EXTENSION OF VOIVODESHIP ROAD NO. 710 – CONSTRUCTION OF A BRIDGE OVER THE RIVER WORTHY IN M. WORTHY (Q101693)

From EU Knowledge Graph
Revision as of 08:28, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’étendue du projet consistant en l’extension de la route provinciale no 710 du km 57+ 900 au km 58 + 950, y compris les infrastructures, comprend: — la démolition et la construction de la route de voïvodie avec le côté, — la construction de trottoirs, — la démolition et la construction d’un pont au-dessus de la rivière Warta, — la construction d’un pont temporaire avec la construction d’une route de détour temporaire pour le temps de démolition...)
Jump to navigation Jump to search
Project Q101693 in Poland
Language Label Description Also known as
English
EXTENSION OF VOIVODESHIP ROAD NO. 710 – CONSTRUCTION OF A BRIDGE OVER THE RIVER WORTHY IN M. WORTHY
Project Q101693 in Poland

    Statements

    0 references
    27,176,232.49 zloty
    0 references
    6,522,295.80 Euro
    13 January 2020
    0 references
    31,972,038.39 zloty
    0 references
    7,673,289.21 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 December 2014
    0 references
    31 December 2018
    0 references
    WOJEWÓDZTWO ŁÓDZKIE
    0 references
    0 references

    51°42'29.5"N, 18°37'30.4"E
    0 references
    Zakres przedmiotowego Projektu polegającego na rozbudowie drogi wojewódzkiej Nr 710 na odcinku od km 57+900 do km 58+950 wraz z infrastrukturą, obejmuje: - rozbiórkę i budowę jezdni drogi wojewódzkiej wraz z poboczami, - budowę chodników, - rozbiórkę i budowę mostu przez rzekę Wartę, - budowę mostu tymczasowego wraz z budową tymczasowej drogi objazdowej na czas rozbiórki i budowy mostu stałego przez rzekę Wartę, - rozbiórkę przepustu i budowę przepustu na rowie R-B z funkcją przejścia dla płazów i małych zwierząt, - budowę przepustu tymczasowego wraz z budową tymczasowej drogi objazdowej na czas robót budowlanych na przepuście stałym, - likwidację (zamulenie) istniejącego przepustu, - rozbiórkę i budowę kanalizacji deszczowej wraz z urządzeniami oczyszczającymi wody opadowe i roztopowe, - rozbiórkę i budowę zjazdów, - umocnienie dna doliny rzeki w rejonie filarów mostu stałego oraz wykonanie opaski brzegowej, - przebudowę sieci teletechnicznej. Realizacja rozbudowy drogi wojewódzkiej spowoduje zdecydowaną poprawę bezpieczeństwa ruchu pieszych i osób niepełnosprawnych poprzez odseparowanie ruchu pieszego od samochodowego (chodniki), oznakowanie pionowe i poziome drogi, bariery energochłonne i balustrady. Wydatki związane z przebudową sieci uzbrojenia terenu kolidującą z inwestycją dla całego Projektu, ujęte są w kategorii kosztów Przebudowa infrastruktury technicznej kolidującej z inwestycją. Celem realizacji Projektu jest: poprawa warunków technicznych, przepustowości i bezpieczeństwa ruchu kołowego (tranzytowego i lokalnego) i pieszego, dostosowanie nośności drogi do wymagań obowiązujących przepisów oraz poprawa warunków ekologicznych. Realizacja inwestycji służyć będzie mieszkańcom, którzy w celach zawodowych lub rekreacyjnych korzystają z niej, jak i osobom, przybywającym spoza regionu w celach turystycznych bądź biznesowych. Użytkownikami drogi są także przewoźnicy, kierowcy zawodowi, przedsiębiorcy, turyści przejeżdżający DW 710. (Polish)
    0 references
    The scope of the project consisting of the extension of the Voivodeship Road No. 710 in the section from km 57+ 900 to km 58+ 950 together with the infrastructure includes: — demolition and construction of the roadway of the voivodeship road, – construction of pavements, – demolition and construction of the bridge over the Warta river, – construction of temporary bridge along with construction of a temporary road for the time of demolition and construction of a permanent bridge over the Warta river, – demolition of the culvert and construction of the culvert on the river R-B with the function of transition for amphibians and small animals, – construction of temporary culverts, construction of the temporary culverting The development of the provincial road will result in a decisive improvement in the safety of pedestrians and people with disabilities by separating pedestrians from motorways (walks), vertical and horizontal signs of roads, energy-intensive barriers and railings. Expenditure related to the reconstruction of the site’s armament network, which conflicts with the investment for the entire Project, is included in the cost category Reconstruction of the technical infrastructure conflicting with the investment. The aim of the project is to: improve the technical conditions, capacity and safety of road traffic (transit and local) and pedestrians, adapt the load capacity of the road to the requirements of existing legislation and improve environmental conditions. The implementation of the investment will serve residents who use it for professional or recreational purposes, as well as those coming from outside the region for tourism or business purposes. The road users are also carriers, professional drivers, entrepreneurs, tourists passing through DW 710. (English)
    17 October 2020
    0 references
    L’étendue du projet consistant en l’extension de la route provinciale no 710 du km 57+ 900 au km 58 + 950, y compris les infrastructures, comprend: — la démolition et la construction de la route de voïvodie avec le côté, — la construction de trottoirs, — la démolition et la construction d’un pont au-dessus de la rivière Warta, — la construction d’un pont temporaire avec la construction d’une route de détour temporaire pour le temps de démolition et la construction du pont permanent sur la rivière Warta, — la démolition du ponceau et la construction d’un ponceau sur le fossé R-B avec la fonction de passage pour les amphibiens et les petits animaux, — construction d’un ponceau temporaire avec construction d’une route itinérante temporaire pour la durée des travaux de construction sur un passage permanent, — l’enlèvement (multipulation) du ponceau existant, — la démolition et la construction des eaux de pluie et des eaux de fonte, — la démolition et la construction de sorties, — le renforcement du fond de la vallée fluviale dans l’aire des piliers du pont permanent et la construction d’une bande côtière, — la reconstruction du réseau télétechnique. Le développement de la route provinciale améliorera considérablement la sécurité des piétons et des personnes handicapées en séparant la circulation piétonne de la circulation automobile (marche), les panneaux verticaux et horizontaux, les barrières et balustrades à forte intensité énergétique. Les dépenses liées à la reconstruction du réseau d’armements du site en conflit avec l’ensemble du projet sont incluses dans la catégorie de coûts Reconstruction des infrastructures techniques en conflit avec l’investissement. L’objectif du projet est de: améliorer les conditions techniques, la capacité et la sécurité du trafic routier (transit et local) et des piétons, adapter la capacité de charge de la route aux exigences de la réglementation en vigueur et améliorer les conditions environnementales. L’investissement sera mis en œuvre pour les résidents qui, à des fins professionnelles ou récréatives, l’utilisent, ainsi que les personnes venant de l’extérieur de la région à des fins touristiques ou commerciales. Les usagers de la route sont également des transporteurs, des conducteurs professionnels, des entrepreneurs, des touristes qui passent DW 710. (French)
    1 December 2021
    0 references

    Identifiers

    RPLD.03.02.01-10-0003/16
    0 references