Thermal modernisation of the Tarnów County teaching facilities in Tuchów and Zakliczyn (Q112229)

From EU Knowledge Graph
Revision as of 11:14, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q112229 in Poland
Language Label Description Also known as
English
Thermal modernisation of the Tarnów County teaching facilities in Tuchów and Zakliczyn
Project Q112229 in Poland

    Statements

    0 references
    2,790,244.1 zloty
    0 references
    669,658.58 Euro
    13 January 2020
    0 references
    4,678,477.7 zloty
    0 references
    1,122,834.65 Euro
    13 January 2020
    0 references
    59.64 percent
    0 references
    1 July 2015
    0 references
    31 December 2018
    0 references
    POWIAT TARNOWSKI
    0 references
    Projekt składa się z trzech zadań, z których każde dotyczy jednego z trzech obiektów: Zadanie 1. Liceum Ogólnokształcące w Tuchowie (skr. LO Tuchów). Inwestycja obejmie jeden budynek: budynek szkoły (bud. nr 1). Zadanie 2. Centrum Kształcenia Zawodowego i Ustawicznego w Tuchowie (skr. CKZiU Tuchów). Inwestycja obejmie cztery budynki – szkoła (bud. nr 2), warsztaty szkolne (bud. nr 3), warsztaty szkolne - pracownie samochodowe i dydaktyczne (bud. nr 4), warsztaty szkolne – spawalnia i kuźnia (bud. nr 5). Zadanie 3. Zespół Szkół Ponadgimnazjalnych w Zakliczynie (skr. ZSP Zakliczyn). Inwestycja obejmie dwa budynki: warsztaty (bud. nr 6) oraz warsztaty – pracownie numer 2 (bud. nr 7) Łączna liczba budynków objętych projektem w wyżej wymienionych obiektach wynosi 7. W harmonogramie rzeczowo - finansowym poszczególne działania zostały przypisane do obiektów w podziale na kategorie prac według listy poniżej z każdorazowym zaznaczeniem jakiego budynku dotyczą dane prace: - prace przygotowawcze: dokumentacja techniczna, audyty, - docieplenie, - stolarka, - instalacje c.o. i cwu, kotłownia, - oświetlenie, - wykonanie instalacji fotowoltaicznej, - nadzór inwestorski. Miernikiem osiągnięcia przyjętych celów będą: a) zmniejszenie rocznego zapotrzebowania na energię końcową o 74,45 %, b) zastosowanie obowiązkowych urządzeń służących do rozliczania ciepła: w projekcie zaprojektowano liczniki ciepła dla poszczególnych obiegów cieplnych (c.o. i cwu) w węźle cieplnym (w załączeniu – „zał. 16 c: Kotlownia, co termo Tuchow, Zakliczyn”) c) zastosowanie urządzeń utrzymujących zadaną temperaturę: w projekcie zastosowano regulatory pogodowe, zawory termostatyczne na grzejnikach i zawory regulacyjne podpionowe, do regulacji statycznej - funkcja dynamicznej regulacji ciśnienia dyspozycyjnego realizowana przez pompy sterowane elektronicznie. d) redukcja emisji gazów cieplarnianych (CO2) o 76,735 %, e) obniżenie emisji pyłów PM2,5 o 99,52 % i pyłów PM10 o 99,57%. (Polish)
    0 references
    The project consists of three tasks, each involving one of three objects: Task 1. General Education High School in Tuchów (Skr. Lo Tuchów). The investment will cover one building: the school building (built no. 1). Task 2. Centre for Vocational and Continuing Education in Tuchów (Skr. “CKZiU Tuchów”. The investment will include four buildings – school (building no. 2), school workshops (building no. 3), school workshops – car and didactic workshops (building no. 4), school workshops – welding room and forge (building no. 5). Task 3. Secondary Schools in Zakliczin (Skr. ZSP Zakliczyn). The investment will cover two buildings: workshops (building no. 6) and workshops – workshop number 2 (construction no. 7) The total number of buildings covered by the project in the above mentioned facilities is 7. In the physical and financial schedule, individual actions are assigned to the objects broken down by category of work according to the list below, with each building marking the work concerned: — preparatory work: technical documentation, audits, – warming, – carpentry, – central heating installations, boiler room, – lighting, – production of photovoltaic installation, – investor supervision. A measure of achievement of the objectives will be: a) reduction of the annual final energy demand by 74,45 %, (b) the use of mandatory heat accounting equipment: the project designs heat meters for individual heat cycles (c.o. and cwu) in a heat node (attached – "oil. 16 c: Boiler room, what Thermo Tukhov, Disorder") c) use of equipment that maintains the specified temperature: the project uses weather regulators, thermostatic valves on radiators and control valves, for static regulation – dynamic availability pressure control function performed by electronically controlled pumps. d) reduction of greenhouse gas emissions (CO2) by 76.735 %, e) reduction of PM2.5 dust emissions by 99.52 % and PM10 dusts by 99.57 %. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.02-12-0202/16
    0 references