RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF PAJCZNO (Q101766)

From EU Knowledge Graph
Revision as of 08:37, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le bénéficiaire (chef de file) du projet est l’unité de l’administration locale — municipalité de Pajczno. Le partenaire du projet est le comté de Spider. L’objectif principal du projet est de: accroître la production d’énergie renouvelable et réduire l’utilisation des sources d’énergie conventionnelles dans la municipalité de Pajaczno et dans le district de Pajaczański, ce qui a permis d’améliorer l’état de l’environnement grâce à la réduction...)
Jump to navigation Jump to search
Project Q101766 in Poland
Language Label Description Also known as
English
RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF PAJCZNO
Project Q101766 in Poland

    Statements

    0 references
    6,963,874.98 zloty
    0 references
    1,671,330.00 Euro
    13 January 2020
    0 references
    8,759,591.17 zloty
    0 references
    2,102,301.88 Euro
    13 January 2020
    0 references
    79.5 percent
    0 references
    1 July 2019
    0 references
    31 December 2020
    0 references
    GMINA PAJĘCZNO
    0 references
    Beneficjentem (Liderem) projektu jest Jednostka Samorządu Terytorialnego – Gmina Pajęczno. Partnerem projektu jest Powiat Pajęczański. Celem głównym projektu jest: zwiększenie produkcji energii ze źródeł odnawialnych i zmniejszenie wykorzystania konwencjonalnych źródeł energii w gminie Pajęczno oraz w powiecie pajęczańskim, skutkujące poprawie stanu środowiska naturalnego w wyniku redukcji emisji zanieczyszczeń do atmosfery. Przedmiotem projektu jest wykonanie instalacji OZE dla budynków mieszkalnych zlokalizowanych w gminy Pajęczno oraz dla budynków użyteczności publicznej zlokalizowanych w gminie Pajęczno. Zakres rzeczowy projektu obejmuje: Instalacja po stronie LIDERA 1. Instalacja fotowoltaiczna PV mocy 6,0 KW, 5,1 KW, 4,2 KW, 3,0 KW oraz 2,1 KW – 304 lokalizacje 2. Kocioł na biomasę o mocy 34 KW, 24 KW, 20 KW, 15 KW, 10 KW – 46 lokalizacji 3. Kolektory słoneczne (zestaw dwóch, trzech i czterech kolektorów słonecznych wraz z zasobnikiem na wodę 200l lub 300l lub 400l) – 163 lokalizacje Instalacja po stronie PARTNERA 1. Instalacja fotowoltaiczna (PV) o mocy 30 KW, 12 KW oraz 4,2 KW na budynkach użyteczności publicznej – 3 lokalizacje W wyniku realizacji niniejszego projektu spadek emisji gazów cieplarnianych nastąpi na poziomie 75,51% czyli 1 867,58 tony równoważnika CO2/rok. Wnioskodawca, jako JST spełnia wymogi kwalifikowalności wynikające z RPO WŁ na lata 2014 – 2020. Przedsięwzięcie jest wykonalne pod względem technicznym; technologie wykonania robót, zastosowane materiały będą ogólnie dostępne i znane, a rozwiązania techniczne będą prawidłowe pod względem funkcjonalnym oraz zgodne z obowiązującymi normami prawnymi. W projekcie zastosowano mechanizmy uwzględniające wszystkich użytkowników zgodnie z koncepcją projektowania uniwersalnego. (Polish)
    0 references
    The beneficiary (leader) of the project is the Local Government Unit – Pajęczno Municipality. The partner of the project is the spider county. The main objective of the project is to: increasing the production of renewable energy sources and reducing the use of conventional energy sources in the municipality of Pajęczno and in the spider county, resulting in improvements in the environment as a result of reducing emissions of pollutants into the atmosphere. The subject of the project is the construction of RES installations for residential buildings located in the municipality of Pajęczno and for public utility buildings located in the commune of Pajęczno. The project’s material scope includes: Installation on the side of LIDERA 1. PV PV installation of 6,0 KW, 5,1 KW, 4.2 KW, 3.0 KW and 2.1 KW – 304 locations 2. Biomass boiler with a capacity of 34 KW, 24 KW, 20 KW, 15 KW, 10 KW – 46 locations 3. Solar collectors (a set of two, three and four solar collectors with a water tank of 200 l or 300 l or 400 l) – 163 locations Installation on the PARTNER 1 side. Photovoltaic installation (PV) with a capacity of 30 KW, 12 KW and 4.2 KW on public utility buildings – 3 locations As a result of this project, the greenhouse gas emissions will decrease at 75.51 % or 1 867.58 tonnes of CO2/year. The applicant, as JST, fulfils the eligibility requirements arising from WŁ ROP for the years 2014-2020. The project is technically feasible; the technologies for the execution of works, the materials used will be generally available and known, and the technical solutions will be functionally correct and comply with applicable legal standards. The project uses mechanisms that take into account all users in accordance with the concept of universal design. (English)
    17 October 2020
    0 references
    Le bénéficiaire (chef de file) du projet est l’unité de l’administration locale — municipalité de Pajczno. Le partenaire du projet est le comté de Spider. L’objectif principal du projet est de: accroître la production d’énergie renouvelable et réduire l’utilisation des sources d’énergie conventionnelles dans la municipalité de Pajaczno et dans le district de Pajaczański, ce qui a permis d’améliorer l’état de l’environnement grâce à la réduction des émissions de polluants dans l’atmosphère. Le projet a pour objet la mise en œuvre d’installations SER pour les bâtiments résidentiels situés dans la municipalité de Pajaczno et pour les bâtiments publics situés dans la municipalité de Pajaczno. Le champ d’application du projet comprend: Installation sur LIDER 1. Installation photovoltaïque Puissance photovoltaïque 6,0 KW, 5,1 KW, 4,2 KW, 3,0 KW et 2,1 KW — 304 emplacements 2. Chaudière à biomasse d’une capacité de 34 KW, 24 KW, 20 KW, 15 KW, 10 KW — 46 emplacements 3. Capteurs solaires (un ensemble de deux, trois et quatre capteurs solaires avec un réservoir d’eau de 200 l ou 300 l ou 400 l) — 163 emplacements Installation sur le côté de partnera 1. Installation photovoltaïque (PV) d’une capacité de 30 KW, 12 KW et 4,2 KW dans les bâtiments publics — 3 emplacements Grâce à la mise en œuvre de ce projet, les émissions de gaz à effet de serre diminueront à 75,51 %, soit 1 867,58 tonnes d’équivalent CO2/an. Le requérant, en tant qu’entreprise commune, satisfait aux conditions d’éligibilité résultant du ROP LEM 2014-2020. Le projet est techniquement réalisable; les technologies de construction, les matériaux utilisés seront accessibles au public et connus, et les solutions techniques seront fonctionnellement correctes et conformes aux normes légales applicables. Le projet utilise des mécanismes qui prennent en compte tous les utilisateurs conformément au concept de conception universelle. (French)
    1 December 2021
    0 references

    Identifiers

    RPLD.04.01.02-10-0065/18
    0 references