Use of renewable energy sources in the municipality of Firlej (Q104694)

From EU Knowledge Graph
Revision as of 09:37, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q104694 in Poland
Language Label Description Also known as
English
Use of renewable energy sources in the municipality of Firlej
Project Q104694 in Poland

    Statements

    0 references
    4,207,201.93 zloty
    0 references
    1,009,728.46 Euro
    13 January 2020
    0 references
    4,949,649.34 zloty
    0 references
    1,187,915.84 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    9 February 2016
    0 references
    30 November 2018
    0 references
    GMINA FIRLEJ
    0 references
    0 references
    Celem głównym projektu jest upowszechnienie technologii wytwarzania czystej energii wśród mieszkańców poprzez powszechny montaż OZE na terenie gm. Firlej. Realizacja projektu posłuży również dywersyfikacji źródeł pozyskiwania energii cieplnej, a tym samym poprawie bezpieczeństwa energetycznego mieszkańców gminy. Ponadto wzrost wytwarzania energii cieplnej z OZE przyczyni się bezpośrednio do redukcji zanieczyszczenia powietrza atmosferycznego i poprawy jego jakości. Stanie się to dzięki zmniejszeniu emisji gazów cieplarnianych do atmosfery. W konsekwencji inwestycja w rozwój instalacji OZE poprawi komfort życia mieszkańców m.in. poprzez zmniejszenie obciążeń finansowych społeczności lokalnej oraz podniesie atrakcyjność społeczno-gospodarczą gminy. Powyższe rezultaty zostaną osiągnięte, dzięki zadaniom realizowanym w projekcie tj. montaż instalacji wykorzystujących OZE w budynkach mieszkalnych i użyteczności publicznej.W ramach projektu na terenie gminy Firlej zostanie zamontowanych 508 instalacji kolektorów słonecznych w budynkach mieszkalnych. Zestawy kolektorów słonecznych będą składały się z 1 absorbera, o łącznej mocy od 2,72 kW do 3,36 kW. Projekt przewiduje również zainstalowanie 25 szt kotłów na biomasę (13 kotłów o mocy 25 kW i 12 kotłów o mocy 20 kW) z czego 2 zostaną zainstalowane w budynkach użytecz. publiczn. W wyniku realizacji projektu dodatkowa zdolność wytwarzania energii z OZE na terenie gminy wyniesie 2,144 MW, a produkcja energii cieplnej z nowo wybudowanych instalacji wytwórczych wykorzystujących OZE osiągnie wartość 1208,86 MWh/rok. Szacuje się także, że dzięki zainstalowaniu nowo wybudowanych OZE roczny spadek emisji gazów cieplarnianych wyniesie 731,75 ton ekwiwalentu CO2. Planowana inwestycja jest zgodna szeregiem dokumentów strategicznych wykazanych w niniejszym wniosku w punkcie 2.11, zapisami Strategii Rozwoju Gminy Firlej , Planu Gospodarki Niskoemisyjnej dla gm. Firlej oraz Programem ochrony powietrza dla strefy lubelskiej. (Polish)
    0 references
    The main objective of the project is to popularise clean energy generation technologies among residents through the general assembly of RES in the Firlej area. The implementation of the project will also serve to diversify sources of thermal energy and thus improve the energy security of residents of the municipality. In addition, the increase in the production of thermal energy from RES will directly contribute to reducing atmospheric air pollution and improving its quality. This will be done by reducing greenhouse gas emissions into the atmosphere. As a result, the investment in the development of RES installations will improve the comfort of life of residents, among others by reducing the financial burden of the local community and will increase the socio-economic attractiveness of the commune. The above results will be achieved thanks to the tasks carried out in the project, i.e. installation of RES installations in residential and public buildings.As part of the project, 508 solar collectors installations in residential buildings will be installed in Firlej commune. Solar collector sets will consist of 1 absorber, with a total power from 2.72 kW to 3.36 kW. The project also provides for the installation of 25 boilers for biomass (13 boilers with a capacity of 25 kW and 12 boilers with a power of 20 kW) of which 2 will be installed in public buildings. As a result of the project, the additional RES generation capacity in the commune will amount to 2.144 MW, and the production of heat from newly built RES generating installations will reach the value of 1208.86 MWh/year. It is also estimated that, thanks to the installation of newly built RES, an annual reduction in greenhouse gas emissions will amount to 731.75 tonnes CO2 equivalent. The planned investment is consistent with a number of strategic documents set out in this proposal in point 2.11, the provisions of the Firlej Municipality Development Strategy, the Low-Emission Economy Plan for the Firlej Municipality and the Programme of Air Protection for the Lublin Zone. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.01.00-06-0081/16
    0 references