Comprehensive energy modernisation of the building of the “Happy Harbor Tomorrow” facility in Wróblówka, the municipality of Czarny Dunajec (Q112242)

From EU Knowledge Graph
Revision as of 12:01, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est l’exécution d’une modernisation énergétique complète et profonde du bâtiment en usage (accord de location) de la Fondation Happy Tomorrow afin d’atteindre l’objectif principal du projet, qui est d’augmenter l’efficacité énergétique de l’installation au-delà de 60 % et de réduire les émissions de CO2 et de poussières (PM10, PM2,5). L’objectif direct du projet est de mettre en œuvre une solution technique et technologique glo...)
Jump to navigation Jump to search
Project Q112242 in Poland
Language Label Description Also known as
English
Comprehensive energy modernisation of the building of the “Happy Harbor Tomorrow” facility in Wróblówka, the municipality of Czarny Dunajec
Project Q112242 in Poland

    Statements

    0 references
    314,329.99 zloty
    0 references
    75,439.20 Euro
    13 January 2020
    0 references
    689,017.99 zloty
    0 references
    165,364.32 Euro
    13 January 2020
    0 references
    45.62 percent
    0 references
    5 August 2016
    0 references
    20 December 2018
    0 references
    FUNDACJA SZCZĘŚLIWE JUTRO
    0 references
    0 references
    Przedmiotem projektu jest wykonanie kompleksowej, głębokiej modernizacji energetycznej budynku będącego w użytkowaniu (umowa najmu) Fundacji Szczęśliwe Jutro w celu realizacji głównego celu projektu jakim jest zwiększenie efektywności energetycznej obiektu powyżej 60% oraz ograniczenie emisji CO2 i emisji pyłów (PM10, PM2,5). Celem bezpośrednim projektu jest wdrożenie kompleksowego rozwiązania technicznego i technologicznego ukierunkowanego na nowoczesne instalacje, co z jednej strony będzie miało wpływ na obniżenie kosztów funkcjonowania placówki, a z drugiej strony wpłynie bezpośrednio na ochronę środowiska w regionie. Zakres prac został wypracowany w oparciu o gruntowną inwentaryzację budynku oraz audyt energetyczny, na co Projektodawca posiada już stosowną dokumentację. Stan istniejący budynku jest zadowalający, jednak jak wynika z przeprowadzonego audytu energetycznego, obiekt wymaga wykonania następującego zakresu prac, który w pełni wpisuje się w zapisy podrozdziału 2.2 pkt 4 Regulaminu. Zakres I fazy projektu obejmuje: -wykonanie termomodernizacji budynku wraz z wymianą stolarki okiennej i drzwiowej, -gruntowną wymianę systemu grzewczego z zastosowaniem nowoczesnych technologii, -likwidację starego źródła ciepła, jakim przez 10 lat od instalacji był piec na olej opałowy, -zastosowanie urządzeń grzewczych spalających biomasę, -wymianę/modernizację wewnętrznych instalacji centralnego ogrzewania, -wymianę i przebudowę wentylacji. II faza inwestycji to prace adaptacyjne budynku (roboty budowlane), - instalacja hydrantowa ; - instalacja kanalizacyjna; - instalacja słaboprądowa Wszystkie działania projektowe będą realizowane na obiekcie najmowanym przez Fundację Szczęśliwe Jutro w miejscowości Wróblówka zgodnie z obowiązującym Planem Zagospodarowania, prawem budowlanym oraz wymogami przepisów w zakresie uruchomienia placówki opiekuńczo-wychowawczej. (Dalszy opis w części Q.) (Polish)
    0 references
    The subject of the project is to implement a comprehensive, deep energy modernisation of the building in use (rental agreement) of the Happy Tomorrow Foundation in order to achieve the main goal of the project, which is to increase the energy efficiency of the facility above 60 % and to reduce CO2 emissions and dust emissions (PM10, PM2,5). The direct objective of the project is to implement a comprehensive technical and technological solution aimed at modern installations, which, on the one hand, will have an impact on lower operating costs of the facility and, on the other hand, will have a direct impact on environmental protection in the region. The scope of the work was developed on the basis of a thorough inventory of the building and an energy audit, for which the Projector already has appropriate documentation. The existing state of the building is satisfactory, but according to the energy audit carried out, the building requires the following scope of work to be carried out, which fully fits into the provisions of subsection 2.2 paragraph 4 of the Rules of Procedure. Phase I of the project includes: —producing thermomodernisation of the building together with the replacement of window and door carpentry, -a major replacement of the heating system with the use of modern technologies, – liquidation of the old heat source, which for 10 years since the installation was a heating furnace for heating oil, -application of heating devices burning biomass, -exchange/modernisation of internal central heating systems, -replacement and reconstruction of ventilation. Phase II of the investment is the adaptation work of the building (construction works), – hydrant installation; — sewage installation; — Low current installation All project activities will be carried out on the facility leased by the Lucky Foundation Tomorrow in the town of Wróblówka in accordance with the current Management Plan, construction law and the requirements of regulations regarding the establishment of a care and education facility. (For further description in section Q.) (English)
    20 October 2020
    0 references
    L’objet du projet est l’exécution d’une modernisation énergétique complète et profonde du bâtiment en usage (accord de location) de la Fondation Happy Tomorrow afin d’atteindre l’objectif principal du projet, qui est d’augmenter l’efficacité énergétique de l’installation au-delà de 60 % et de réduire les émissions de CO2 et de poussières (PM10, PM2,5). L’objectif direct du projet est de mettre en œuvre une solution technique et technologique globale visant des installations modernes qui, d’une part, réduira les coûts d’exploitation de l’installation et, d’autre part, aura un impact direct sur la protection de l’environnement dans la région. La portée des travaux a été élaborée sur la base d’un inventaire complet de l’audit du bâtiment et de l’énergie, pour lequel le projecteur dispose déjà de la documentation pertinente. L’état actuel du bâtiment est satisfaisant, toutefois, selon l’audit énergétique effectué, l’installation exige que les travaux suivants soient effectués, ce qui est pleinement conforme aux dispositions du sous-chapitre 2.2(4) du règlement intérieur. La portée de la première phase du projet comprend: —la mise en œuvre de la thermomodernisation du bâtiment ainsi que le remplacement de la menuiserie des fenêtres et des portes, -un remplacement majeur du système de chauffage utilisant des technologies modernes, — l’élimination de l’ancienne source de chaleur, qui, depuis l’installation, était le four pour le chauffage du mazout, — l’utilisation de dispositifs de chauffage brûlant la biomasse, — le remplacement/modernisation des installations de chauffage central interne, — le remplacement et la reconstruction de la ventilation. La deuxième phase de l’investissement est le travail d’adaptation du bâtiment (travaux de construction), — l’installation des bouches d’eau; — système d’assainissement; — installation à faible intensité Toutes les activités du projet seront menées sur l’installation louée par la Fondation de l’Happy Tomorrow à Wróblówka, conformément au plan de développement applicable, au droit du bâtiment et aux exigences de la réglementation relative à la création d’un établissement de soins et d’éducation. (Description plus détaillée à la section Q.) (French)
    1 December 2021
    0 references

    Identifiers

    RPMP.04.03.02-12-0224/16
    0 references