Scalable system with intelligent sensors for e-management of power stations (Q107925)

From EU Knowledge Graph
Revision as of 10:29, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q107925 in Poland
Language Label Description Also known as
English
Scalable system with intelligent sensors for e-management of power stations
Project Q107925 in Poland

    Statements

    0 references
    1,002,730.48 zloty
    0 references
    240,655.32 Euro
    13 January 2020
    0 references
    2,032,000.0 zloty
    0 references
    487,680.0 Euro
    13 January 2020
    0 references
    49.35 percent
    0 references
    1 February 2017
    0 references
    31 August 2018
    0 references
    INSTYTUT TELE- I RADIOTECHNICZNY
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Nadrzędnym celem projektu jest opracowanie i wdrożenie skalowalnego systemu z inteligentnymi sensorami do e-zarządzania stacjami elektroenergetycznymi, będącego innowacyjnym systemowym rozwiązaniem do e-zarządzania stacjami elektroenergetycznymi. Zakłada się, że w skład systemu wchodzić będą opracowane w projekcie sensory przeznaczone dla sieci Smart Grid (diagnostyka przedusterkowa, detekcja i przeciwdziałanie zagrożeniom oraz stanom awaryjnym), moduły e-paszportu (cyfryzacja dokumentacji), oraz jednostka do e-zarządzania (zarządzanie zasobami energetycznych obiektów infrastrukturalnych w tym zależnościami pomiędzy nimi, automatyzacja i zdalne zarządzanie obiektów elektroenergetycznych). Zakres projektu obejmuje 3 zadania badań przemysłowych w ramach których nastąpi ewolucja gotowości technologicznej od II do VI poziomu TRL, podczas tych prac badawczych opracowany, wytworzony i przebadany zostanie reprezentatywny model systemu. Zakres projektu obejmuje również 1 zadanie prac rozwojowych w ramach którego nastąpi ewolucja gotowości technologicznej od VII do IX poziomu TRL, podczas prowadzonych eksperymentalnych prac rozwojowych zostanie wytworzony i przebadany niekomercyjny prototyp systemu. W proces opracowania systemu włączeni zostaną użytkownicy, którzy będą mieli decydujący wpływ na kształt finalnego rozwiązania. Odbiorcami systemu będą firmy konstruujące i produkujące stacje elektroenergetyczne w tym stacje węzłowe Smart Grid występujące w największej liczbie. Użytkownikami systemu będą operatorzy, dystrybutorzy oraz przemysłowi odbiorcy energii elektrycznej. Ze względu na różnorodność stacji elektroenergetycznych ogromnie ważna jest skalowalność. Projekt realizowany będzie w formie współpracy z innymi jednostkami naukowymi w tym z Politechniką Wrocławską (kat. A). Współpraca z jednostkami naukowymi (z. 1 i 3) jest konieczna ze względu na osiągnięcie wymaganego poziomu innowacyjności przy jednoczesnym zminimalizowaniu ryzyka niepowodzenia prac badawcz (Polish)
    0 references
    The overarching objective of the project is to develop and implement a scalable system with intelligent sensors for e-management of power stations, an innovative system solution for e-management of power stations. It is assumed that the system will include sensors designed for the Smart Grid network (pre-uperuscular diagnostics, detection and prevention of threats and emergency conditions), e-passport modules (digitisation of documentation), and e-management unit (management of energy resources of infrastructure facilities including interdependencies, automation and remote management of electricity facilities). The scope of the project covers 3 tasks of industrial research in which the technological preparedness will evolve from TRL level II to VI, and a representative model of the system will be developed, produced and tested during this research work. The scope of the project also covers 1 task of development work under which the evolution of technological readiness from VII to IX level TRL will take place, during the experimental development work carried out, a non-commercial prototype of the system will be developed and tested. Users will be involved in the process of developing the system, who will have a decisive influence on the shape of the final solution. The recipients of the system will be companies constructing and producing power stations including Smart Grid junction stations that exist in the largest number. Users of the system will be operators, distributors and industrial electricity consumers. Due to the diversity of power stations, scalability is extremely important. The project will be implemented in the form of cooperation with other scientific units including the Wrocław University of Technology (cat. (A) Cooperation with scientific bodies (of 1 and 3) is necessary in order to achieve the required level of innovation while minimising the risk of research failure (English)
    17 October 2020
    0 references

    Identifiers

    RPMA.01.02.00-14-5759/16
    0 references