Thermal modernisation of public buildings in the city of Warsaw (Q108965)

From EU Knowledge Graph
Revision as of 10:38, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q108965 in Poland
Language Label Description Also known as
English
Thermal modernisation of public buildings in the city of Warsaw
Project Q108965 in Poland

    Statements

    0 references
    4,182,138.64 zloty
    0 references
    1,003,713.27 Euro
    13 January 2020
    0 references
    5,227,673.31 zloty
    0 references
    1,254,641.59 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    26 February 2014
    0 references
    30 June 2020
    0 references
    MIASTO STOŁECZNE WARSZAWA
    0 references
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Celem gł. proj. jest zwiększenie efektywności energetycznej budynków użyteczności publicznej na terenie m.st. Warszawy poprzez wsparcie termomodernizacji wybranych obiektów miejskich (łącznie: 5). W przypadku dwóch budynków prace inwestycyjne już się rozpoczęły. W ramach proj. pracom termomodernizacyjnym zostaną poddane następujące placówki: Żłobek nr 44 przy ul. Wejherowskiej 1 (budynek nr 1), Zespół Szkół im. Piotra Wysockiego przy ul. Odrowąża 75 (budynek nr 2 – prace inwest. już się rozpoczęły), Zespół Szkół nr 84 przy ul. Zwycięzców 44 (budynek nr 3), Szkoła Podstawowa nr 271 przy ul. Niegocińskiej 2 (budynek nr 4), Warszawskie Centrum Pomocy Rodzinie przy ul. Lipińskiej 2 (budynek nr 5 - prace inwest. już się rozpoczęły). Wszystkie ww. budynki mają audyty energ., a po zakończeniu realizacji inwestycji zostaną przeprowadzone audyty energ. ex-post. Zgodnie z przeprowadzonymi audytami energ. w każdym termomodernizowanym budynku zostanie podniesiona efektywność energetyczna o co najmniej 25%. Projekt ma charakter kompleksowy i zakłada m.in.: wymianę okien (budynki nr: 3, 4, 5) lub drzwi zewn. (budynki nr: 1, 2, 3, 4), wymianę oświetlenia na energooszczędne (budynek nr 4), przebudowę syst. grzewczych (budynki nr: 1, 2, 4, 5), zastosowanie automatyki pogodowej (budynki nr: 1, 2, 4, 5), instalację ogniw fotowoltaicznych (OZE) pozwalających na wytworzenie energii elektrycznej (budynek nr 5), instalację zaworów podpionowych i termostatów (budynki nr: 1, 2, 4, 5) oraz ocieplenie przegród zewnętrznych obiektu, w tym ścian zewn. (budynki nr: 1, 2, 3, 4, 5), dachów lub stropodachów (budynki nr: 1, 2, 3, 5). W wyniku realizacji proj. zostanie zwiększona efektywność energ. ww. placówek łącznie o ok. 61,24% w odniesieniu do stanu początkowego. Ponadto zostanie zredukowana emisja CO2 o ok. 61,28%. Docelowy wskaźnik EP h+w jest szacowany na poziomie ok. 74,22 kWh/(m2 x rok), z kolei efektywność kosztowa na poziomie 2,68 zł/kWh/rok. Projekt jest zgodny z PGN i Strategią OMW (Polish)
    0 references
    The aim of the project is to increase the energy efficiency of public buildings in the city of Warsaw by supporting the thermal modernisation of selected urban facilities (total: 5. In the case of two buildings, investment work has already begun. As part of the project, the following facilities will be subjected to thermal modernisation: Nursery 44 at ul. Wejherowska 1 (building no. 1), Piotr Wysocki School Complex at ul. Odrowąża 75 (building no. 2 – investment works already started), School Complex No. 84 at ul. Winners 44 (building no. 3), Primary School No. 271 at ul. Niegocińska 2 (building no. 4), Warsaw Family Help Centre at ul. Lipinska 2 (building no. 5 – investment work has already begun). All these buildings have energetic audits, and after completion of the investment, ex-post energ. audits will be carried out. According to the energy audits carried out, energy efficiency will be increased by at least 25 % in each thermally modernised building. The project is complex in nature and assumes, among others: window replacement (buildings no.: 3, 4, 5) or an external door. (buildings no.: 1, 2, 3, 4), replacement of lighting for energy efficient (buildings no. 4), reconstruction of heating systems (buildings no.: 1, 2, 4, 5), use of weather automation (buildings no.: 1, 2, 4, 5), installation of photovoltaic cells (RES) capable of generating electricity (building No 5), installation of sub-valves and thermostats (buildings no.: 1, 2, 4, 5) and warming of the outer partitions of the object, including outer walls. (buildings no.: 1, 2, 3, 4, 5), roofs or stropodaches (buildings No: 1, 2, 3, 5. As a result of the project, the efficiency of the above-mentioned facilities will be increased by approx. 61,24 % for baseline. In addition, CO2 emissions will be reduced by approx. IT’S 61.28 %. The target EP h+w is estimated at approx. 74.22 kWh/(m² x year), in turn cost efficiency of 2,68 PLN/kWh/year. The project is compatible with PGN and OMW Strategy (English)
    17 October 2020
    0 references

    Identifiers

    RPMA.04.02.00-14-5074/16
    0 references