Increase the energy efficiency of public utility buildings of Wałbrzych Municipality located at ul. 1 May 103-107, ul. Independence 64, ul. Garden 2A and St. 1 May 149 (Q95696)
Jump to navigation
Jump to search
Project Q95696 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase the energy efficiency of public utility buildings of Wałbrzych Municipality located at ul. 1 May 103-107, ul. Independence 64, ul. Garden 2A and St. 1 May 149 |
Project Q95696 in Poland |
Statements
3,373,875.2 zloty
0 references
3,969,264.94 zloty
0 references
85.0 percent
0 references
4 September 2014
0 references
30 April 2018
0 references
GMINA WAŁBRZYCH
0 references
Przedmiotem projektu jest termomodernizacja 4 budynków użyt. publ. w gm. Wałbrzych.Zakres projektu:Zad 1:Term. budynku Publicznej Szkoły Podstawowej nr 17 dociepl. ścian zew, stropodachu wentyl.wymiana stolarki okiennej i drzwiowej,wym.stolarki drzwiowej stalowej,wym.instalacji CO(grzejniki konwekcyjne, zawory termost.) wykonanie nowej instalacji CWU z pojemn. oraz przepływ. elektr.podgrzewaczy wody nadzór inwest.Zad 2:Term. budynku Domu Dziecka–ul. Niepodległości 64 docieplenie ścian zew. i wew.,stropu, dachu płaskiego nad klatką schodową,wym.stolarki okiennej i drzwiowej,modernizacja systemu CWU z wyk.instalacji solarnej oraz dogrzewaniem z kotła gaz.kompleksowa modernizacja systemu grzewczego–wymiana instalacji na nowoczesną z grzejnikami konwek.(zawory termostat.) oraz nowoczesnym kotłem kondensacyj.,regulatorem temp. wew. oraz automatyką pogodową,wymiana instalacji i opraw oświetl.na LED,nadzór inwest.Zad 3:Term. budynku–ul.Ogrodowa 2A:docieplenie ścian zew.stropodachu,wentyl. posadzki na gruncie styrop, wełną min, wym. stolarki okiennej i drzwiowej,wym. instalacji CWU na nową z cyrkulacją,wyk. wentylacji mechan. naw-wyw z odzyskiem ciepła w pom. kuchni,wym. instalacji CO wraz z wymianą grzejników oraz montaż zaworów termostat,wym. instalacji i opraw oświetl. na nowe LED,nadzór inwest.Zad 4: Term. budynku–ul. 1 Maja 149:dociepl.dachu płytą z EPS 16 cm, ścian zewn. styrop.EPS gr. 14 cm;dociepl. ścian zewn. parter styrop. EPS gr. 12cm;wym. stolarki okien. i drz.;modernizacja instal. CWU (inst. solarna, wym. przewodów i przyborów);modernizacja instal. grzewczej–kotła gazowego, przewodów i grzejników;nadzór inwest.Zad 5: Zarządz. projektem.Zad 6:Promocja projektu.Lok:PSP nr 17 ul 1 Maja 103-107 Wałbrzych Obręb Sobięcin nr 30 Dz nr 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze nr 33 Dz nr 628/3;Bud.ul Ogrodowa 2a Wałbrzych Obręb Szczawienko nr 4 Dz nr 177/17;Bud.ul 1 Maja 149 Wałbrzych Obręb Sobięcin nr 30 Dz nr 296/3 Rozp.realizacji projektu: 04 09 2014 (Polish)
0 references
The subject of the project is the thermal modernisation of 4 buildings used. publ. in the building of Wałbrzych.Scope of the project:Zad 1:Term. of the building of the Primary School No. 17 to heat the walls of the zw, stropodch valves. Independence of the interior and interior walls, ceiling, flat roof over staircase, o. window table and door, modernisation of the CWU system with solar installation and heating with boiler gas. Complex modernisation of the heating system and replacement of the installation on modern windows with stoves.(thermostatic valves) and a modern boiler of condensation. Term. building-ul. 1 May 149:dociepl.Stop with EPS 16 cm, external walls Styrop.EPS gr. 14 cm;dociepl. outdoor walls Styrop ground floor. EPS gr. 12 cm; em. window joinery. and drz.;modernisation of installation. CWU (int. solar, e.g. wires and utensils); modernisation of the heating installation-gas boiler, wires and radiators;investment supervision.Zad 5: Project Management.Zad 6:Promotion of the project.Lok:PSP no. 17 ul. 1 Maja 103-107 Wałbrzych Obręb Sobięcin nr 30 Dz nr 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze No.33 Dz. 04 09 2014 (English)
15 October 2020
0 references
L’objet du projet est la thermomodernisation de 4 bâtiments utilisés dans le bâtiment de Wałbrzych.Scope de projektu:Zad 1:Le terme de construction de l’école primaire publique no 17 pour les murs extérieurs, la rénovation de la menuiserie des fenêtres et des portes, le cadre de porte en acier, y compris l’installation de CO (chauffe-convection, vannes thermoost.) l’exécution d’une nouvelle installation CWU avec capacité. et l’écoulement. électr. chauffe-eau supervision. Zad 2:Construction de la maison Dziecka-ul. Indépendance 64 isolation des murs extérieurs et intérieurs, voie, toit plat au-dessus de l’escalier, fenêtres et cylindres de porte, modernisation du système CWU avec installation solaire et chauffage à partir de la chaudière à gaz. modernisation complète du système de chauffage — remplacement de l’installation par des chauffages convexes (les vannes thermostat) et une chaudière à condensation moderne., régulateur de température et automatisation météorologique, remplacement de l’installation et des appareils d’éclairage sur LED, supervision de l’investissement.Reg. 3:Term. building-ul.Garden 2A: isolation des murs de l’autre.stropodachu,ventil. planchers sur le sol de strop, la laine de mines, menuiserie de fenêtre et de porte, l’installation de CWU sur un nouveau avec circulation, usuel. mecan. de ventilation avec récupération de chaleur dans la cuisine, l’installation de CO ainsi que le remplacement des radiateurs et l’installation de vannes thermostat, installation et éclairage. pour les nouvelles LED, la supervision de l’investissement. Therm. bâtiment-ul. 1er mai 149:dociepl.Bath avec panneau EPS 16 cm, murs extérieurs styrophiles.EPS gr. 14 cm; isolation. mur extérieur Styrop. EPS gr. 12 cm; autre menuiserie de fenêtre. et drz.;modernisation de l’installation. CWU (énergie solaire, câblage et ustensiles); modernisation de l’installation de chauffage — chaudière à gaz, câblage et radiateurs; supervision des investissements.Règle 5: Gestion du projet.Règle 6:Promotion du projet.Lok:PSP no 17 ul. 1 Maja 103-107 Wałbrzych Obręb Sobięcin no 30 Dz. no 446/3;Bud.ul Niepodległości 64 Wałbrzych Obręb Podgórze no 33 Dz. 628/3;Bud.ul Ogrodowa 2a Wałbrzych Obręb Szczawienko no 4 Dz. no 177/17; Bud.ul 1er mai 149 Wałbrzych Obręb Sobięcin no 30 Dz. 296/3 Réalisation du projet: 04 09 2014 (French)
1 December 2021
0 references
Identifiers
RPDS.03.03.04-02-0023/16
0 references