Establishment of the Economic Activity Zone in Gorzków, Bochnia (Q111682)

From EU Knowledge Graph
Revision as of 12:20, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet en question concernant la création d’une zone d’activité économique à Gorzków dans la municipalité de Bochnia.Le projet était prévu pour zadania:Zadanie 1 Travaux préparatoires de la PFU, documentation du projet et des coûts, fin. et éco-analyse, ainsi que la préparation d’une description du projet, y compris le diagnostic et l’analyse des besoins pour les travaux de construction et d’assemblage des terrains de la tâche 2 et la constru...)
Jump to navigation Jump to search
Project Q111682 in Poland
Language Label Description Also known as
English
Establishment of the Economic Activity Zone in Gorzków, Bochnia
Project Q111682 in Poland

    Statements

    0 references
    1,889,970.36 zloty
    0 references
    453,592.89 Euro
    13 January 2020
    0 references
    2,223,494.63 zloty
    0 references
    533,638.71 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 April 2016
    0 references
    31 December 2019
    0 references
    GMINA BOCHNIA
    0 references
    Q2524457 (Deleted Item)
    0 references
    Przedmiotowy projekt dot. utworzenia strefy aktywności gospodarczej w miejscowości Gorzków w Gminie Bochnia.W ramach projektu zostały zaplanowane zadania:Zadanie 1 Prace przygotowawcze PFU, dokumentacja projektowokosztorysowa, analiza fin. i ekon. wraz z opracowaniem opisu projektu, w tym diagnoza i analiza zapotrzebowania na tereny inw.Zadanie 2 Roboty budowlanomontażowe:a Budowa dróg o łącznej dł. 0,40 km,b Budowa 1 skrzyżowania,c Budowa 58 zjazdów publicznych wraz z przepustami ostateczną ilość zjazdów zostanie uzgodniona z Zamawiającym na etapie tworzenia docelowej dokumentacji projektowej,d Budowa zjazdów indywidualnych wraz z przepustami ostateczną ilość zjazdów zostanie uzgodniona jw,e Budowa 24 przepustów pod projektowanymi drogami,f Wykonanie rowów odwadn. o łącznej długości 0,79km,g Wycinkę zieleni,h Rozbiórkę istniejących elementów i konstrukcji drogowych,i Wykonanie oznakowania pionowego i poziomego oraz urządzeń drogowych,j Budowę sieci wodoc. o dł. 650 m i 400 m,k Budowę sieci kanalizacji sanit. o dł. 900 m,l Budowę sieci elektroenergetycznej oświetleniowej o długości 400m,m Przebudowęzabezpieczenie istniej. uzbrojenia terenu jeżeli takie wystąpią w trakcie prac projektowych i wykonawczychZadanie 3. Nadzór inwestorskiZadanie 4. Promocja projektu.Zadanie 5. Zarządzanie projektem.Pow. całkowita SAG: 7,2624 ha.Projekt gwarantuje wyposażenie SAG w odpowiedniej jakości, kompleksową infrastrukturę: infrastruktura drogowa drogi wewnętrzne, infrastruktura wod.kan., sieć elektroenergetyczna oświetleniowa.Z uwagi na limit znaków: planowany zakres rzeczowy projektu z uwzględnieniem parametrów, danych, potwierdzenie przyjętych założeń technolog. przedstawiony został w pkt. C.2.3 Zadania i działania realizowane w projekcie poniżej. informacje potwierdzające aktywność działań Wnioskodawcy wobec inwestorów zawarto w sekcji Q niniejszego wniosku o dofinansowanie. (Polish)
    0 references
    The project concerned the creation of a zone of economic activity in Gorzków in the Bochnia commune.As part of the project, tasks were planned:Task 1 Preparatory Works of the PFU, project cost documentation, fin. analysis and econ. together with the preparation of the project description, including diagnosis and analysis of demand for inw. 0.40 km,b Construction of 1 intersections,c Construction of 58 public exits together with culverts the final number of exits will be agreed with the Ordering Party at the stage of creating the target project documentation,d Construction of individual exits together with the culverts will be agreed on,e Construction of 24 culverts under the designed roads,f Construction of water drainages with a total length of 0.79 km, for cutting of roads, construction and demolition of existing elements. 650 m and 400 m,k Construction of sanit. sewage network 900 m,l The construction of a 400 m long lighting power grid,m Reconstruction of security is even more important. Land armament if these occur during the design and execution work Task 3. Investor supervisionTask 4. Project promotion. Task 5. Project management.Total SAG: 7.2624 ha.The project guarantees that SAG is equipped with the right quality, comprehensive infrastructure: road infrastructure internal roads, water.channel infrastructure, lighting power grid.Due to the limit of characters: the planned material scope of the project taking into account parameters, data, confirmation of accepted technological assumptions is presented in point. C.2.3 The tasks and activities carried out in the project below. information confirming the activity of the applicant vis-à-vis investors is provided in section Q of this grant application. (English)
    20 October 2020
    0 references
    Le projet en question concernant la création d’une zone d’activité économique à Gorzków dans la municipalité de Bochnia.Le projet était prévu pour zadania:Zadanie 1 Travaux préparatoires de la PFU, documentation du projet et des coûts, fin. et éco-analyse, ainsi que la préparation d’une description du projet, y compris le diagnostic et l’analyse des besoins pour les travaux de construction et d’assemblage des terrains de la tâche 2 et la construction de routes de longueur totale. 0,40 km,b Construction d’une intersection,c Construction de 58 sorties publiques avec ponceaux, le nombre final de sorties sera convenu avec le Commandant au stade de la création de la documentation de conception cible,d La construction de sorties individuelles avec ponceaux sera convenue, c’est-à-dire la construction de 24 ponceaux sous les routes prévues,f l’exécution des fossés défensifs d’une longueur totale de 0,79 km, g la coupe verte, h la démolition des éléments et structures routiers existants, et l’exécution de la signalisation verticale et horizontale et de l’équipement routier, la construction du réseau wodoc par longueur. 650 m et 400 m,k Construction d’un réseau d’assainissement sanitaire. 900 m,l Construction d’une grille d’éclairage d’une longueur de 400 m,m Reconstructionprotection du terrain existant, si tel est le cas au cours des travaux de conception et d’exécution. Surveillance des investisseursTâche 4. Promotion du projet.Tâche 5. Gestion de projet.Total SAG: 7,2624 ha. Le projet garantit l’équipement de SAG dans une infrastructure complète et de qualité appropriée: infrastructure routière routes intérieures, water.kan infrastructure, grille d’éclairage.En raison de la limite des caractères: la portée matérielle prévue du projet, en tenant compte des paramètres, des données et de la confirmation des hypothèses de la technologie, est présentée au point. C.2.3 Tâches et activités exécutées dans le cadre du projet ci-dessous. les informations confirmant l’activité de la requérante vis-à-vis des investisseurs sont fournies à la section Q de la présente demande de financement. (French)
    1 December 2021
    0 references

    Identifiers

    RPMP.03.01.02-12-0575/16
    0 references