Development of advanced technology for automatic service of participants of mass events (Q107899)
Jump to navigation
Jump to search
Project Q107899 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of advanced technology for automatic service of participants of mass events |
Project Q107899 in Poland |
Statements
2,898,509.43 zloty
0 references
4,263,500.0 zloty
0 references
67.98 percent
0 references
1 October 2016
0 references
30 September 2018
0 references
IT BUSINESS CONSULTING GROUP SP. Z O.O.
0 references
Celem projektu jest opracowanie, a następnie wdrożenie do oferty Wnioskodawcy, zintegrowanej technologii obsługi imprez masowych. Opracowana technologia będzie pierwszym na rynku tego typu rozwiązaniem, które integrować będzie wszystkie obszary obsługi imprez masowych. Zaprojektowany system zmieni sposób zarządzania przede wszystkim wydarzeniami sportowymi, zredukuje koszty funkcjonowania klubów i obiektu (zwłaszcza koszty osobowe) oraz zwiększy przychody klubowe dzięki wdrożeniu nowych, innowacyjnych usług. Zintegrowany system znajdzie także zastosowanie w obsłudze wydarzeń, organizowanych poza stadionem, co umożliwi klubom świadczenie usług dla biznesu. Ponadto dzięki założonym funkcjonalnościom (monitorowanie przez drony trybun i wychwytywanie niebezpiecznych zachowań) system znacznie zwiększy bezpieczeństwo uczestników imprez masowych. Docelową grupą odbiorców końcowych rezultatu projektu będą w pierwszej kolejności zarządcy obiektów sportowych i zarządy klubów piłkarskich, żużlowych, hokejowych i innych klubów posiadających własne stadiony. Projekt realizowany będzie w ramach 3 następujących po sobie zadań. Zadanie 1sze obejmować będzie prace badawcze w zakresie właściwości fizycznych, budowy urządzeń oraz szczegółowej analizy funkcjonalnej urządzeń, przeprowadzenie badań w zakresie technologii procesowych zastosowanych w urządzeniach oraz prace badawcze mające na celu szczegółową analizę aspektów bezpieczeństwa urządzeń, transakcji oraz ograniczenie awaryjności urządzeń. W ramach 2go zadania przeprowadzone zostaną badania nad systemem informatycznym w zakresie działania w środowisku rozproszonym i integrującym niezbędne urządzenia i technologie komunikacyjne. Ostatnie zadanie poświęcone zostanie realizacji prac rozwoj. w celu budowy prototypów urządzeń oraz systemu IT. W efekcie realizacji zadania, oprócz otrzymania przetestowanego i zwalidowanego prototypu, opracowana zost. dokumentacja techniczna, niezbędna do przeprowadzenia prac wdrożeniowych. (Polish)
0 references
The aim of the project is to develop and then implement the Applicant’s offer of integrated technology for mass events. The developed technology will be the first in the market of this type of solution, which will integrate all areas of mass events. The system will change the way of managing sports events, reduce the costs of clubs and facilities (especially personnel costs) and increase club revenues through the implementation of new, innovative services. The integrated system will also be used to handle events organised outside the stadium, which will enable clubs to provide business services. In addition, thanks to the assumed functionality (monitoring by tribune drones and capturing dangerous behaviours), the system will significantly increase the safety of the participants of mass events. The target group of final recipients of the project results will be first of all managers of sports facilities and boards of football, slag, hockey and other clubs with their own stadiums. The project will be implemented within 3 successive tasks. Task 1 will include research on physical properties, equipment construction and detailed functional analysis of equipment, carrying out tests on process technologies used in equipment, and research to analyse in-depth aspects of equipment safety, transactions and limiting failure of equipment. As part of the 2nd task, research into the IT system will be carried out in the field of operation in a distributed environment and integrating the necessary communication equipment and technologies. The last task will be devoted to the implementation of development works in order to build prototypes of equipment and IT system. As a result of the task, apart from obtaining the tested and validated prototype, the technical documentation necessary to carry out the implementation work has been developed. (English)
17 October 2020
0 references
L’objectif du projet est de développer et de mettre en œuvre dans l’offre de la requérante une technologie intégrée de gestion d’événements de masse. La technologie développée sera la première sur le marché de ce type de solution, qui intégrera tous les domaines d’événements de masse. Le système conçu modifiera la manière dont les manifestations sportives sont gérées, réduira les coûts des clubs et des installations (en particulier les coûts de personnel) et augmentera les recettes des clubs grâce à la mise en place de nouveaux services innovants. Le système intégré sera également utilisé pour gérer les événements organisés en dehors du stade, ce qui permettra aux clubs de fournir des services aux entreprises. En outre, grâce aux fonctionnalités (surveillance par les drones des stands et capture des comportements dangereux), le système augmentera considérablement la sécurité des participants aux manifestations de masse. Le groupe cible des bénéficiaires finals du projet sera d’abord les gestionnaires d’installations sportives et de conseils de football, de speedway, de hockey et d’autres clubs dotés de leurs propres stades. Le projet sera mis en œuvre dans le cadre de trois tâches consécutives. L’activité 1 comprendra la recherche sur les propriétés physiques, la construction d’équipements et l’analyse fonctionnelle détaillée de l’équipement, la réalisation d’essais sur les technologies de procédé utilisées dans les équipements et des activités de recherche visant à analyser en détail les aspects de sécurité de l’équipement, les transactions et la réduction des défaillances de l’équipement. Dans le cadre de la deuxième tâche, des recherches seront menées sur le système informatique dans le domaine d’exploitation dans un environnement distribué intégrant les dispositifs et technologies de communication nécessaires. La dernière tâche sera consacrée à la mise en œuvre des travaux de développement afin de construire des prototypes d’appareils et de systèmes informatiques. À la suite de cette tâche, outre l’obtention d’un prototype testé et validé, la documentation technique nécessaire à la réalisation des travaux de mise en œuvre a été élaborée. (French)
1 December 2021
0 references
Identifiers
RPMA.01.02.00-14-5677/16
0 references