Revaluation of residential buildings in the district of Blocks in Ciechanów – stage I (Q109412)

From EU Knowledge Graph
Revision as of 10:12, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est de prévenir la marginalisation de la sous-zone de revitalisation de Blocka par des actions globales dans le domaine du logement (parties communes) 7 bâtiments résidentiels multifamiliaux et dans le domaine social jusqu’au 31 décembre 2019. Dans le quartier «Bloki», il y a environ 100 bâtiments à un étage avec différentes surfaces de construction dans les ressources municipales et les communautés de logement. Ce sont des...)
Jump to navigation Jump to search
Project Q109412 in Poland
Language Label Description Also known as
English
Revaluation of residential buildings in the district of Blocks in Ciechanów – stage I
Project Q109412 in Poland

    Statements

    0 references
    3,843,071.4 zloty
    0 references
    922,337.14 Euro
    13 January 2020
    0 references
    5,490,102.0 zloty
    0 references
    1,317,624.48 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    3 April 2017
    0 references
    31 December 2020
    0 references
    GMINA MIEJSKA CIECHANÓW
    0 references
    0 references

    52°52'16.3"N, 20°36'22.3"E
    0 references
    Celem projektu jest przeciwdziałanie marginalizacji podobszaru rewitalizacji Bloki poprzez kompleksowe działania w sferze tkanki mieszkaniowej (części wspólnych) 7 wielorodzinnych budynków mieszkalnych oraz w sferze społecznej do dnia 31.12.2019 r. W dzielnicy „Bloki” w zasobach komunalnych oraz wspólnot mieszkaniowych znajduje się około 100 jednopiętrowych budynków o różnej powierzchni zabudowy. Są to budynki unikatowe w skali kraju i Europy Środkowej, chronione w MPZP. Zostały wybudowane w latach 1940-1942 przez administrację niemiecką i miały dostosować Ciechanów do pełnienia funkcji stolicy regencyjnej. „Bloki” do dziś stanowią istotną część zasobów mieszkaniowych Ciechanowa, niestety są też jedną z najbardziej zdegradowanych materialnie i społecznie dzielnic miasta. Wszystkie budynki ujęte w projekcie, zlokalizowane przy ul. 17 Stycznia 23, 25 oraz ul. H. Sienkiewicza 17/19, 35, 38/40, 53/55, 57/59 charakteryzują się dużym stopniem zużycia technicznego (od 62% do 68%). Zaplanowane działania termomodernizacyjne wynikają z przeprowadzonych audytów energetycznych i obejmują w zakresie części wspólnych m.in. ściany, stropy, stolarkę okienną i drzwiową, modernizację oświetlenia. Pozostałe roboty budowlane obejmują w zakresie części wspólnych: dachy, klatki schodowe, podjazdy dla osób z niepełnosprawnościami, wejścia do budynków. Zaplanowane działania określają szczegółowo Programy Funkcjonalno–Użytkowe, gdzie wykorzystano wyniki konkursu architektonicznego. Realizacja projektu partnerskiego jest kompleksowym podejściem do procesu rewitalizacji obszarów zdegradowanych, zakłada odnowę tkanki mieszkaniowej w zakresie części wspólnych oraz komplementarne działania współfinansowane ze środków EFS lub wpisujących się w cele EFS. Projekt znajduje się na liście projektów głównych LPR - nr 15-GP-B - str. 106 w LPR. Projekt realizuje założenia Planu Gospodarki Niskoemisyjnej poprzez działania termomodernizacyjne, wynikające z przeprowadzonych audytów energetycznych. (Polish)
    0 references
    The aim of the project is to counteract the marginalisation of the sub-area of revitalisation Blocks through comprehensive activities in the area of housing tissue (parts common) of 7 multi-family residential buildings and in the social sphere until 31.12.2019. In the district “Bloki” in municipal resources and housing communities there are about 100 single-storey buildings with different building spaces. These buildings are unique in the country and Central Europe, protected by the MPZP. It was built between 1940 and 1942 by the German administration and was to adapt Ciechanów to serve as a regency capital. “Bloki” to this day constitute an important part of Ciechanów’s housing resources, unfortunately it is also one of the most degraded and socially degraded districts of the city. All buildings included in the project, located at ul. 17 January 23, 25 and ul. H. Sienkiewicz 17/19, 35, 38/40, 53/55, 57/59 have a high level of technical consumption (from 62 % to 68 %). The planned thermo-modernisation activities result from energy audits and include common parts, such as walls, ceilings, window and door carpentry, and modernisation of lighting. Other works include common parts: roofs, stairwells, driveways for people with disabilities, entrances to buildings. The planned activities define in detail the Functional-Use Programs, where the results of the architectural competition were used. The implementation of the partnership project is a comprehensive approach to the process of revitalising degraded areas, implies the renewal of housing in common parts and complementary actions co-financed by the ESF or in line with the objectives of the ESF. The project is included in the list of main projects LPR – No 15-GP-B – p. 106 in LPR. The project implements the assumptions of the Low Emission Economy Plan through thermomodernisation activities resulting from energy audits. (English)
    20 October 2020
    0 references
    L’objectif du projet est de prévenir la marginalisation de la sous-zone de revitalisation de Blocka par des actions globales dans le domaine du logement (parties communes) 7 bâtiments résidentiels multifamiliaux et dans le domaine social jusqu’au 31 décembre 2019. Dans le quartier «Bloki», il y a environ 100 bâtiments à un étage avec différentes surfaces de construction dans les ressources municipales et les communautés de logement. Ce sont des bâtiments uniques dans le pays et en Europe centrale, protégés en MPZP. Ils ont été construits entre 1940 et 1942 par l’administration allemande et devaient adapter les Ciechans à la fonction de capital de régence. Les «blocs» constituent encore une part importante du parc immobilier de Ciechanów, malheureusement c’est l’un des quartiers les plus dégradés et socialement dégradés de la ville. Tous les bâtiments inclus dans le projet, situés à ul. 17 janvier 23, 25 et st. H. Sienkiewicza 17/19, 35, 38/40, 53/55, 57/59 se caractérisent par un degré élevé de consommation technique (de 62 % à 68 %). Les activités de thermomodernisation prévues sont le résultat d’audits énergétiques réalisés et couvrent les parties communes, telles que les murs, les plafonds, la menuiserie des fenêtres et des portes, la modernisation de l’éclairage. D’autres œuvres comprennent les parties communes: toits, escaliers, allées pour personnes handicapées, entrées des bâtiments. Les activités prévues exposent en détail les programmes fonctionnels et utilitaires, dans lesquels les résultats du concours d’architecture ont été utilisés. La mise en œuvre du projet de partenariat est une approche globale du processus de revitalisation des zones dégradées, implique la restauration du tissu immobilier dans le domaine des parties communes et des actions complémentaires cofinancées par le FSE ou conformes aux objectifs du FSE. Le projet est inclus dans la liste des principaux projets du LPR — no 15-GP-B — p. 106 en LPR. Le projet met en œuvre le plan d’économie à faible intensité de carbone par le biais d’activités de thermomodernisation résultant d’audits énergétiques réalisés. (French)
    1 December 2021
    0 references

    Identifiers

    RPMA.06.02.00-14-9681/17
    0 references