Extension and reconstruction of sewage treatment plants, extension of SUW and construction of a section of the sewage system in Trzebiechów district (Q100395)

From EU Knowledge Graph
Revision as of 08:52, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La mise en œuvre du projet concerne l’extension et la reconstruction de la station d’épuration des eaux usées, l’extension de la station d’épuration des eaux usées et la construction d’un autre tronçon du réseau d’assainissement collectif dans les limites de l’agglomération de Trzebiech, désignée par le règlement no 12/08 de la province de Lubuskie du 9 mai 2008, et qui, en 2016, a modifié la limite en raison de laquelle sa taille après ce chang...)
Jump to navigation Jump to search
Project Q100395 in Poland
Language Label Description Also known as
English
Extension and reconstruction of sewage treatment plants, extension of SUW and construction of a section of the sewage system in Trzebiechów district
Project Q100395 in Poland

    Statements

    0 references
    5,270,625.44 zloty
    0 references
    1,264,950.11 Euro
    13 January 2020
    0 references
    6,953,986.25 zloty
    0 references
    1,668,956.7 Euro
    13 January 2020
    0 references
    75.79 percent
    0 references
    7 November 2016
    0 references
    30 April 2020
    0 references
    ZAKŁAD GOSPODARKI KOMUNALNEJ SP. Z O.O.
    0 references
    0 references

