4,042,814.61 zloty
0 references
5,775,449.45 zloty
0 references
70.0 percent
0 references
1 April 2018
0 references
30 September 2019
0 references
GMINA LUBICZ
0 references
Konieczność realizacji projektu wynika z faktu, iż obecnie budynek szkolny nie jest dostatecznie ocieplony. Brak izolacji budynku o odpowiednich parametrach powoduje znaczne straty energii cieplnej. Problemem wynikającym z tego faktu dla gminy jest nadmierna strata energii cieplnej powodująca zanieczyszczanie środowiska oraz ponoszenie znacznych nakładów finansowych na ogrzewanie budynku ZS nr 1 w Lubiczu Górnym. Budynek Zespołu Szkół w Lubiczu Górnym zbudowany został w 1997 roku, w technologii tradycyjnej - z cegły żerańskiej. Budynek zajmuje powierzchnię 3994 m2, ma 4 kondygnacje i 10 292m2 powierzchni użytkowej ogrzewanej. W budynku znajduje się 105 pomieszczeń, z których korzysta łącznie 1050 użytkowników. Budynek podłączony jest do sieci ciepłowniczej.Obiekt składa się z czterech segmentów oznaczonych A, B, C oraz segmentu sali gimnastycznej z łącznikiem. Segmenty A, B i C posiadają 3 kondygnacje użytkowe, pełne podpiwniczenie oraz poddasze nieużytkowe. Sala gimnastyczna jest obiektem parterowym, niepodpiwniczonym. Łącznik sali gimnastycznej jest budynkiem parterowym z poddaszem użytkowym i częściowym podpiwniczeniem. Ściany osłonowe wykonane z cegły pełnej gr. 37cm i 8 cm styropianu, stropy z płyt kanałowych, stropodach niewentylowany z płyt kanałowych (izolacja z żużla 10cm) pokryty papą asfaltową. Stropy międzypiętrowe – ceramiczne. Dachy budynków izolowane są papą termozgrzewalną i wełną mineralną 12 - 20 cm. Ściany zewnętrzne, stropy, część fundamentów, dachy i stolarka okienna powinny uzyskać większą izolacyjność cieplną bądź zostać wymienione na nowe o odpowiednich parametrach, gdyż utrzymanie stanu obecnego powoduje i powodować będzie w przyszłości znaczne straty energii. Wymiany źródła ciepła, instalacji c.o., instalacji ciepłej wody użytkowej i wentylacji nie będzie wchodziła w zakres przedmiotowego projektu. Polegać on będzie na dociepleniu budynku oraz wymianie oświetlenia na energooszczędne (bez wymiany instalacji elektrycznej oraz montażu OZE). (Polish)
0 references
The need for the project is due to the fact that the school building is currently not sufficiently warmed. The lack of insulation of a building with appropriate parameters causes significant thermal energy losses. The problem resulting from this fact for the municipality is the excessive loss of heat energy resulting in pollution and significant financial outlays on heating of ZS building No. 1 in Lubicz Górny. The building of the School Complex in Lubicz Górny was built in 1997, in traditional technology – made of prey brick. The building occupies an area of 3994 m², has 4 floors and 10292 m² of heated floor space. The building has 105 rooms with a total of 1050 users. The building is connected to the heating network.The object consists of four segments marked A, B, C and a segment of the gym with a connector. Segments A, B and C have 3 useful floors, full cellar and unused attic. The gym is a ground-floor object, not cellared. The gymnasium connector is a ground-floor building with a utility loft and a partial cellar. Curtain walls made of full brick 37 cm and 8 cm of Styrofoam, ceilings made of duct panels, stropods not ventilated from duct plates (slag insulation 10 cm) covered with asphalt papa. Floor ceilings – ceramic. The roofs of the buildings are insulated with heat-heated papa and mineral wool 12-20 cm. External walls, ceilings, part of the foundations, roofs and window carpentry should achieve greater thermal insulation or be replaced with new ones with appropriate parameters, as maintaining the current state will cause and will result in significant energy losses in the future. The exchange of heat source, central heating system, hot water installation and ventilation will not fall within the scope of the project. It will consist of warming the building and replacing lighting with energy-efficient (without replacing electrical installations and RES installation). (English)
15 October 2020
0 references
La nécessité de mettre en œuvre le projet est due au fait que le bâtiment scolaire n’est actuellement pas suffisamment isolé. Le manque d’isolation d’un bâtiment avec des paramètres appropriés entraîne des pertes importantes d’énergie thermique. Le problème qui en résulte pour la municipalité est la perte excessive d’énergie thermique qui entraîne une pollution de l’environnement et des dépenses financières importantes pour le chauffage du bâtiment ZS no 1 à Lubicz Górny. Le bâtiment du complexe scolaire de Lubicz Górny a été construit en 1997, en utilisant la technologie traditionnelle — en brique de fer. Le bâtiment couvre une superficie de 3 994 m², a 4 étages et 10 292 m² de surface utile chauffée. Le bâtiment dispose de 105 chambres avec un total de 1050 utilisateurs. Le bâtiment est relié au réseau de chauffage urbain.L’objet se compose de quatre segments marqués A, B, C et un segment de la salle de gym avec un connecteur. Les segments A, B et C ont 3 étages, sous-sol complet et grenier. La salle de sport est un objet au rez-de-chaussée, pas un sous-sol. La connexion de la salle de sport est un bâtiment au rez-de-chaussée avec un grenier utilitaire et un sous-sol partiel. Murs rideaux en brique pleine g. 37 cm et 8 cm de mousse, plafond en dalles de canal, panneaux de gaine non ventilés (isolation du laitier 10 cm) recouverts de pâte d’asphalte. Plafonds interplanchers — céramique. Les toits des bâtiments sont isolés avec étanchéité thermique et laine minérale 12-20 cm. Les murs extérieurs, les plafonds, une partie des fondations, les toits et les menuiseries de fenêtres devraient être plus isolants thermiques ou être remplacés par de nouveaux paramètres appropriés, car le maintien de l’état actuel causera des pertes d’énergie importantes à l’avenir. L’échange de sources de chaleur, l’installation de chauffage central, l’installation d’eau chaude domestique et la ventilation ne relèveront pas du projet. Il consistera à chauffer le bâtiment et à remplacer l’éclairage par un rendement énergétique (sans remplacement des installations électriques et installation de SER). (French)
1 December 2021
0 references
Identifiers
RPKP.03.05.01-04-0051/17
0 references