Leisure spaces in the city of Proszowice – a cultural area (Q114412)

From EU Knowledge Graph
Revision as of 19:47, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q114412 in Poland
Language Label Description Also known as
English
Leisure spaces in the city of Proszowice – a cultural area
Project Q114412 in Poland

    Statements

    0 references
    4,743,608.74 zloty
    0 references
    1,138,466.10 Euro
    13 January 2020
    0 references
    7,297,859.6 zloty
    0 references
    1,751,486.3 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 March 2018
    0 references
    28 February 2020
    0 references
    GMINA I MIASTO PROSZOWICE
    0 references
    Q2526764 (Deleted Item)
    0 references
    W ramach projektu planuje się przeprowadzić wszechstronny rozwój infrastruktury kultury w podobszarze rewitalizacji w Proszowicach. Prace będą prowadzone w Rynku i bezpośrednim sąsiedztwie. W nawiasie podano numery działań z punktu C.2.3.ETAP PRZYGOTOWAWCZY I PROMOCJAW ramach przygotowań zostanie opracowana dokumentacja projektowa na podstawie istniejącego PFU 1.1. Kupiona zostanie również działka pomiędzy CKiW i Biblioteką w Proszowicach 1.2. Przed przystąpieniem do właściwych prac zostaną zakupione elementy promocyjne źródeł finansowania 6.1. REALIZACJA PROJEKTU Nawierzchnia Rynku i układ komunikacyjny będą przebudowane tak, aby umożliwić ruch okrężny i ograniczyć go w północnej części terenu obiekty publiczne i Rynek stworzą jednolitą przestrzeń 2.1, 2.2, uzupełniona infrastruktura techniczna, m.in. umożliwi użytkowanie sprzętu audiovideo 2.3. Rynek dzięki małej architekturze i zieleni izolacyjnej 2.4, 2.5 będzie miejscem rozwoju kultury miejskiej. Zieleń ograniczy hałas i spaliny. Mała architektura da możliwość wypoczynku. Istniejący obiekt CKiW w Proszowicach będzie rozbudowany 3.1 i doposażony 3.2, co pozwoli na poszerzenie działalności. Między BP i CKiW powstanie pasaż handlowy 3.3. Ok. 100 metrów od Rynku modernizowany będzie amfiteatr 4.1 wraz z widownią i otoczeniem. Dostosowanie obiektu do potrzeb os. niepełnosprawnych odpowiadać będzie na problem starzenia się społeczeństwa i nasilanie się problemów zdrowotnych w podobszarze rewitalizacji. Rozbudowana 5.1 i doposażona 5.2 będzie Biblioteka powstaną przestrzenie biblioteczne i aktywności kulturalnej, a także niewielka przestrzeń muzealna. Zdezelowane tereny i obiekty na zapleczu biblioteki będą zagospodarowane. Rozwiązania w budynku będą elastyczne, np. mobilna sala konfer. Obiekt dostosowany dla os. niepełnosprawnych odpowiedź na starzenie się społecz. i problemy zdrowotne. Parametry pozwolą spełnić wymogi Narodowego Programu Rozwoju Czytelnictwa. (Polish)
    0 references
    The project plans to carry out a comprehensive development of cultural infrastructure in the sub-area of revitalisation in Proszowice. The work will be carried out in the market and in the immediate vicinity. In parentheses, the number of activities from point C.2.3.ETAP OF THE PROMOTIONS AND PROMOTIONAs part of the preparation, project documentation will be prepared on the basis of the existing PFU 1.1. A plot between CKiW and the Library in Proszowice 1.2 will also be purchased. Promotional elements of funding sources 6.1 will be purchased prior to the relevant work. Implementation of the Project Market Surface and communication system will be reconstructed to allow circular traffic and restrict it in the northern part of the area, and the Market will create a single space 2.1, 2.2, supplemented technical infrastructure, among others, will enable the use of audiovideo equipment 2.3. Thanks to small architecture and insulating green 2.4, 2.5, the market will be a place for the development of urban culture. Green will reduce noise and exhaust. Small architecture will give you the opportunity to relax. The existing CKiW facility in Proszowice will be extended 3.1 and equipped with 3.2, which will allow for expansion of the activity. Between BP and CKiW there will be a commercial passage 3.3. It’s okay. 100 meters from the Market Square, the amphitheater 4.1 will be modernised together with the audience and surroundings. Adapting the facility to the needs of people with disabilities will respond to the problem of ageing population and increasing health problems in the regeneration sub-area. The Library will be expanded 5.1 and equipped with 5.2. The library spaces and cultural activities will be created, as well as a small museum space. The damaged areas and objects in the back of the library will be managed. Solutions in the building will be flexible, e.g. a mobile conference room. Object adapted for people with disabilities responding to aging society. and health problems. The parameters will meet the requirements of the National Programme for the Development of Reading. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.11.01.02-12-0934/17
    0 references