Statements
9,551,324.57 zloty
0 references
12,736,797.67 zloty
0 references
74.99 percent
0 references
7 November 2017
0 references
31 December 2020
0 references
GMINA OPOCZNO
0 references
Projekt realizowany będzie w formule partnerstwa publiczno-prywatnego zawartego pomiędzy Gminą Opoczno a wybranym partnerem prywatnym (obecnie trwa procedura wyboru). Planuje się włączenie do realizacji środków finansowych z UE, pozyskanych w ramach Działania IV.2.2 co stanowi, iż będzie to tzw. „projekt hybrydowy”. Przedsięwzięcie polega na przeprowadzeniu prac termomodernizacyjnych w budynkach użyteczności publicznej, zlokalizowanych na terenie Gminy Opoczno: Przedszkola nr 4, nr 5, nr 6, nr 8, Zespoły Szkół Samorządowych nr 1, nr 2, nr 3, Szkoła Podstawowa w Libiszowie i w Sielcu, Zespół Szkół w Ogonowicach, OPS w Opocznie. Celem głównym projektu jest poprawa efektywności energetycznej wskazanych budynków. Zostanie on osiągnięty poprzez realizację celów szczegółowych tj. roczne zmniejszenie zapotrzebowania na energię; optymalizacja zużycia energii elektrycznej; redukcja emisji CO2; uzyskanie oszczędności; sfinansowanie Projektu co najmniej w części z wygenerowanych oszczędności finansowych; brak wpływu zobowiązań z tytułu realizacji Projektu na państwowy dług publiczny oraz deficyt sektora finansów publicznych; podniesienie funkcjonalności i standardu użytkowania budynków. Odbiorcami końcowymi będą bezpośredni użytkownicy zmodernizowanych obiektów ale również, mając na uwadze efekt projektu w postaci podniesienia jakości powietrza dzięki ograniczeniu emisji zanieczyszczeń, wszystkie osoby przebywające na terenie Gminy Opoczno. W ramach prac przewiduje się m.in. Usprawnienia dotyczące: zmniejszenia strat przez przenikanie przez przegrody budowlane; zmniejszenia strat przez system c.o. i c.w.u. oraz wymiana opraw na LEDowe. Dodatkowym elementem będzie montaż systemów do zarządzania energią. Przy pracy nad założeniami projektu wzięto pod uwagę zasady uniwersalnego projektowania - wszystkie zadania są tak zaplanowane, aby były dostępne dla wszystkich interesariuszy, w największym możliwym stopniu, bez potrzeby adaptacji bądź wyspecjalizowanego projektowania. (Polish)
0 references
The project will be implemented in the form of a public-private partnership concluded between the Opoczno Municipality and the selected private partner (the selection procedure is currently underway). It is planned to include EU funds raised under Measure IV.2.2, which states that this will be so-called. The hybrid project. The project consists of carrying out thermal modernisation works in public buildings located in the Opoczno commune: Kindergartens No. 4, No 5, No. 6, No. 8, Local Government Schools No. 1, No. 2, No. 3, Primary School in Libiszów and in Sielc, School Complex in Ogonowice, OPS in Opoczno. The main objective of the project is to improve the energy efficiency of the buildings indicated. It will be achieved through the achievement of the specific objectives, i.e. an annual reduction in energy demand; optimising electricity consumption; reduction of CO2 emissions; making savings; financing the Project at least in part from the financial savings generated; no impact of the project commitments on sovereign debt and public finance sector deficits; improving the functionality and standard of use of buildings. The final customers will be direct users of modernised facilities, but also, bearing in mind the effect of the project in the form of improving air quality thanks to the reduction of pollutant emissions, all persons staying in the Opoczno commune. As part of the work, among others, it is envisaged. Improvements to: reduction of losses by penetration through building divisions; reduce losses by c.o. and c.w.u. system and exchange of luminaires with LEDs. An additional element will be the installation of energy management systems. When working on the project assumptions, the principles of universal design have been taken into account – all tasks are designed to be accessible to all stakeholders, to the greatest extent possible, without the need for adaptation or specialised design. (English)
17 October 2020
0 references
Le projet sera mis en œuvre sous la forme d’un partenariat public-privé entre la municipalité d’Opoczno et le partenaire privé sélectionné (la procédure de sélection est actuellement en cours). Il est prévu d’inclure dans la mise en œuvre des fonds de l’UE levés dans le cadre de l’action IV.2.2, qui prévoit que cela sera appelé. projet hybride. Le projet consiste à réaliser des travaux de thermomodernisation dans des bâtiments publics situés dans la commune d’Opoczno: Jardins d’enfants no 4, no 5, no 6, no 8, complexe des écoles locales no 1, no 2, no 3, école primaire de Libiszów et Sielce, complexe scolaire d’Ogonowice, OPS à Opoczno. L’objectif principal du projet est d’améliorer l’efficacité énergétique des bâtiments identifiés. Cet objectif sera atteint par la réalisation des objectifs spécifiques, c’est-à-dire la réduction annuelle de la demande d’énergie; optimisation de la consommation d’électricité; réduction des émissions de CO2; l’épargne; financer le projet au moins en partie grâce aux économies financières générées; Aucune incidence du passif du projet sur la dette publique et le déficit du secteur des finances publiques; augmenter la fonctionnalité et le niveau d’utilisation des bâtiments. Les clients finaux seront des utilisateurs directs des installations modernisées, mais aussi, compte tenu de l’effet du projet en termes d’amélioration de la qualité de l’air par la réduction des émissions de polluants, toutes les personnes présentes dans la municipalité d’Opoczno. Les travaux prévoient, entre autres: Améliorations apportées à: réduction des pertes grâce à la pénétration par des cloisonnements de bâtiments; réduction des pertes par les systèmes d’eau centrale et chaude et remplacement des luminaires par des LED. Un autre élément sera l’installation de systèmes de gestion de l’énergie. Les principes de conception universelle ont été pris en compte lors du travail sur le projet — toutes les tâches sont conçues pour être accessibles à toutes les parties prenantes, dans la mesure du possible, sans nécessité d’adaptation ou de conception spécialisée. (French)
1 December 2021
0 references
Identifiers
RPLD.04.02.02-10-0032/17
0 references