“Support of R & D processes in ASAP SOLUTION Sp. z o.o. through the purchase of R & D infrastructure and scientific and research equipment to introduce new products and services to the Company’s offer” (Q97868)
Jump to navigation
Jump to search
Project Q97868 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | “Support of R & D processes in ASAP SOLUTION Sp. z o.o. through the purchase of R & D infrastructure and scientific and research equipment to introduce new products and services to the Company’s offer” |
Project Q97868 in Poland |
Statements
1,415,150.0 zloty
0 references
2,573,000.0 zloty
0 references
55.0 percent
0 references
1 September 2017
0 references
30 September 2018
0 references
ASAP SOLUTION SP. Z O.O.
0 references
Zamierzenie Firmy polega na zakupie: 1)infrastruktury B+R tj. urządzeń oraz sprzętu do prowadzenia prac badawczych i doświadczalnych w warunkach rzeczywistych; 2)aparatury naukowo-badawczej stanowiącej wyposażenie laboratorium do prowadzenia prac badawczych i doświadczalnych,które to urządzenia oraz aparatura zostały szczegółowo określone w zał.nr 5 do Wn. o dofin.Przedmiotem projektu jest stworzenie zaplecza B+R w celu prowadz. prac B+R (określ.w Agendzie),których efektem będzie przebadanie i opracowanie precyzyjnej technologii gięcia rur wysokociśnieniowych wraz z ich spawaniem oraz badaniem w zakresie powstawania mikropęknięć na skutek gięcia rur. Ww. technologia pozwoli na wdrożenie 3 znacząco udoskonal./nowych produktów/usług wytworzonych w wyników tych prac.Produkty/usługi będą oparte na nowych/zasadniczo zmienionych rozwiązaniach procesowych wynikających z zastosowania udoskonalonych technologii gięcia i spawania rur.Prowadzenie ww. prac B+R będzie polegało na przebadaniu i przetestowaniu przedmiotowej technologii na wielu płaszczyznach badawczych (wskazanych w Agendzie), zarówno w środowisku tzw. laboratoryjnym (na zakupionym w ramach projektu aparaturze badawczo-naukowej) jak również rzeczywistym (na zakupionej w ramach projektu infrastrukturze B+R), w celu jej zastosowania w półproduktach stanowiących elementy składowe instalacji wysokociśnieniowych m.in.do schładzania. Efektem prac B+R będą następujące nowe i znacząco udoskonalone produkty/usługi: produkt nr1):wygięta rura pozbawiona spawów lub z minimalną ilością spawów, przebadana rentgenem przez co Spółka będzie mogła wydać atest na całościowo wygiętą rurę jako gotowy półprodukt do budowy urządzeń wysokociśnieniowych;produkt/usługa nr 2)precyzyjne spawanie zbiorników wysokociśnieniowy; produkt/usługa nr3):badanie rentgenem zagiętych rur w zakresie powstawania mikropęknięć na skutek gięcia.Rozpoczęcie reali. projektu będzie miało miejsce od 01.09.2017 r.,natomiast zakończenie nastąpi do 30.06.2018 r. (Polish)
0 references
The Company’s intention is to purchase: 1) R & D infrastructure, i.e. equipment and equipment for conducting research and experimental work under real conditions; 2)Scientific and research equipment, which is a laboratory equipment for conducting research and experimental works, which are the devices and apparatus that are detailed in Annex 5 to WN. o dofin.The object of the project is to create a R & D facility in order to conduct R & D works (specified in the Agenda), which will result in testing and development of precise technology of bending high pressure pipes together with their welding and testing in the scope of the formation of micro-pressure pipes. The above-mentioned technology will allow the implementation of 3 significantly improved/new products/services produced in the results of these works.Products/services will be based on new/essentially altered process solutions resulting from the application of improved bending and welding technologies. R & D will result in the following new and significantly improved products/services: product no.1): bent pipe without welds or with a minimum number of welds, tested with x-rays, so the Company will be able to issue an attestation on the whole bent pipe as a finished semi-finished product for the construction of high pressure equipment; product/service No. 2)Precision welding of high pressure vessels; product/service No.3): X-ray of curved pipes in the scope of micro-fracture formation as a result of bending.The project will start from 01.09.2017, whereas the completion will take place by 30.06.2018. (English)
15 October 2020
0 references
L’intention de la Société est d’acheter: 1)Infrastructures de R & D, c’est-à-dire équipements et équipements pour la réalisation de travaux de recherche et d’expérimentation dans des conditions réelles; 2) Matériel scientifique et de recherche, qui est l’équipement du laboratoire pour la réalisation de travaux de recherche et d’expérimentation, qui sont spécifiés en détail dans l’annexe no 5 de l’ordre du jour sur les dofines. Le projet a pour objet de créer des installations de R & D en vue d’effectuer des travaux de R & D (tels que définis dans l’Agenda), ce qui permettra de tester et de mettre au point une technique de cintrage précise pour les tuyaux à haute pression ainsi que le soudage et les essais sur la formation de microfissures à la suite du pliage des tuyaux. Cette technologie permettra la mise en œuvre de 3 améliorations significatives./nouveaux produits/services produits dans les résultats de ces travaux. Les produits/services seront basés sur des solutions de processus nouvelles/substantiellement modifiées résultant de l’application de technologies améliorées de cintrage et de soudage des tuyaux. La réalisation des travaux de R & D susmentionnés consistera à tester et à tester la technologie en question à plusieurs niveaux de recherche (comme indiqué dans l’Agenda), tant dans l’environnement de laboratoire (sur les équipements de recherche et scientifiques achetés dans le cadre du projet) que réels (sur l’infrastructure de R & D achetée dans le cadre du projet), afin de l’appliquer aux semi-produits constituant des composants à haute pression. Les travaux de R & D se traduiront par les produits et services nouveaux et considérablement améliorés suivants: produit no 1): tuyau plié sans soudures ou avec un nombre minimal de soudures, testé à l’aide d’une radiographie, afin que l’entreprise puisse délivrer une attestation sur l’ensemble du tuyau plié en tant qu’intermédiaire prêt pour la construction d’équipements à haute pression; produit/service no 2) soudage précis des réservoirs à haute pression; produit/service n°3): examen par rayons X des tuyaux pliés dans le domaine de la microcraquage en raison de la flexion.Le projet débutera à partir du 01.09.2017, tandis que l’achèvement aura lieu d’ici le 30.06.2018. (French)
1 December 2021
0 references
Identifiers
RPKP.01.02.01-04-0044/17
0 references