Thermal modernisation of public buildings in the Opole Lubelskie Municipality (Q105448)

From EU Knowledge Graph
Revision as of 09:50, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Dans le cadre du projet, la requérante a prévu un investissement consistant en la thermomodernisation de 5 bâtiments publics — cinq écoles situées dans la municipalité d’Opole Lubelskie. L’objectif principal du projet est d’améliorer la qualité des services sociaux fournis en améliorant l’efficacité énergétique des bâtiments publics. L’investissement permettra d’accroître l’efficacité énergétique du bâtiment de 61,90 %. L’option proposée compren...)
Jump to navigation Jump to search
Project Q105448 in Poland
Language Label Description Also known as
English
Thermal modernisation of public buildings in the Opole Lubelskie Municipality
Project Q105448 in Poland

    Statements

    0 references
    8,112,897.26 zloty
    0 references
    1,947,095.34 Euro
    13 January 2020
    0 references
    9,544,585.03 zloty
    0 references
    2,290,700.41 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 December 2015
    0 references
    30 December 2019
    0 references
    GMINA OPOLE LUBELSKIE
    0 references
    W ramach projektu Wnioskodawca zaplanował inwestycję polegającą na termomodernizacji 5 budynków użyteczności publicznej - 5 szkół zlokalizowanych na terenie Gminy Opole Lubelskie. Celem głównym projektu jest podniesienie jakości świadczonych usług społecznych dzięki poprawie efektywności energetycznej w budynkach użyteczności publicznej. W ramach inwestycji osiągnięte zostanie zwiększenie efektywności energetycznej budynku o 61,90%. Zaproponowany wariant obejmuje prace termo modernizacyjne w budynkach: Budynek szkoły przy Ul. Fabrycznej 28 w Opolu Lubelskim, Budynek szkoły w miejscowości Skoków ; Budynek szkoły w Wandalinie; Budynek szkoły w Kluczkowicach; Budynek szkoły przy Ul. Szkolnej 5 w Opolu Lubelskim. W zakresie projektu jest także wykonanie systemu na cele zarządzania energią. W ramach inwestycji osiągnięte zostaną następujące wartości wskaźników rezultatu:1. Ilość zaoszczędzonej energii cieplnej. - 9548,38 GJ/rok 2. Szacowany roczny spadek emisji gazów cieplarnianych (CI34) - 840,08 t/rok 3. Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE - 34,65 MWh/rok 4. Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE - 34,65 MWh/rok 5. Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CI32) - 3793164,10kWh/rok 6. Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE - 98,93 MWh/rok 7. Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE - 98,93 MWh/rok Powstanie 5 instalacji PV na 5 budynkach w/w szkół. Instalacje zostaną zlokalizowane na dachach.Moduły PV wykonane z ogniw krzemowych. Łączna moc instalacji wynosi 31,5 KW tj. 0,031MW. Powstanie 1 instalacja 10,8 KW, 1 inst. 5,1KW, oraz 3 inst. po 5,2KW. (Polish)
    0 references
    As part of the project, the applicant planned an investment consisting of a thermomodernisation of 5 public buildings – 5 schools located in the Opole Lubelskie commune. The main objective of the project is to improve the quality of social services provided by improving energy efficiency in public buildings. As part of the investment, the energy efficiency of the building will be increased by 61.90 %. The proposed option includes thermal retrofitting in buildings: School building on Ul. Factory 28 in Opole Lubelski, School Building in Skoków; The school building in Vandalin; School building in Kluczkowice; School building on Ul. School 5 in Opole Lubelski. The project also includes the implementation of the system for energy management purposes. The following result indicators will be achieved under the investment:1. The amount of thermal energy saved. — 9548,38 GJ/year 2. Estimated annual reduction in greenhouse gas emissions (CI34) – 840.08 t/year 3. Production of electricity from newly built/new RES installations – 34,65 MWh/year 4. Production of electricity from newly built RES installations – 34,65 MWh/year 5. Reduction of annual primary energy consumption in public buildings (CI32) – 3793164.10 kWh/year 6. Production of heat from newly built/new RES installations – 98,93 MWh/year 7. Production of thermal energy from newly built RES installations – 98.93 MWh/year The creation of 5 PV installations per 5 buildings in the above schools. The installations will be located on roofs.PV modules made of silicon cells. The total capacity of the installation is 31,5 KW, i.e. 0,031 MW. 1 installation 10.8 KW, 1 inst. 5,1KW, and 3 inst. after 5,2KW. (English)
    17 October 2020
    0 references
    Dans le cadre du projet, la requérante a prévu un investissement consistant en la thermomodernisation de 5 bâtiments publics — cinq écoles situées dans la municipalité d’Opole Lubelskie. L’objectif principal du projet est d’améliorer la qualité des services sociaux fournis en améliorant l’efficacité énergétique des bâtiments publics. L’investissement permettra d’accroître l’efficacité énergétique du bâtiment de 61,90 %. L’option proposée comprend des travaux de modernisation thermique dans les bâtiments: L’école construit sur Ul. Usine 28 à Opole Lubelski, bâtiment scolaire à Skoków; La construction de l’école à Vandalin; La construction de l’école à Kluczkowice; L’école construit sur Ul. École 5 à Opole Lublin. Le projet comprend également la mise en œuvre d’un système de gestion de l’énergie. L’investissement permettra d’atteindre les indicateurs de résultat suivants:1. La quantité d’énergie thermique économisée. — 9548,38 GJ/an 2. Réduction annuelle estimée des émissions de gaz à effet de serre (CI34) — 840,08 t/an 3. Production d’électricité à partir de nouvelles capacités de production d’installations SER — 34,65 MWh/an 4. Production d’électricité à partir d’installations SER nouvellement construites — 34,65 MWh/an 5. Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics (CI32) — 3 793 164,10 kWh/an 6. Production de chaleur à partir de nouvelles capacités de production d’installations SER — 98,93 MWh/an 7. Production d’énergie thermique à partir d’installations SER nouvellement construites — 98,93 MWh/an 5 installations photovoltaïques seront installées sur 5 bâtiments dans les écoles susmentionnées. Les installations seront situées sur les modules de toits.PV en cellules en silicium. La capacité totale de l’installation est de 31,5 KW, c’est-à-dire 0,031 MW. 1 installation de 10.8 KW, 1 inst. 5,1KW, et 3 inst. 5,2KW. (French)
    1 December 2021
    0 references

    Identifiers

    RPLU.05.02.00-06-0117/16
    0 references