Construction of a photovoltaic micro-installation on the building (Q104858)

From EU Knowledge Graph
Revision as of 09:13, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q104858 in Poland
Language Label Description Also known as
English
Construction of a photovoltaic micro-installation on the building
Project Q104858 in Poland

    Statements

    0 references
    111,315.88 zloty
    0 references
    26,715.81 Euro
    13 January 2020
    0 references
    171,255.2 zloty
    0 references
    41,101.25 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    6 February 2018
    0 references
    31 January 2019
    0 references
    MIGRO MAREK PILIP
    0 references
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznej na dachu budynku hali produkcyjnej. Lokalizacja: Komarów-Osada, 3-go Maja 160, dz. nr ewid. 1021/2 Inwestor: Migro Pilip Marek, 22-435 Komarów Osada System fotowoltaiczny podłączony będzie na stałe do sieci elektroenergetycznej. Ewentualna nadwyżka energii elektrycznej wyprodukowana przez fotoogniwa odsprzedawana będzie zarządcy sieci elektroenergetycznej. W skład instalacji fotowoltaicznej wchodzą: - Ogniwa fotowoltaiczne polikrystaliczne o mocy 265Wp - 148kpl. wraz z osprzętem do montażu - Inwertery fotowoltaiczne trójfazowe o mocy maksymalnej 20kW - 2kpl. - zabezpieczenia po stronie prądu stałego: * rozłącznik izolacyjny 1P 20A DC * ochronniki 2P UMAX=1000V DC - zabezpieczenia po stronie prądu zmiennego: * wyłącznik różnicowoprądowy 4P 40/0,03 A * wyłącznik nadprądowy 3P B32A AC * ochronnik 3f AC 400V typ B+C * rozłącznik bezpiecznikowy R303 64A - Tablica przyłączeniowa TGPV - 1kpl (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic installation on the roof of a production hall building. Location: Mosquito-Osada, May 3rd, 160, Dz. No. 1021/2 Investor: MIGRO Pilip Marek, 22-435 Komarów Osada The photovoltaic system will be permanently connected to the power grid. Any excess electricity produced by photovoltaic cells will be resold to the electricity grid manager. The photovoltaic installation consists of: — Polycrystalline photovoltaic cells with a power of 265Wp – 148kpl. together with fittings – Three phase photovoltaic inverters with a maximum power of 20 kW – 2kpl. — protection on the direct current side: * 1P 20A DC insulating disconnector * 2P Umax=1000V DC protectors – AC side protection: * differential current switch 4P 40/0.03 A * overcurrent switch 3P B32A AC * protector 3f AC 400V type B+C * fuse switch R303 64A – TGPV connector – 1kpl (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0037/17
    0 references