Reconstruction and expansion of the building at ul. Quiet 4 in Novgorodec with the development of the site for the establishment of the Social Assistance Centre and the Department of Rehabilitation of the Medicines (Q96011)

From EU Knowledge Graph
Revision as of 06:29, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet consistera en la reconstruction et l’agrandissement du bâtiment existant de l’ancien hôpital St. Jozef à N-cu à ul. Silencieux 4 dans Nowogrodziec (loi No 493/2 r.4 Nowogrodziec) pour adapter l’objet aux nouvelles fonctions. Grâce aux mesures prises, le bâtiment doit créer trois institutions indépendantes (organisationnellement, fonctionnellement et spatialement) indépendantes liées à la prestation de services sociaux aux résidents. Il...)
Jump to navigation Jump to search
Project Q96011 in Poland
Language Label Description Also known as
English
Reconstruction and expansion of the building at ul. Quiet 4 in Novgorodec with the development of the site for the establishment of the Social Assistance Centre and the Department of Rehabilitation of the Medicines
Project Q96011 in Poland

    Statements

    0 references
    1,177,598.51 zloty
    0 references
    282,623.64 Euro
    13 January 2020
    0 references
    1,385,410.01 zloty
    0 references
    332,498.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 December 2016
    0 references
    31 October 2019
    0 references
    GMINA NOWOGRODZIEC
    0 references
    0 references
    Projekt będzie polegał na przebudowie i rozbudowie istn. obiektu dawnego Szpitala św. Józefa w N-cu przy ul. Cichej 4 w Nowogrodźcu (dz. nr 493/2 obr.4 Nowogrodziec) w celu przystosowania obiektu do nowych funkcji. W wyniku podjętych działań w budynku mają powstać 3 niezależne od siebie (organizacyjnie, funkcjonalnie i przestrzennie) placówki związane ze świadczeniem usług społecznych dla mieszkańców. Będą to: Dom Pomocy Społecznej dla osób starszych (zarząd MGOPS), Dom Opieki Specjalistycznej(zarząd SPZOZ), Zakład Rehabilitacji Leczniczej(zarząd PZOZ). Przedmiotem niniejszego projektu jest utworzenie i wyposażenie Domu Pomocy Społecznej położonego na parterze, I i II piętrze w płn-wsch. cz. budynku oraz Zakładu Rehabilitacji Leczniczej położony na parterze w płd-wsch. cz. budynku. Powierzchnia użytkowa całego budynku wynosi 2072,59 m2 (DPS: 468,97 m2, ZRL: 152,84 m2, DOS: 602,50 m2, części wspólne 848,28 m2). Koszty kwalifikowane części wspólnych oraz zagospodarowania (zieleń i dr. archtekt.) wyliczono w oparciu wskaźnik powierzchni użytkowej poszczególnych placówek (zgodnie z załączoną do wniosku metodologią). Koszty utworzenia i wyposażenia ZRL wraz z jego cz. wsp. oraz część zakresu zagosp. terenu i całość podatku VAT są w projekcie niekwalifikowane. Utworz. i wyposaż. DOS jest przedmiotem odrębnego wniosku o dofinansowanie. W ramach działań projektowych przewidziano: • przygot. dokument. projekt., • wykon. prac w ramach modernizacji budynku(cz. budowlana) wraz z zagosp. terenu, • wykon. prac instalacyjnych (elektr. i sanit.), • działania w zakresie termomodernizacji, • zakup wyposażenia DPS i ZRL, • dostos. obiektu do potrzeb osób niepełnospr., • usługi nadzoru inwest., • zapewnienie działań promocyjnych i inform. na rzecz takiego przystosowania obiektu, by mógła w nim działać placówka spełniająca standardy zgodnie z ustawą z dnia 12.03.2004 r. o pomocy społ.(Dz.U. z 2016r. poz.930) oraz Rozp. Min. Pracy i Polit. Społ. z dnia 23.08.2012 r. w sprawie d (Polish)
    0 references
