THERMAL MODERNISATION AND RECONSTRUCTION OF THE BUILDING OF THE WIŚNIEW MUNICIPALITY OFFICE (Q109005)
Jump to navigation
Jump to search
Project Q109005 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | THERMAL MODERNISATION AND RECONSTRUCTION OF THE BUILDING OF THE WIŚNIEW MUNICIPALITY OFFICE |
Project Q109005 in Poland |
Statements
1,386,449.37 zloty
0 references
1,733,061.72 zloty
0 references
80.0 percent
0 references
1 November 2016
0 references
30 September 2020
0 references
GMINA WIŚNIEW
0 references
Celem projektu jest kompleksowa modernizacja budynku Urzędu Gminy WIŚNIEW., położonego na działkach nr 304/1 i 306 w miejscowości Wiśniew (gmina Wiśniew, powiat Siedlce). Plan termomodernizacji budynku obejmuje: - ocieplenie i izolację przeciwwilgociową budynku poprzez izolację, płytami styropianowymi i wełną mineralną, podłogi na parterze, ścian zewnętrznych budynku, stropu II piętra i naprawę izolacji fundamentów do poziomu ław fundamentowych, - przebudowę systemu grzewczego obejmującą wymianę pieca gazowego starego typu na nowoczesny, dwuzakresowy (CO/CWU) piec kondensacyjny z zamkniętą komorą spalania oraz zmiana całej instalacji CO z żeliwnej o dużych przekrojach rur i grzejników na przewody o niskich przekrojach, z kołnierzami izolacyjnymi w przestrzeni otwartej i nowoczesnych grzejnikach z własną możliwością ustawienia temperatury grzania, - przebudowę systemów wentylacji na systemy z rekuperacją, - zastosowanie automatyki pogodowej i zastosowanie systemów sterowania temperaturą ogrzewania w budynku, - wymianę okien i drzwi zewnętrznych budynku, - instalacją OZE tj. ogniw fotowoltaicznych na nowym dachu budynku dla pozyskania energii elektrycznej dla potrzeb Urzędu. - wymiana obecnego systemu oświetlenia na system energooszczędny poprzez zamontowanie w całym budynku opraw oświetleniowych dla świetlówek i żarówek LED; Projekt ten jest przewidziany jako część inwestycji polegającej na przebudowie, rozbudowie i nadbudowie budynku Gminy oraz zagospodarowaniu terenu. zgodnie z projektem budowlanym obejmuje on: - Dostosowanie Urzędu dla osób niepełnosprawnych - m.in. budowę windy obsługującej wszystkie kondygnacje budynku, - wykończenie, dotychczas nieużywanej, przestrzeni biurowej na II piętrze budynku, - założenie nowoczesnej sieci teletechnicznej, - wykończenie przestrzeni biurowej na I piętrze i parterze - zgodnie z aktualnymi wymogami co do standardu stanowisk pracy. (Polish)
0 references
The aim of the project is a comprehensive modernisation of the building of the Wiśniew Municipality, located on plots no. 304/1 and 306 in Wiśniew (the Wiśniew commune, Siedlce district). The thermal modernisation plan of the building includes: — energy insulation and insulation of the building through insulation, styrofoam and mineral wool, floors on the ground floor, external walls of the building, floor II floor and repair of foundation insulation to the level of foundation benches, – conversion of the heating system including the replacement of the building’s gas kiln of the old type of the building’s internal heating system for modern, bi-concentration (CO/CWU) chamber-condensing oven with closed combustion chamber and change of the whole of the internal heating system from the interior of the heating system from the modern, double-banding (CO/CWU) systems of the condensation furnace with closed combustion chamber and change of the entire installation of CO from that — replacing the current lighting system with an energy-efficient system by mounting luminaires for fluorescent lamps and LED bulbs throughout the building; This project is planned as part of an investment consisting of the reconstruction, expansion and superstructure of the Municipality and land development. According to the construction project, it includes: — Adaptation of the Office for people with disabilities – construction of an elevator serving all floors of the building, – finishing of the office space not yet used on the second floor of the building, – establishing a modern teletechnical network, – finishing of office space on the first floor and ground floor – according to current requirements regarding the standard of workstations. (English)
17 October 2020
0 references
L’objectif du projet est la modernisation complète du bâtiment du bureau municipal de Wiśniew, situé sur les terrains 304/1 et 306 à Wiśniew (municipalité de Wiśniew, district de Siedlce). Le plan de thermomodernisation du bâtiment comprend: — isolation et isolation anti-humidité du bâtiment par isolation, panneaux de polystyrène et laine minérale, planchers au rez-de-chaussée, les murs extérieurs du bâtiment, le plafond du deuxième étage et la réparation de l’isolation des fondations au niveau des bancs de fondation, — la reconstruction du système de chauffage impliquant le remplacement de l’ancien four à gaz de type par un four à condensation moderne à deux bandes (CO/CWU) avec des chambres de combustion fermées, et le changement de l’ensemble de l’installation CO de la fonte avec de grandes sections de tuyaux et de radiateurs à basse section, avec brides isolantes dans l’espace ouvert et les radiateurs modernes avec sa propre possibilité de régler la température de chauffage, — la conversion des systèmes de ventilation en systèmes avec récupération, — l’application de l’automatisation des intempéries et l’utilisation de systèmes de contrôle de la température de chauffage dans le bâtiment, — le remplacement des fenêtres et des portes extérieures du bâtiment, — l’installation de cellules SER, c’est-à-dire les cellules photovoltaïques sur le nouveau toit du bâtiment pour l’acquisition d’électricité pour les besoins de l’Office. — remplacer le système d’éclairage actuel par un système économe en énergie par l’installation de luminaires pour lampes fluorescentes et ampoules LED dans tout le bâtiment; Ce projet est envisagé dans le cadre d’un investissement consistant en la reconstruction, l’extension et la surconstruction de la construction municipale et de l’aménagement du terrain. — Adaptation de l’Office pour les personnes handicapées — y compris la construction d’un ascenseur desservant tous les étages de l’immeuble, — la finition, non encore utilisée, d’espaces de bureaux au deuxième étage du bâtiment, — la mise en place d’un réseau télétechnique moderne, — la finition des bureaux au premier étage et au rez-de-chaussée — conformément aux exigences actuelles pour la norme des postes de travail. (French)
1 December 2021
0 references
Identifiers
RPMA.04.02.00-14-5326/16
0 references