Support for pupils of the school-pre-school team in Płużnica (Q99709)
Jump to navigation
Jump to search
Project Q99709 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Support for pupils of the school-pre-school team in Płużnica |
Project Q99709 in Poland |
Statements
233,727.89 zloty
0 references
274,973.99 zloty
0 references
85.0 percent
0 references
1 September 2018
0 references
31 October 2019
0 references
GMINA PŁUŻNICA
0 references
Projekt zakłada realizację dodatkowych zajęć w celu podnoszenia kompetencji kluczowych uczniów Zespołu Szkolno-Przedszkolnego w Płużnicy. Powstał on w wyniku reformy, obejmuje m.in.uczniów szkoły podstwowej oraz byłego gimnazjum. Projekt będzie realizowany w terminie od1 IX 2018r. do 31 X 2019r. W projekcie weźmie udział 182BO(94K,82M). Zajęcia prowadzone będą w grupach wiekowych: dla uczniów młodszych, o specjalnych potrzebach eduka., dla ucz. klas IV-VI, klas VII-VIII i dla III gimnazjum. Projekt obejmować będzie: zajęcia typu 1 dla ucz.młodszych i specjalnych potrzebach eduk.(15BO-9K,6M)-specjlistyczne(131h) i wyrównawcze(60h) oraz dla pozostałych BO typ1:zajęcia dyd.-wyr. dla 48BO(24K,24M)270h, w tym zajęcia z jęz. obcych, przyrod.,matemat., programowania; koła zainteresowań 48BO(24K,24M)-270h w zakresie progrmowania, jęz. obcychoraz przyrod.-matem. Dodatkowo obejmą one obóz letni (5dni) dla 20BO(10K,10M). 96BO(48K,48M) zostanie objętych zajęciami rozwijającymi kompetencje społeczne, w ramach których prowadzone będą zajęcia z pracy zespołowej i technik uczenia się(200h). Zajęcia będą odbywały się w szkole i poza szkołą. Poznawanie treści niedostępnych do osiągnięcia w warunkach szkolnych będzie realizowane w laboratoriach lub centrach nauki. Zaplanowano wyjazdy edukacyjne(96BO). Nauczyciele otrzymają zakupione w ramach projektu pom.dyd. i sprzęt, co wpłynie na podniesienie jakości i atrakcyjności zajęć. W ramach projektu przeszkolonych zostanie 2 nauczycieli do obsługi sprzętu i realizacji zajęć z biofeedbacku.Zaplanowane różnorodne zajęcia i wyjazdy przyczyniają się do wyrównywania szans edukacyjnych dzieci wiejskich. Bez dodatkowego wsparcia z UE zaplanowanych działań nie można by było zrealizować. Wartość projektu to kwota: 274 973,99 zł, w tym kwota dofinansowania ze UE 233727,89 zł, BP 27497,40. Wkład własny Gm. Płużnica w wys. 13748,70 zł. (Polish)
0 references
The project envisages the implementation of additional activities in order to raise the competences of key students of the School-Preschool Team in Płużnica. It was created as a result of the reform, including students from the school and the former junior high school. The project will be implemented from 1 IX 2018 to 31 X 2019. 182BO(94K,82M) will participate in the project. Classes will be conducted in age groups: for junior pupils, with special needs of educa., for students of classes IV-VI, VII-VIII and III middle school. The project will include: type 1 classes for pupils and special needs of education.(15BO-9K,6M)-specialistic(131h) and compensatory(60h) and other BO type1 classes: teaching activities for 48BO(24K,24M)270h, including classes in foreign languages, nature, math, programming; wheels of interest 48BO(24K,24M)-270h in the scope of progerm, foreign language and nature.-matem. In addition, they will include summer camp (5 days) for 20BO(10K,10M). 96BO(48K,48M) will be included in classes developing social competences for teamwork and learning techniques(200h). Classes will be held at school and outside school. Learning content that is not available in school conditions will be carried out in laboratories or science centres. Educational trips (96BO) are planned. Teachers will receive the pom.dyd. and equipment purchased as part of the project, which will improve the quality and attractiveness of the classes. As part of the project, 2 teachers will be trained to handle equipment and implement biofeedback classes.The planned various activities and trips contribute to equalising educational opportunities for rural children. Without additional EU support, the planned actions could not be implemented. The value of the project is the amount of: PLN 274 973.99, including the amount of co-financing from the EU 233727.89 PLN, BP 27497.40. Own contribution of Gm. Płużnica w l. 13748,70 zlotys. (English)
17 October 2020
0 references
Le projet prévoit la mise en œuvre d’activités supplémentaires afin d’améliorer les compétences des élèves clés de l’équipe scolaire et préscolaire de Płużnica. Il a été créé à la suite de la réforme, y compris des élèves de l’école secondaire et de l’ancienne école secondaire. Le projet sera mis en œuvre du 1er septembre 2018 au 31 X 2019. 182BO(94K,82M) participera au projet. Les classes seront organisées dans les groupes d’âge suivants: pour les élèves de premier cycle ayant des besoins particuliers d’éducien., pour les classes IV-VI, VII-VIII et pour le troisième collège. Le projet comprendra: classes de type 1 pour les étudiants plus jeunes et besoins spéciaux de l’éducation.(15BO-9K,6M)-spécialiste(131h) et égalisation(60h) et pour d’autres BO typ1:zajęcia enseignement pour 48BO(24K,24M)270h, y compris les cours en langues étrangères, nature, mathématiques, programmation; cercles d’intérêt 48BO(24K,24M)-270h dans le domaine de la progring, étranger et nature-mat. De plus, ils comprendront un camp d’été (5 jours) pour 20BO (10K,10M). 96BO(48K,48M) seront inclus dans les activités de développement des compétences sociales, qui comprendront le travail d’équipe et les techniques d’apprentissage (200h). Les cours auront lieu à l’école et à l’extérieur de l’école. L’apprentissage du contenu non disponible dans les conditions scolaires sera effectué dans des laboratoires ou des centres d’apprentissage. Des voyages éducatifs sont prévus (96BO). Les enseignants seront achetés dans le cadre du projet Pom.dyd. et de l’équipement, ce qui améliorera la qualité et l’attractivité des classes. Dans le cadre du projet, 2 enseignants seront formés à l’exploitation de l’équipement et à la mise en œuvre de cours de biofeedback. Sans un soutien supplémentaire de l’UE, les actions prévues ne pourraient pas être mises en œuvre. La valeur du projet est la quantité de: 274 973,99 PLN, y compris le montant du cofinancement de l’UE PLN 233727,89, BP 27497,40. Contribution propre de la municipalité. 13748.70 PLN. (French)
1 December 2021
0 references
Identifiers
RPKP.10.02.02-04-0029/17
0 references