THE USE OF RENEWABLE ENERGY SOURCES BY INSTALLING PHOTOVOLTAIC MODULES ON THE PROPERTY BELONGING TO PROFIGIPS WIŚNIK PECYNA SP. J. (Q101845)
Jump to navigation
Jump to search
Project Q101845 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | THE USE OF RENEWABLE ENERGY SOURCES BY INSTALLING PHOTOVOLTAIC MODULES ON THE PROPERTY BELONGING TO PROFIGIPS WIŚNIK PECYNA SP. J. |
Project Q101845 in Poland |
Statements
499,850.0 zloty
0 references
769,000.0 zloty
0 references
65.0 percent
0 references
2 December 2019
0 references
31 August 2020
0 references
„PROFIGIPS WIŚNIK, PECYNA” SPÓŁKA JAWNA
0 references
W ramach przedmiotowego projektu zaplanowano przeprowadzenie robót budowlano – montażowych w zakresie kompleksowego wykonania instalacji wykorzystującej OZE w postaci systemu fotowoltaicznego wytwarzającego energię elektryczną na potrzeby działalności firmy Profigips Wiśnik Pecyna Spółka Jawna. Instalacja zlokalizowana będzie na działkach należących do firmy - jako wolnostojąca na gruncie oraz na 3 budynkach należących do firmy. Projekt obejmował będzie zaprojektowanie, budowę, dostawę i montaż oraz przyłączenie do krajowego systemu elektroenergetycznego elektrowni fotowoltaicznej o łącznej mocy 200 KW, wraz z uruchomieniem i uzyskaniem dokumentacji formalno-prawnej, wymaganej przez obowiązujące przepisy, niezbędnej do uruchomienia i eksploatacji ww. elektrowni. Głównym przeznaczeniem instalacji będzie wykorzystanie energii na potrzeby działalności gospodarczej firmy, zatem grupą docelową projektu są pracownicy i kadra zarządzająca firmy – niezależnie od płci. Natomiast nadwyżki wyprodukowanej energii zostaną oddane do sieci. Wszelkie urządzenia i pozostałe zadania zaprojektowane i wykonane zostaną w myśl koncepcji projektowania uniwersalnego zgodnie z „Wytycznymi w zakresie realizacji zasady równości szans i niedyskryminacji, w tym dostępności dla osób z niepełnosprawnościami oraz zasady równości szans kobiet i mężczyzn w ramach funduszy unijnych na lata 2014-2020” z dnia 8 maja 2015 r. Celem głównym projektu jest poprawa jakości środowiska poprzez zwiększenie ilości energii pozyskiwanej z odnawialnych źródeł przy jednoczesnym zmniejszeniu ilości energii wytwarzanej w sposób konwencjonalny oraz osiągniecie oszczędności energii w firmie Profigips Wiśnik Pecyna Sp. J. Realizację inwestycji zaplanowano na lata 2018 - 2019 i jest gotowa do realizacji. Projekt ma trwały charakter. Firma pozostanie w okresie trwałości projektu właścicielem wybudowanej infrastruktury. (Polish)
0 references
As part of this project, construction and assembly works are planned to be carried out in the scope of a comprehensive installation using RES in the form of a photovoltaic system generating electricity for the purposes of Profigips Wiśnik Pecyna Spółka Jawna. The installation will be located on plots belonging to the company – as a stand-alone on the ground and on 3 buildings belonging to the company. The project will include the design, construction, supply and assembly and connection to the national electricity system of a photovoltaic power plant with a total capacity of 200 KW, together with the commissioning and obtaining of formal and legal documentation required by the applicable regulations, necessary for the commissioning and operation of the above-mentioned power plant. The main purpose of the installation will be to use energy for the company’s business activities, so the target group of the project is the employees and management staff of the company – regardless of gender. On the other hand, surplus energy produced will be put into the grid. All equipment and other tasks will be designed and performed in accordance with the “Guidelines for the implementation of the principle of equal opportunities and non-discrimination, including accessibility for people with disabilities and the principle of equal opportunities for women and men under EU funds 2014-2020” of 8 May 2015. The main objective of the project is to improve the quality of the environment by increasing the amount of energy generated from renewable sources while reducing conventionally produced energy and achieving energy savings at Profigips Wiśnik Pecy. J. The implementation of the investment is planned for the years 2018-2019 and is ready for implementation. The project is of a lasting nature. The company will remain in the lifetime of the project owner of the built infrastructure. (English)
17 October 2020
0 references
Dans le cadre de ce projet, il est prévu de réaliser des travaux de construction et d’assemblage d’une installation complète utilisant des SER sous la forme d’un système photovoltaïque produisant de l’électricité pour les besoins de Profigips Wiśnik Pecyna Spółka Jawna. L’installation sera située sur les parcelles appartenant à l’entreprise — comme libre sur le terrain et sur 3 bâtiments appartenant à l’entreprise. Le projet comprendra la conception, la construction, la fourniture, l’assemblage et la connexion au réseau électrique national d’une centrale photovoltaïque d’une capacité totale de 200 KW, ainsi que la mise en service et l’obtention de la documentation formelle et légale requise par la réglementation applicable, nécessaire à la mise en service et à l’exploitation de la centrale électrique susmentionnée. L’objectif principal de l’installation sera d’utiliser l’énergie pour les activités de l’entreprise, de sorte que le groupe cible du projet sont les employés et les gestionnaires de l’entreprise — quel que soit le sexe. En revanche, l’excédent d’énergie produit sera mis dans le réseau. Tous les équipements et autres tâches seront conçus et exécutés conformément au concept de conception universelle conformément aux «Lignes directrices pour la mise en œuvre du principe de l’égalité des chances et de non-discrimination, y compris l’accessibilité pour les personnes handicapées et le principe de l’égalité des chances pour les femmes et les hommes au titre des fonds de l’UE 2014-2020» du 8 mai 2015. Le principal objectif du projet est d’améliorer la qualité de l’environnement en augmentant la quantité d’énergie produite à partir de sources renouvelables tout en réduisant la quantité d’énergie produite de manière conventionnelle et en réalisant des économies d’énergie chez Profigips Wiśnik Pecyna Sp. J. La mise en œuvre de l’investissement est prévue pour 2018-2019 et est prête à être mise en œuvre. Le projet est de nature durable. L’entreprise restera propriétaire de l’infrastructure construite pendant la durée de vie du projet. (French)
1 December 2021
0 references
Identifiers
RPLD.04.01.02-10-0207/18
0 references