Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design (Q3700755)
Jump to navigation
Jump to search
Project Q3700755 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design |
Project Q3700755 in France |
Statements
1,179,229.0 Euro
0 references
2,034,194.0 Euro
0 references
57.97 percent
0 references
15 January 2017
0 references
31 December 2019
0 references
SI D'EAU ET D'ASSAINISSEMENT DE MAYOTTE (SIEAM)
0 references
Réalisation des travaux de la rehausse de l'évacuateur de crues du barrage de Combani afin de modifier l'évacuateur en permettant le stockage d'un volume supplémentaire (élévation de la RN d'un mètre) tout en assurant un niveau de sûreté du barrage conforme aux exigences réglementaires. (French)
0 references
Completion of the upgrade of the Combani Dam Flood Evacuator in order to modify the evacuator by allowing the storage of an additional volume (increase of the RN by one metre) while ensuring a level of safety of the dam in accordance with regulatory requirements. (English)
22 November 2021
0 references
Durchführung der Arbeiten an der Aufrüstung des Hochwasserableiters des Staudamms von Combani, um den Evakuator zu ändern, indem die Speicherung eines zusätzlichen Volumens (Erhöhung der NR um einen Meter) bei gleichzeitiger Gewährleistung eines den gesetzlichen Anforderungen entsprechenden Sicherheitsniveaus des Staudamms ermöglicht wird. (German)
1 December 2021
0 references
Identifiers
PY0017590
0 references