Photovoltaic installation at DREWBETEX Marcin Kawecki (Q104896)

From EU Knowledge Graph
Revision as of 09:13, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet est de mettre en œuvre le système de production d’électricité utilisant des sources d’énergie renouvelables sous forme de panneaux photovoltaïques. L’introduction des solutions envisagées contribuera, entre autres, aux objectifs spécifiques suivants: * Production d’électricité utilisant des SER * Amélioration de la sécurité énergétique de la requérante en diversifiant les sources de production d’électricité pour le...)
Jump to navigation Jump to search
Project Q104896 in Poland
Language Label Description Also known as
English
Photovoltaic installation at DREWBETEX Marcin Kawecki
Project Q104896 in Poland

    Statements

    0 references
    35,056.46 zloty
    0 references
    8,413.55 Euro
    13 January 2020
    0 references
    53,933.03 zloty
    0 references
    12,943.93 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 July 2017
    0 references
    31 August 2018
    0 references
    DREWBETEX MARCIN KAWECKI
    0 references
    0 references
    Głównym celem projektu jest wdrożenie systemu produkcji energii elektrycznej przy wykorzystaniu odnawialnych źródeł energii w postaci paneli fotowoltaicznych. Wprowadzenie do użytkowania zakładanych rozwiązań przyczyni się do osiągnięcia m.in. następujących celów szczegółowych: * Produkcja energii elektrycznej z wykorzystaniem OZE * Poprawa bezpieczeństwa energetycznego firmy Wnioskodawcy poprzez dywersyfikację źródeł pozyskiwania energii elektrycznej, służących działalności produkcyjnej firmy. * Poprawa stanu środowiska naturalnego. * Wzrost konkurencyjności Wnioskodawcy * Zastosowanie rozwiązań TIK w zakresie obsługi instalacji * Budowa wizerunku firmy w zakresie działalności na rzecz ochrony środowiska * Wzrost zatrudnienia - stanowisko ds. obsługi funkcjonowania instalacji. * Edukacja ekologiczna Instalacja OZE będzie posiadała moc: 11,48 kWp, będzie generować w skali roku 12145 kWh energii elektrycznej. W wyniku wdrożenia projektu zostanie uzyskany efekt ekologiczny związany z ograniczeniem emisji CO2 do środowiska o 4,0355 tony/rok, a także pyłu zawieszonego PM 10 o 0,0008 tony/rok. W wyniku realizacji projektu zostaną zastosowane technologie informacyjno-komunikacyjne, nastąpi wzrost zatrudnienia oraz zostaną wprowadzone działania na rzecz wzrostu świadomości ekologicznej w społeczeństwie. Projekt po przeprowadzenia całościowej analizy wariantowej przewiduje budowę instalacji fotowoltaicznej, opartej na panelach polikrystalicznych. Wybrano najbardziej optymalny i zgodny z założeniami projektu wariant. Najważniejszą jego zaletą jest możliwość osiągnięcia wszystkich założonych w projekcie celów, a także niższe nakłady inwestycyjne w porównaniu z innymi, alternatywni wariantami, rozpatrywanymi na potrzeby projektu. Wnioskodawca założył efektywną realizację wszystkich założeń projektowych, przy jednoczesnym zachowaniu nakładów inwestycyjnych, które są adekwatne do osiągniętych rezultatów. Wybrany Wariant zapewni wysoką wydajność i jakość instalacji (Polish)
    0 references
    The main objective of the project is to implement a system of electricity production using renewable energy sources in the form of photovoltaic panels. The introduction of the proposed solutions will contribute to the achievement of, inter alia, the following specific objectives: * Production of electricity using RES * Improvement of energy security of the Applicant’s company through diversification of sources of electricity generation, serving the company’s production activities. * Improving the environment. * Increasing competitiveness of the Applicant * Application of ICT solutions in the field of installation operation * Building the company’s image in the field of environmental activities * Employment growth – position for operation of installations. * Ecological education The RES installation will have the power: 11.48 kWp, will generate 12145 kWh of electricity per year. As a result of the implementation of the project, the environmental effect of reducing CO2 emissions to the environment by 4.0355 tonnes/year, as well as particulate matter PM 10 by 0.0008 tonnes/year will be achieved. As a result of the project, information and communication technologies will be used, employment increases and measures to increase environmental awareness in society will be implemented. The project, after a complete variant analysis, envisages the construction of a photovoltaic installation based on polycrystalline panels. The most optimal and project-compliant option was chosen. Its main advantage is the ability to achieve all the objectives set in the project, as well as lower investment outlays compared to other alternative options considered for the project. The applicant has established effective implementation of all project assumptions, while maintaining investment expenditures that are adequate to the results achieved. Selected variant will ensure high efficiency and quality of installation (English)
    17 October 2020
    0 references
    L’objectif principal du projet est de mettre en œuvre le système de production d’électricité utilisant des sources d’énergie renouvelables sous forme de panneaux photovoltaïques. L’introduction des solutions envisagées contribuera, entre autres, aux objectifs spécifiques suivants: * Production d’électricité utilisant des SER * Amélioration de la sécurité énergétique de la requérante en diversifiant les sources de production d’électricité pour les activités de production de l’entreprise. *Amélioration de l’environnement. * Renforcement de la compétitivité de la requérante * Application de solutions TIC dans le domaine de l’exploitation des installations * Construction de l’image de l’entreprise dans le domaine de la protection de l’environnement * Croissance de l’emploi — position pour l’exploitation de l’installation. * Éducation environnementale L’installation RES aura la puissance: 11,48 kWc, produira sur une base annuelle 12 145 kWh d’électricité. La mise en œuvre du projet aura pour effet écologique de réduire les émissions de CO2 dans l’environnement de 4,0355 tonnes/an, ainsi que de PM 10 de 0,0008 tonnes/an. Grâce au projet, les technologies de l’information et de la communication seront utilisées, l’emploi augmentera et des mesures visant à accroître la sensibilisation à l’environnement dans la société seront mises en place. Le projet, à la suite d’une analyse complète des variantes, prévoit la construction d’une installation photovoltaïque basée sur des panneaux polycristallins. L’option la plus optimale et la plus cohérente a été sélectionnée. L’avantage le plus important est la capacité d’atteindre tous les objectifs fixés dans le projet, ainsi que la réduction des dépenses d’investissement par rapport aux autres options envisagées pour le projet. La requérante a supposé la mise en œuvre effective de tous les objectifs du projet, tout en préservant les dépenses d’investissement appropriées aux résultats obtenus. La variante sélectionnée assurera une grande efficacité et la qualité de l’installation (French)
    1 December 2021
    0 references

    Identifiers

    RPLU.04.02.00-06-0096/17
    0 references