Comprehensive thermal modernisation of the buildings of the Public High School and Preschool Complex in Chynów (Q108962)

From EU Knowledge Graph
Revision as of 10:38, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet consistera en la modernisation de deux bâtiments publics à Chynów: — École et équipe préscolaire (ZSP) — Gymnasium public La portée de l’investissement couvrira le réchauffement des murs, des planchers et des toits des bâtiments. Une partie de la menuiserie porte-fenêtres sera remplacée. Les installations électriques et les luminaires pour LED seront remplacés dans les deux bâtiments. Le système de chauffage central sera modernisé. Les...)
Jump to navigation Jump to search
Project Q108962 in Poland
Language Label Description Also known as
English
Comprehensive thermal modernisation of the buildings of the Public High School and Preschool Complex in Chynów
Project Q108962 in Poland

    Statements

    0 references
    2,103,471.79 zloty
    0 references
    504,833.23 Euro
    13 January 2020
    0 references
    2,629,339.74 zloty
    0 references
    631,041.54 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 January 2016
    0 references
    15 December 2019
    0 references
    GMINA CHYNÓW
    0 references
    0 references

    51°54'21.6"N, 21°4'59.9"E
    0 references
    Projekt będzie polegał na modernizacji dwóch budynków użyteczności publicznej w Chynowie: - Zespół szkolno-przedszkolny (ZSP) - Gimnazjum publiczne Zakres inwestycji obejmie docieplenie ścian, posadzek i dachów budynków. Wymieniona zostanie część stolarki okienno-drzwiowej. W obu budynkach zostaną wymienione instalacje elektryczne i oprawy oświetleniowe na LED. Zmodernizowana zostanie instalacja centralnego ogrzewania. Oba budynki zostaną także wyposażone w system automatycznej regulacji temperatury w budynku. Koszty kwalifikowane projektu obejmują koszty inwestycyjne wyszczególnione w audytach energetycznych sporządzonych dla budynków wymienionych powyżej oraz niezbędne koszty przygotowawcze (studium, projekty, audyty). Projekt będzie realizowany w okresie od marca do końca grudnia 2017 roku, z tym że koszty przygotowawcze do projektu zostały już poniesione w czwartym kwartale 2015 roku, a część zostanie poniesiona w pierwszym kwartale 2016 roku. (Polish)
    0 references
    The project will consist of modernisation of two public buildings in Chynów: — School and preschool (ZSP) – Public Secondary School The scope of the investment will include warming of walls, floors and roofs of buildings. Part of the window-door carpentry will be replaced. In both buildings, electrical installations and lighting fittings will be replaced with LEDs. The central heating system will be modernised. Both buildings will also be equipped with an automatic temperature control system in the building. The eligible costs of the project include the investment costs specified in the energy audits prepared for the buildings listed above and the necessary preparatory costs (study, projects, audits). The project will be implemented in the period from March to the end of December 2017, but the preparatory costs for the project have already been incurred in the fourth quarter of 2015 and some will be incurred in the first quarter of 2016. (English)
    17 October 2020
    0 references
    Le projet consistera en la modernisation de deux bâtiments publics à Chynów: — École et équipe préscolaire (ZSP) — Gymnasium public La portée de l’investissement couvrira le réchauffement des murs, des planchers et des toits des bâtiments. Une partie de la menuiserie porte-fenêtres sera remplacée. Les installations électriques et les luminaires pour LED seront remplacés dans les deux bâtiments. Le système de chauffage central sera modernisé. Les deux bâtiments seront également équipés d’un système de contrôle automatique de la température dans le bâtiment. Les coûts éligibles du projet comprennent les coûts d’investissement spécifiés dans les audits énergétiques des bâtiments mentionnés ci-dessus et les coûts préparatoires nécessaires (étude, projets, audits). Le projet sera mis en œuvre entre mars et fin décembre 2017, sauf que les coûts de préparation du projet ont déjà été supportés au cours du quatrième trimestre 2015, et une partie sera réalisée au cours du premier trimestre 2016. (French)
    1 December 2021
    0 references

    Identifiers

    RPMA.04.02.00-14-4606/16
    0 references