled nN networks: 25502,5 m, total length of remodeled SN networks: 461 m, total length of nets built nN: It’s 677 m. (English)
20 October 2020
0 references
L’objet du projet est de moderniser les infrastructures énergétiques non adaptées dans certaines localités des districts de Dąbrowski et de Tarnów afin de répondre aux charges prévues. La modernisation consistera en le remplacement des tronçons du réseau aérien moyenne tension du SN, ainsi que par la construction et la modernisation des tronçons aériens et câbles du réseau low-nN par de nouvelles sections avec des sections transversales accrues, ainsi que par le remplacement des infrastructures d’accompagnement, telles que: poteaux, postes de transformateurs, connexions aériennes et câbles. La mise en œuvre de l’investissement garantira le bon fonctionnement du réseau électrique, en étendant la possibilité de raccorder de nouvelles unités de production d’électricité à partir de sources d’énergie renouvelables. Les tâches suivantes visent également à améliorer les conditions d’approvisionnement des clients individuels alimentés par le réseau aérien nN et la sécurité d’alimentation des clients. Afin de maintenir l’optimisation des coûts, la plupart des tronçons améliorés de la ligne seront effectués sur la même ligne; des dérogations à cette règle n’existent que dans les endroits où le réacheminement était subordonné à l’autorisation d’entrer dans des propriétaires fonciers ou à des conditions techniques. Les projets de mise en œuvre des tâches énumérées ont fait l’objet d’un accord positif en 2018, ce qui signifie qu’ils sont conformes aux exigences, aux normes et aux meilleures pratiques en vigueur dans ce domaine. Les solutions utilisées dans les projets sont largement utilisées dans ce type de tâches, en raison du rapport qualité-prix optimal. La longueur totale des réseaux mis à niveau pour les SER: longueur totale des filets reconstruits nN: 25 502,5 m, longueur totale du réseau reconstruit de SN: 461 m, longueur totale des filets construits nN: 677 m. (French)
1 December 2021
0 references
Identifiers
RPMP.04.01.02-12-0083/19
0 references