    The project will consist of the reconstruction and extension of the existing building of the former St. Józefa in N-cu at ul. Quiet 4 in Novgorodec (No. 493/2 r.4 Nov.4) in order to adapt the object to new functions. As a result of the actions taken in the building, 3 independent institutions (organisational, functional and spatial) are to be created in the building related to the provision of social services for residents. It will be: Department of Social Assistance for the elderly (MGOPS Management Board), Specialist Care Centre (PAZOZ Management Board), Department of Medicinal Rehabilitation (PZOZ Management Board). The subject of this project is the establishment and equipment of the Social Assistance Centre located on the ground floor, on the first and second floor in the north-east part of the building and the Department of Rehabilitation of the Medicinal Rehabilitation located on the ground floor in the southeast part of the building. The usable area of the entire building is 2072.59 m² (DPS: 468,97 m², ZRL: 152,84 m², DOS: 602,50 m², common parts 848,28 m²). The eligible costs of common parts and development (green and architect) are calculated on the basis of the usable area index of individual establishments (according to the methodology attached to the application). The costs of setting up and equipping the ZRL together with its part-time partners as well as part of the scope of the land and all VAT are ineligible in the project. Create and equip. DOS is the subject of a separate application for funding. The project activities include: • preparation. project., • work in the framework of modernisation of the building (construction of the building) together with land use, • completion of installation works (electrical and sanitary). • activities in the field of thermomodernisation, • purchase of equipment DPS and ZRL, • adjustment of the facility to the needs of persons under-performance, • services of investment supervision, • provision of promotional activities and information for such adaptation of the facility. Min. Labor and Polit. Społ. of 23.08.2012 in case d (English)
    15 October 2020
    0 references
    Le projet consistera en la reconstruction et l’agrandissement du bâtiment existant de l’ancien hôpital St. Jozef à N-cu à ul. Silencieux 4 dans Nowogrodziec (loi No 493/2 r.4 Nowogrodziec) pour adapter l’objet aux nouvelles fonctions. Grâce aux mesures prises, le bâtiment doit créer trois institutions indépendantes (organisationnellement, fonctionnellement et spatialement) indépendantes liées à la prestation de services sociaux aux résidents. Il s’agira de: Maison de protection sociale pour les personnes âgées (Conseil d’administration de l’OGOPS), Centre de soins spécialisés (Conseil d’administration de la SPZOZ), Département de la réadaptation médicale (Conseil d’administration de PZOZ). L’objet de ce projet est la création et l’équipement du Centre de protection sociale situé au rez-de-chaussée, 1er et 2e étage dans la partie nord-est du bâtiment et du Département de réhabilitation des services médicinaux situé au rez-de-chaussée dans la partie sud-est du bâtiment. La surface utile de l’ensemble du bâtiment est de 2 072,59 m² (DPS: 468,97 m², ZRL: 152,84 m², DOS: 602,50 m², parties communes 848,28 m²). Les coûts éligibles des parties communes et du développement (verdure et architectes) ont été calculés sur la base du ratio de surface utilisable de chaque établissement (selon la méthodologie annexée à la demande). Les coûts liés à la mise en place et à l’équipement du ZRL avec sa partie, ainsi qu’une partie de l’étendue du terrain et de l’ensemble de la TVA sont inéligibles dans le projet. Créer et équiper. Le DAS fait l’objet d’une demande de financement distincte. Les activités du projet prévoient: • préparation du document. projet., • exécution des travaux dans le cadre de la modernisation du bâtiment (partie bâtiment) avec le site, • travaux d’installation (électriques et sanitaires), • activités de modernisation thermique, • achat d’équipements DPS et ZRL, • ajustement de l’installation aux besoins des personnes en pleine activité, • services de supervision des investissements, • fourniture d’activités promotionnelles et d’information en vue d’adapter l’installation afin qu’elle puisse exploiter une installation répondant aux normes conformément à la loi du 12 mars 2004 sur l’assistance sociale (Journal officiel 2016, point 930) et rozp. Min. Travail et Polit. Du 23 août 2012 dans l’affaire d (French)
    1 December 2021
    0 references

    Identifiers

    RPDS.06.01.01-02-0022/17
    0 references