Completion of Glina Cleaning Station, rehabilitation of the main sewer collectors and the Dâmbovița collector channel (Case) in Bucharest-Stage II Municipality (Q3095724)

From EU Knowledge Graph
Revision as of 07:45, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Allgemeines Ziel des Projekts ist es, die Infrastruktur im Abwassersektor in Bukarest weiter zu verbessern, um den Verpflichtungen zur Erfüllung der zwischen der Europäischen Kommission und der rumänischen Regierung vereinbarten Übergangsbestimmungen und den zwischen der Europäischen Kommission und der rumänischen Regierung vereinbarten Zwischenzielen für die Umsetzung der EG-Richtlinie 91/271 über die Sammlung und Behandlung von kommunalem Abwa...)
Jump to navigation Jump to search
Project Q3095724 in Romania
Language Label Description Also known as
English
Completion of Glina Cleaning Station, rehabilitation of the main sewer collectors and the Dâmbovița collector channel (Case) in Bucharest-Stage II Municipality
Project Q3095724 in Romania

    Statements

    0 references
    874,695,929.3 Romanian Leu
    0 references
    174,939,185.86 Euro
    13 September 2021
    0 references
    1,029,054,034.0 Romanian Leu
    0 references
    205,810,806.8 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    MUNICIPIUL BUCUREŞTI/UIP GLINA 2
    0 references
    0 references
    0 references

    44°26'10.10"N, 26°6'9.79"E
    0 references
    Proiectul are ca obiectiv general continuarea îmbunătățirii infrastructurii în sectorul de apă uzată din Municipiul București în vederea îndeplinirii obligațiilor de conformare cu angajamentele de tranziție și cu obiectivele intermediare convenite între Comisia Europeană și Guvernul României, pentru implementarea Directivei 91/271 a CE cu privire la colectarea și tratarea apelor uzate urbane (transpusă în legislația națională prin Hotărarea 352/2005, referitoare la tratarea apei uzate urbane). Contributia Proiectului la atingerea obiectivelor POIM este: - 2S29 SEAU peste 10,000 p.e.conforme cu Directiva 91/271/CEE – 1 buc; - 2S31 Nivel de conectare la sistemul de colectare (p.e.) pentru aglomerari peste 10,000 p.e. – 10,43 %, procent calculat ca raport intre capacitatea aditionala rezultata din extinderea SEAU Glina (1.553.000 PE) si capacitatea aferenta aglomerarilor cu PE mai mare 10000 LE la nivel de tara - 14.882.018 LE, conform ANAR (Romanian)
    0 references
    The general objective of the project is to continue improving infrastructure in the waste water sector in Bucharest in order to fulfil the obligations to comply with the transition commitments and the intermediate targets agreed between the European Commission and the Romanian Government for the implementation of EC Directive 91/271 on urban waste water collection and treatment (transposed into national legislation by Decision 352/2005 on urban waste water treatment). The project’s contribution to achieving LIOP objectives is: — 2S29 SEAU over 10,000 p.e. conforming to Directive 91/271/EEC – 1 pcs; — 2S31 Connection level to the collection system (p.e.) for agglomerations over 10,000 p.e. – 10.43 %, calculated as a ratio between the additional capacity resulting from the expansion of SEAU Glina (1.553.000 PE) and the capacity for agglomerations with more than 10000 LE at country level – 14.882.018 LE, according to ANAR (English)
    16 September 2021
    0 references
    Proiectul are ca obiectiv general continuarea îmbunătățirii Infrastructurii în sectorul de apă uzată din Municipiul București în vederea îndeplinirii obligațiilor de conformare cu angajamentele de tranziție și cu obiectivele intermediare convenite între Comisia Europeană și Guvernul României, pentru implementationarea Directivei 91/271 a CE cu privire la colectarea și tratarea apelor uzate urbane (transpusă în legislația națională prin Hotărarea 352/2005, referitoare la tratarea apei uzate urbane). Contributia proiectului la atingerea obiectivelor POIM este: — 2S29 SEAU peste 10,000 p.e.conforme cu Directiva 91/271/CEE — 1 buc; — 2S31 Nivel de conectare la sistemul de Colectare (p.e.) pentru aglomerari peste 10 000 EH — 10,43 %, calcul procentat ca raport intre capacitatea aditionala rezultata din extinderea SEAU Glina (1.553.000 PE) si capacitatea aferenta aglomerarilor cu PE mai mare 10000 LE la nivel de tara — 14.882.018 LE, conforme ANAR (French)
    26 November 2021
    0 references
    Allgemeines Ziel des Projekts ist es, die Infrastruktur im Abwassersektor in Bukarest weiter zu verbessern, um den Verpflichtungen zur Erfüllung der zwischen der Europäischen Kommission und der rumänischen Regierung vereinbarten Übergangsbestimmungen und den zwischen der Europäischen Kommission und der rumänischen Regierung vereinbarten Zwischenzielen für die Umsetzung der EG-Richtlinie 91/271 über die Sammlung und Behandlung von kommunalem Abwasser nachzukommen (durch den Beschluss Nr. 352/2005 über die Behandlung von kommunalem Abwasser in nationales Recht umgesetzt). Der Beitrag des Projekts zur Erreichung der LIOP-Ziele ist: — 2S29 SEAU über 10.000 EW gemäß der Richtlinie 91/271/EWG – 1 Stück; — 2S31 Anschlusshöhe an das Sammelsystem (p. h.) für Ballungsräume über 10.000 EW – 10,43 %, berechnet als Verhältnis zwischen der zusätzlichen Kapazität, die sich aus der Erweiterung von SEAU Glina (1.553.000 PE) und der Kapazität für Ballungsräume mit mehr als 10000 LE auf Länderebene ergibt – 14.882.018 LE, nach ANAR (German)
    1 December 2021
    0 references
    Municipiul Bucureşti, Romania
    0 references

    Identifiers

    102050
    0 references