Construction of photovoltaic installations for OPK Opole Lubelskie (Q104832)

From EU Knowledge Graph
Revision as of 09:13, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): 1---- L’objectif du projet est de réduire les coûts de l’électricité en produisant de l’électricité à des fins propres. L’objectif sera atteint par la construction de 5 micro-installations photovoltaïques, une sur le site de la station d’épuration et quatre dans des stations d’épuration d’une capacité totale de 0,1244 MW. 2.----------Concepts — construction d’installations microvoltaiques d’une capacité de 0,1244 MW Coûts admissibles 494 500,00...)
Jump to navigation Jump to search
Project Q104832 in Poland
Language Label Description Also known as
English
Construction of photovoltaic installations for OPK Opole Lubelskie
Project Q104832 in Poland

    Statements

    0 references
    222,525.0 zloty
    0 references
    53,406.0 Euro
    13 January 2020
    0 references
    494,500.0 zloty
    0 references
    118,680.0 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    1 April 2018
    0 references
    31 December 2018
    0 references
    OPOLSKIE PRZEDSIĘBIORSTWO KOMUNALNE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    1---- celem projektu jest obniżenie kosztów energii elektrycznej poprzez produkcję energii elektrycznej na własne potrzeby. Cel zostanie zrealizowany przez budowę 5 mikro instalacji fotowoltaicznej jednej na terenie oczyszczalni ścieków i czterech na stacjach uzdatniania wody o łącznej mocy 0,1244 MW. 2.-------- Zdania -wybudowanie mikro instalacji fotowoltaicznych o mocy 0,1244 MW Koszty kwalifikowane 494 500,00 PLN netto. Dotacja 222 525,00 PLN netto 3----- Podstawowe wskaźniki moc 0,1244 MW Produkcja energii roczna 136,9 MWh. Uniknięta emisja CO2 45,48 t rocznie---wybudowanie 5 jednostek produkujących energię elektryczną- wzrost zatrudnienia o 1 osobę nadzorującą instalacje i monitorującą zużycie energii w firmie. 4--------- Instalacje zostaną wybudowane na terenie wiejskim 0612055 .5--------Technicznie instalacja będzie się składała z określonej liczby paneli fotowoltaicznych polikrystalicznych połączonych szeregowo w stringi i string zostanie podłączony do inwertera czyli urządzenia przetwarzającego prąd stały w prąd zmienny o parametrach zgodnych z parametrami sieci określonymi przez Operatora Sieci Dystrybucyjnej. Panel i inwerter muszą posiadać odpowiednie certyfikaty dopuszczające do pracy w Polsce. Dodatkowo każda instalacja zostanie wyposażona w technologię TIK, której zadaniem jest monitoring produkcji energii elektrycznej oraz parametrów inwertera a także paneli fotowoltaicznych. Dostęp do tych danych poprzez zaimplementowana technologię TIK będzie możliwy przez stronę internetową udostępnioną przez producenta inwertera lub przez aplikacje na Smartfonie. 6------- Inwestycja jako budowa miro instalacji nie wymaga pozwolenia na budowę ani zgłoszenie ani zgłoszenia robót co wynika wprost z Prawa Budowlanego (wysokość instalacji poniżej 3m) 7--------Po zakończeniu projektu wnioskodawca będzie promował projekt oraz wiedzę na temat odnawialnych żródeł energii poprzez dystrybucję ulotek informacyjnych wśród swoich klientów. (Polish)
    0 references
    1---- the aim of the project is to reduce the cost of electricity by producing electricity for its own needs. The target will be achieved by the construction of 5 micro photovoltaic installations of one in the sewage treatment plant and four in water treatment stations with a total capacity of 0.1244 MW. 2.----------Those -construction of micro photovoltaic installations with a capacity of 0.1244 MW Qualified costs 494 500,00 PLN net. Grant 222 525,00 PLN net 3------ Basic capacity indicators 0,1244 MW Energy production annual 136,9 MWh. Avoided CO2 emissions of 45.48 t per annum-build 5 units producing electricity- an increase in employment of 1 person supervising installations and monitoring energy consumption in the company. The 4— The panel and inverter must have appropriate certificates allowing to work in Poland. In addition, each installation will be equipped with ICT technology, whose task is to monitor the production of electricity and inverter parameters as well as photovoltaic panels. Access to this data through the implemented ICT technology will be possible through a website provided by the inverter manufacturer or through Smartphone applications. The 6— (English)
    17 October 2020
    0 references
    1---- L’objectif du projet est de réduire les coûts de l’électricité en produisant de l’électricité à des fins propres. L’objectif sera atteint par la construction de 5 micro-installations photovoltaïques, une sur le site de la station d’épuration et quatre dans des stations d’épuration d’une capacité totale de 0,1244 MW. 2.----------Concepts — construction d’installations microvoltaiques d’une capacité de 0,1244 MW Coûts admissibles 494 500,00 PLN net. Grant PLN 222 525,00 net 3---- Indicateurs de puissance de base 0,1244 MW Production annuelle d’énergie 136,9 MWh. Émissions de CO2 évitées 45,48 t par an — construction de 5 unités produisant de l’électricité — une augmentation de l’emploi d’une personne chargée de superviser l’installation et de surveiller la consommation d’énergie de l’entreprise. 4-------- Des installations seront construites en zone rurale 0612055.5---------------------- Techniquement l’installation consistera en un certain nombre de panneaux photovoltaïques polycristallins connectés en série en chaînes et des chaînes seront connectées à l’onduleur, c’est-à-dire un dispositif convertissant le courant direct en courant alternatif avec des paramètres compatibles avec les paramètres du réseau spécifiés par l’opérateur de réseau de distribution. Le panneau et l’onduleur doivent être munis des certificats appropriés leur permettant de travailler en Pologne. En outre, chaque installation sera équipée de technologies de l’information et de la communication, dont la tâche est de surveiller la production d’électricité et les paramètres de l’onduleur ainsi que les panneaux photovoltaïques. L’accès à ces données par le biais de la technologie informatique mise en œuvre sera possible via un site web mis à disposition par le fabricant de l’onduleur ou par des applications sur Smartphone. 6------ L’investissement en tant qu’installation de construction ne nécessite pas de permis de construire, de notification ou de notification des travaux, ainsi qu’il ressort de la loi sur la construction (hauteur de l’installation inférieure à 3 m) 7------ Après l’achèvement du projet, le demandeur favorisera le projet et la connaissance des sources d’énergie renouvelables en distribuant des brochures d’information à ses clients. (French)
    1 December 2021
    0 references

    Identifiers

    RPLU.04.02.00-06-0004/17
    0 references