    52°1'21.4"N, 15°44'8.9"E
    0 references
    Realizacja projektu dotyczy rozbudowy i przebudowy oczyszczalni ścieków, rozbudowy stacji uzdatniania wody oraz budowy kolejnego odcinka systemu kanalizacji zbiorczej w granicach Aglomeracji Trzebiechów, która została wyznaczona Rozporządzeniem Nr 12/08 Wojewody Lubuskiego z 9.05.2008r., a której w 2016r. zmieniono granicę w efekcie czego jej wielkość RLM po niniejszej zmianie zwiększyła się z pierwotnych 2 900 do 4 405 RLM. Zatem celem głównym projektu jest uporządkowanie gospodarki w zakresie odprowadzania i oczyszczania ścieków komunalnych i przemysłowych, w efekcie ograniczenie ilości zanieczyszczeń przedostających się do wód i gleby na terenie Aglomeracji Trzebiechów, poprzez budowę efektywnego systemu odbioru i oczyszczania ścieków, a także dostarczania wody odpowiadającego polskim i europejskim wymaganiom prawa pozwalającego na ochronę środowiska naturalnego gminy Trzebiechów. Aby możliwe było osiągnięcie ww. celu, realizacja projektu składa się z takich zadań, jak: I. Dokumentacja, w tym: a) PFU - oczyszczalnia, b) PFU - SUW, c) Projektu budowlanego - oczyszczalnia i SUW, d) dokumentacji aplikacyjnej. II. Nadzów inwestorski. III. Rozbudowa i przebudowa oczyszczalni oraz rozbudowa SUW, a także budowa odcinka systemu kanalizacji zbiorczej (w trybie zaprojektuj i wybuduj). IV. Promocja, w tym: tablice info.-promocyjne. Efektem tak zaplanowanego projektu będzie: - wybudowanie w 2019 0,2255 km sieci kanalizacji sanitarnej, dzięki czemu 41 dodatkowych mieszkańców ww. aglomeracji będzie mogło korzystać z ulepszonego oczyszczania ścieków, - 1 przebudowana do 2020 oczyszczalnia, która będzie zdolna do przyjęcia 241 900,46 [g/d] ładunku ścieków, - 1 wsparta w 2019 SUW. Projekt realizowany będzie zatem przez ZGK Sp. z o.o. w Trzebiechowie, który będzie zarządzał powstałą w efekcie realizacji niniejszego przedsięwzięcia infrastrukturą w ramach wypełniania obowiązków opisanych wyżej. Zakład ten będzie również właścicielem powstałej infrastruk (Polish)
    0 references
    The implementation of the project concerns the extension and reconstruction of the sewage treatment plant, the extension of the water treatment station and the construction of the next section of the sewage system within the Trzebiechów Agglomeration, which was designated by Regulation No. 12/08 of Lubuski Voivode from 9.05.2008, and whose limit was changed in 2016 and its RLM size increased after this change from the original 2 900 to 4 405 RLM. Thus, the main objective of the project is to organise the economy in the field of discharge and treatment of municipal and industrial waste water, as a result, to reduce the amount of pollution entering water and soil in the Trzebiechów Agglomeration, by building an effective system for the collection and treatment of waste water, as well as the supply of water corresponding to the Polish and European legal requirements enabling the protection of the natural environment of the municipality of Trzebiechów. In order to achieve this objective, the implementation of the project consists of tasks such as: I. Documentation, including: a) PFU – treatment plant, b) PFU – SUW, (c) Construction project – treatment plant and SUW, (d) application documentation. II. The investor’s overhead. III. Extension and reconstruction of the treatment plant and extension of the SUW, as well as the construction of a section of the sewage system (in design and build mode). IV. Promotion, including: info-promotion plates. The result of such a planned project will be: — construction in 20190.2255 km of sanitary sewage system, so that 41 additional residents of the above agglomerations will be able to benefit from improved sewage treatment, – 1 rebuilt to 2020 treatment plant, which will be capable of accepting 241 900.46 [g/d] wastewater cargo, – 1 supported in 2019 SUW. The project will therefore be implemented by ZGK Sp. z o.o. in Trzebiechów, which will manage the infrastructure created as a result of this project as part of fulfilling the obligations described above. This facility will also own the resulting infrastruk (English)
    16 October 2020
    0 references
    La mise en œuvre du projet concerne l’extension et la reconstruction de la station d’épuration des eaux usées, l’extension de la station d’épuration des eaux usées et la construction d’un autre tronçon du réseau d’assainissement collectif dans les limites de l’agglomération de Trzebiech, désignée par le règlement no 12/08 de la province de Lubuskie du 9 mai 2008, et qui, en 2016, a modifié la limite en raison de laquelle sa taille après ce changement est passée de 2 900 à 4 405 EH. Par conséquent, l’objectif principal du projet est d’organiser l’économie dans le domaine de la collecte et du traitement des eaux urbaines et industrielles résiduaires, en réduisant la quantité de polluants entrant dans l’eau et le sol dans la zone de l’agglomération de Trzebiechów, en construisant un système efficace de collecte et de traitement des eaux usées, ainsi que l’approvisionnement en eau conformément aux exigences polonaises et européennes de la loi autorisant la protection de l’environnement naturel de la commune de Trzebiechów. Pour atteindre cet objectif, la mise en œuvre du projet comporte des tâches telles que: I. Documentation, y compris: a) UFP — station d’épuration, b) PFU — SUW, c) Projet de construction — usine de traitement et SUW, d) documentation relative aux demandes. II. La tête de l’investisseur. III. Extension et reconstruction de la station d’épuration et extension du SUW, ainsi que construction d’une section du système de collecte (conception et construction en mode). IV. Promotion, y compris: conseils d’info-promotion. Le résultat du projet ainsi planifié sera: — construction d’un réseau d’assainissement sanitaire en 20 190,2255 km, permettant à 41 habitants supplémentaires de l’agglomération de bénéficier d’un traitement amélioré des eaux usées, — 1 station d’épuration reconstruite d’ici 2020 capable d’accepter 241 900.46 [g/d] charge d’eaux usées, — 1 supporté en 2019 SUW. Le projet sera donc mis en œuvre par ZGK Sp. z o.o. à Trzebiechów, qui gérera l’infrastructure créée à la suite de la mise en œuvre de ce projet dans le cadre de l’exécution des obligations décrites ci-dessus. Cette usine sera également propriétaire de l’infrastructure mise en place (French)
    1 December 2021
    0 references

    Identifiers

    RPLB.04.03.00-08-0011/17
    0 references