Conversion (modernisation) of waste water treatment plants together with the construction of technical buildings into parts of the plot no. 844/17 in Unisław, Municipality of Unisław. (Q98448)

From EU Knowledge Graph
Revision as of 07:06, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet comprend une modernisation et une reconstruction globales de la station d’épuration des eaux usées ainsi que la construction de bâtiments techniques dans la municipalité d’Unisław (parc. 844/17, zone 0009, unité cadastrale d’Unisław). L’objectif de l’investissement est d’augmenter la part de la population bénéficiant d’un système de traitement des eaux usées conformément à la directive relative aux eaux urbaines résiduaires. Les techno...)
Jump to navigation Jump to search
Project Q98448 in Poland
Language Label Description Also known as
English
Conversion (modernisation) of waste water treatment plants together with the construction of technical buildings into parts of the plot no. 844/17 in Unisław, Municipality of Unisław.
Project Q98448 in Poland

    Statements

    0 references
    3,611,565.0 zloty
    0 references
    866,775.6 Euro
    13 January 2020
    0 references
    4,248,900.0 zloty
    0 references
    1,019,736.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 February 2018
    0 references
    31 October 2021
    0 references
    GMINA UNISŁAW
    0 references
    Q2520035 (Deleted Item)
    0 references
    Projekt zakłada kompleksową modernizację i przebudowę oczyszczalni ścieków wraz z budową budynków technicznych na terenie Gminy Unisław (działka nr 844/17,obręb 0009, jednostka ewidencyjna Unisław) . Celem inwestycji jest zwiększenie odsetka ludności korzystającej z systemu oczyszczania ścieków, zgodnego z dyrektywą dotyczącą ścieków komunalnych. Stosowane obecnie w oczyszczalni technologie negatywnie wpływają na stan powietrza atmosferycznego oraz uniemożliwiają doprowadzanie ścieków komunalnych do stanu i składu umożliwiającego ich wprowadzenie do środowiska, zgodnie z obowiązującymi przepisami. Zakres projektu obejmuje wykonanie nowej pompowni ścieków surowych, wykonanie nowych komór osadu czynnego, wykonanie nowego osadnika wtórnego, wykonanie nowego budynku technicznego, w którym ulokowana zostanie stacja dmuchaw, stacja odwadniania osadu, pompy operacyjne, część elektroenergetyczna), wykonanie przewodów technologicznych, wodnych, elektroenergetycznych, sterowniczych oraz uzupełnienie istniejącego układu drogowego.W wyniku realizacji projektu nastąpi poprawa wydajności oczyszczalni ścieków, podniesienie standardów w zakresie oczyszczania ścieków (zgodnie z wymogami prawa wodnego) oraz zwiększenie ilości osób korzystających z oczyszczania ścieków zgodnego z wymogami. Pozytywny wpływ zostanie odnotowany również w zakresie poprawy stanu powietrza atmosferycznego. (Polish)
    0 references
    The project involves a comprehensive modernisation and reconstruction of the sewage treatment plant together with the construction of technical buildings in the Municipality of Unisław (Division No. 844/17, part 0009, Unisław registration unit). The objective of the investment is to increase the proportion of the population using a waste water treatment system in line with the Urban Waste Water Directive. The technologies currently used in the treatment plant have a negative impact on the state of the air and prevent urban waste water from being brought into the environment in accordance with applicable regulations. The scope of the project includes the execution of a new raw sewage pumping plant, the construction of new sludge chambers, the implementation of a new secondary settler, the construction of a new technical building in which the blower station will be located, the sludge drainage station, the operating pumps, the power part, the construction of the technological, water, power and control lines and the addition of the existing road system. Positive impacts will also be noted in terms of improving atmospheric air. (English)
    15 October 2020
    0 references
    Le projet comprend une modernisation et une reconstruction globales de la station d’épuration des eaux usées ainsi que la construction de bâtiments techniques dans la municipalité d’Unisław (parc. 844/17, zone 0009, unité cadastrale d’Unisław). L’objectif de l’investissement est d’augmenter la part de la population bénéficiant d’un système de traitement des eaux usées conformément à la directive relative aux eaux urbaines résiduaires. Les technologies actuelles de la station d’épuration ont un impact négatif sur l’état de l’air atmosphérique et empêchent le rejet d’eaux urbaines résiduaires dans l’environnement, conformément à la réglementation en vigueur. La portée du projet comprend la construction d’une nouvelle station de pompage d’eaux usées brutes, la construction de nouvelles chambres à boues activées, la construction d’une nouvelle station de traitement des boues secondaires, la construction d’un nouveau bâtiment technique dans lequel se trouvent une station de ventilateur, une station d’assèchement des boues, une pompe de fonctionnement, une section d’énergie électrique, la construction de lignes technologiques, d’eau, d’électricité et de contrôle ainsi que l’achèvement du réseau routier existant. L’efficacité de la station d’épuration des eaux usées sera améliorée, les normes de traitement des eaux usées (conformément aux exigences de la loi sur l’eau) seront améliorées et le nombre de personnes utilisant le traitement des eaux usées conformément aux exigences sera augmenté. Des effets positifs seront également notés en termes d’amélioration de l’air atmosphérique. (French)
    1 December 2021
    0 references

    Identifiers

    RPKP.04.03.00-04-0007/18
    0 references