Construction of a pressing sanitary collector from the Gostycyn commune to the sewage system of the City and Tuchola commune implemented in two stages (Q98438)

From EU Knowledge Graph
Revision as of 07:06, 1 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q98438 in Poland
Language Label Description Also known as
English
Construction of a pressing sanitary collector from the Gostycyn commune to the sewage system of the City and Tuchola commune implemented in two stages
Project Q98438 in Poland

    Statements

    0 references
    2,133,024.82 zloty
    0 references
    511,925.96 Euro
    13 January 2020
    0 references
    2,509,440.97 zloty
    0 references
    602,265.83 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 August 2015
    0 references
    31 December 2016
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWO-HANDLOWE "KAMIONKA" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Przedmiotowy projekt to inwestycja liniowa polegająca na budowie kanalizacji sanitarnej tłocznej zlewni oczyszczalni ścieków w Gostycynie z przechwyceniem po drodze przewodu tłocznego (Gostycyn – Tuchola) ścieków z istniejącej przepompowni ścieków w Łyskowie. Łączna długość sieci, jaka powstanie wramach projektu to 13 km. Kolektor tłoczny przebiegać będzie od centralnej przepompowni ścieków, zlokalizowanej na terenie przewidzianej do likwidacji oczyszczalni w Gostycynie do kolektora sanitarnego w Tucholi, przebiegającego na południowym skraju miasta, po północno - wschodniej stronie rzeki Kicz, w kierunku komunalnej oczyszczalni ścieków. Na odcinku od Gostycyna do Łyskowa trasę kolektora wytyczono wzdłuż prawej strony drogi wojewódzkiej. Kolektor sanitarny na trasie z Łyskowa do granicy administracyjnej miasta Tuchola przebiegać będzie od miejsca lokalizacji istniejącej przepompowni ścieków w Łyskowie, w pasie dróg gminnych i dróg leśnych do ul. Wańkowicza w Tucholi i następnie po przejściu syfonem pod korytem rzeki Kicz zostanie podłączony do kolektora sanitarnego. Projektowana sieć kanalizacyjna wykorzystana zostanie w celu polepszenia warunków socjalno-bytowych oraz umożliwi częściową lub całkowitą likwidację oczyszczalni ścieków w Gostycynie. W ramach zadania zostanie zlikwidowana część biologicznej oczyszczalni ścieków. W celu umożliwienia dostarczenia ścieków dowożonych z nieskanalizowanych zagród gospodarskich oraz oddzielenia piasku z części ogólnospławnej w miejscowości Gostycyn zachowana zostanie część mechaniczna oczyszczalni, poprzez pozostawienie punktu zlewnego oraz piaskownika do czasu całkowitego wyeliminowania dopływu ścieków ogólnospławnych. Na terenie oczyszczalni zaprojektowano również pozostawienie jednego rowu biologicznego i zaadaptowanie go jako czasowy zbiornik ścieków w wypadku awarii kolektora tłocznego do oczyszczalni ścieków w Tucholi. Zbiornik ten będzie wykorzystywany tylko na okres usunięcia awarii. (Polish)
    0 references
    This project is a linear investment consisting of the construction of sanitary sewage drainage system of the sewage treatment plant in Gostycin with interception of discharge pipes (Gosticin – Tuchola) of sewage from the existing sewage pumping plant in Łysków. The total length of the network that will be created within the project is 13 km. The exhaust manifold will run from the central sewage pumping plant, located in the area planned to liquidate the treatment plant in Gostycin to the sanitary manifold in Tuchola, running on the southern edge of the city, on the north-eastern side of the river Kicz, towards the municipal sewage treatment plant. On the section from Gostycin to Łysków the collector route was marked along the right side of the provincial road. The sanitary collector on the route from Łysków to the administrative border of the town of Tuchola will run from the location of the existing sewage pumping plant in Łysków, in the zone of municipal roads and forest roads to ul. Wańkowicza in Tuchola and then after passing by siphon under the river Kicz river will be connected to the sanitary manifold. The designed sewerage network will be used to improve social and domestic conditions and will allow partial or complete decommissioning of the waste water treatment plant in Gostycin. Part of the biological waste water treatment plant will be eliminated as part of the task. In order to allow the delivery of sewage from unscanised farmsteads and the separation of sand from the general part of Gostycin, the mechanical part of the treatment plant will be preserved, by leaving the catchment point and sandstone until the total drainage supply is eliminated. The treatment plant also designed to leave one biological ditch and adapt it as a temporary waste water tank in the event of a failure of the pressure manifold for the sewage treatment plant in Tuchola. This tank will only be used for the period of removal of the failure. (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.04.03.00-04-0003/16