Reconstruction of the water supply station in the town of Cyców on plot No. 133 (Q105681)

From EU Knowledge Graph
Revision as of 09:59, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet est d’améliorer la qualité de l’eau fournie à des fins sociales et vivantes en modernisant les infrastructures d’approvisionnement en eau existantes dans la municipalité de Cyca. L’objectif spécifique du projet est d’améliorer la qualité de vie des résidents de la municipalité de cyce en réduisant les risques liés au contact avec de l’eau contaminée. Portée du projet selon les indicateurs à atteindre et le calendri...)
Jump to navigation Jump to search
Project Q105681 in Poland
Language Label Description Also known as
English
Reconstruction of the water supply station in the town of Cyców on plot No. 133
Project Q105681 in Poland

    Statements

    0 references
    750,453.41 zloty
    0 references
    180,108.82 Euro
    13 January 2020
    0 references
    882,886.37 zloty
    0 references
    211,892.73 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    4 September 2015
    0 references
    31 December 2016
    0 references
    GMINA CYCÓW
    0 references
    0 references
    Głównym celem projektu jest poprawa jakości dostarczanych wód na cele socjalno - bytowe poprzez modernizację istniejącej infrastruktury dostarczania wody w Gminie Cyców. Cel szczegółowy projektu to poprawa jakości życia mieszkańców Gminy Cyców poprzez zmniejszenie ryzyka wynikającego z kontaktu z wodą zanieczyszczoną. Zakres projektu zgodnie ze wskaźnikami planowanymi do osiągnięcia oraz harmonogramem rzeczowo-finansowym: 1) ujęcie wody - studnie - zakłada się modernizację istniejących studni oraz wymianę pomp głębinowych na bardziej energooszczędne; 2) budynek SUW z wyposażeniem - planowane są prace modernizacyjne, m.in. wykonanie izolacji termicznej budynku, wymiana dachu, posadzek itp., jak również modernizację bądź wymianę urządzeń umożliwiających skuteczne uzdatnianie wody; 3) zbiornik wodociągowy - zaplanowano zbiornik wodociągowy żelbetowy 150 m3 4) rurociągi międzyobiektowe - wykonane zostaną rurociągi technologiczne wewnętrzne i zewnętrzne ze stali nierdzewnej 5) kanalizacja zewnętrzna - dotyczy wpięcia wód opadowych z obu zbiorników - studni nr 1 i studni nr 2 do istniejącej sieci kanalizacyjnej znajdującej się w granicach przedmiotowej działki 6) ogrodzenie - planuje się rozbiórkę istniejącego ogrodzenia ujęcia wody i wykonanie nowego 7) obsianie trawników - planowane jest uzupełnienie zieleni istniejącej 8) drogi i chodniki wewnętrzne - utwardzenie dróg na terenie SUW 9) drogi zewnętrzne (niekwalifikowane) - fragment drogi dojazdowej do SUW 10) obsługa geodezyjna i wykonanie analiz wody 11) dokumentacja techniczna 12) nadzór inwestorski 13) promocja projektu 14) studium wykonalności Kluczowe rezultaty projektu zgodnie ze wskaźnikami rezultatu: Przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę: 3168. W ramach projektu modernizacji stacji uzdatniania wody w Cycowie nastąpi poprawa jakości dostarczanej wody dla 3168 osób obsługiwanych przez SUW. (Polish)
    0 references
    The main objective of the project is to improve the quality of the water supplied for social and living purposes by modernising the existing water supply infrastructure in the Tits Commune. The specific objective of the project is to improve the quality of life of residents of Cyc Municipality by reducing the risk of contact with contaminated water. The scope of the project according to the indicators to be achieved and the factual and financial timetable: 1) water intake – wells – is assumed to modernise existing wells and replace deep-sea pumps with more energy-efficient; 2) SUW building with equipment – modernisation works are planned, including thermal insulation of the building, replacement of roofs, floors, etc., as well as modernisation or replacement of equipment for efficient water treatment; 3) water supply tank – planned reinforced concrete tank 150 m³ 4) inter-object pipelines – internal and external pipelines will be made of stainless steel 5) external sewerage – concerns the connection of rainwater from both tanks – well No.1 and well No 2 to the existing sewage network (11 internal sewage network) repair of roads within the limits of the plot 6) fence – planned demolition of the existing fence and execution of the new 7) Expected number of people benefiting from improved water supply: 3168. As part of the project to modernise the water treatment station in Cyców, the quality of the water supply will be improved for 3168 people operated by SUW. (English)
    17 October 2020
    0 references
    L’objectif principal du projet est d’améliorer la qualité de l’eau fournie à des fins sociales et vivantes en modernisant les infrastructures d’approvisionnement en eau existantes dans la municipalité de Cyca. L’objectif spécifique du projet est d’améliorer la qualité de vie des résidents de la municipalité de cyce en réduisant les risques liés au contact avec de l’eau contaminée. Portée du projet selon les indicateurs à atteindre et le calendrier matériel et financier: 1) la prise d’eau — puits — est destinée à moderniser les puits existants et à remplacer les pompes submersibles par une plus grande efficacité énergétique; 2) Bâtiment SUW avec équipement — des travaux de modernisation sont prévus, y compris l’isolation thermique du bâtiment, le remplacement des toitures, des planchers, etc., ainsi que la modernisation ou le remplacement des équipements permettant un traitement efficace de l’eau; 3) réservoir d’eau — 150 m³ réservoir d’eau en béton armé est prévu 4) pipelines inter-objets — pipelines technologiques internes et externes en acier inoxydable 5) égouts extérieurs — il concerne l’entrée de l’eau de pluie des deux réservoirs — puits 1 et puits 2 au réseau d’égouts existant situé dans les limites de la parcelle en question 6) clôture — il est prévu de démolir la clôture existante pour le captage d’eau et faire un nouveau 7) semis de pelouses — il est prévu de compléter la verdure de l’actuelle 8) route et trottoirs internes — durcissement des routes en SUW 9) routes extérieures (sans qualification) — tronçon de route d’accès à SUW 10) services géodésiques et analyses de l’eau 11) documentation technique 12) supervision des investisseurs 13) promotion du projet 14) Étude de faisabilité Résultats clés du projet selon les indicateurs de résultat: Nombre attendu de personnes bénéficiant d’une amélioration de l’approvisionnement en eau: 3168. Dans le cadre du projet de modernisation de la station d’épuration de Cyców, la qualité de l’eau fournie à 3168 personnes desservies par la SUW sera améliorée. (French)
    1 December 2021
    0 references

    Identifiers

    RPLU.06.04.00-06-0061/15
    0 references