Comprehensive modernisation of the public utility building located at ul. Hubska 8-16 in Wrocław (Q95631)

From EU Knowledge Graph
Revision as of 23:17, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est une modernisation complète de l’énergie d’un bâtiment public situé à ul. Hubska 8-16 à Wrocław. La principale prémisse de la mise en œuvre du projet est l’état technique insatisfaisant de l’installation. L’investissement permettra la création d’un bâtiment administratif entièrement équipé, doté d’une fonction éducative. L’installation mettra en œuvre de manière modèle la directive de l’UE relative à l’exigence de bâtiments...)
Jump to navigation Jump to search
Project Q95631 in Poland
Language Label Description Also known as
English
Comprehensive modernisation of the public utility building located at ul. Hubska 8-16 in Wrocław
Project Q95631 in Poland

    Statements

    0 references
    8,972,924.83 zloty
    0 references
    2,153,501.96 Euro
    13 January 2020
    0 references
    10,556,382.16 zloty
    0 references
    2,533,531.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    9 October 2017
    0 references
    31 December 2018
    0 references
    GMINA WROCŁAW
    0 references
    0 references
    Przedmiotem Projektu jest kompleksowa modernizacja energetyczna budynku użyteczności publicznej, zlokalizowanego przy ul. Hubskiej 8-16 we Wrocławiu. Główną przesłanką realizacji projektu jest niezadowalający stan techniczny obiektu. Inwestycja umożliwi stworzenie kompleksowo wyposażonego budynku administracyjnego z funkcją edukacyjną. Obiekt będzie w modelowy sposób realizował dyrektywę UE dotyczącą wymogu budownictwa „o niemal zerowym zużyciu energii” przez budynki zajmowane przez instytucje publiczne. Budynek zaprojektowano w standardzie niskoenergetycznym z zaawansowaną technologicznie i innowacyjną częścią instalacyjną, która wykorzystywać będzie odnawialne źródła energii. Zakres Projektu uwzględnia zastosowanie systemu zarządzania energią (BMS) oraz inne elementy ekologiczne w tym szkolenia osób stale korzystających z obiektu. Zakres prac związanych z poprawą efektywności energetycznej obiektu jest zgodny z założeniami audytu energetycznego. Operatorem projektu będzie Urząd Miejski Wrocławia. Obiekt użytkowany będzie przez pracowników Urzędu Miejskiego Wrocławia – Wydział Ochrony Środowiska oraz Straż Miejską Wrocławia. Zakres rzeczowy projektu obejmuje: opracowanie dokumentacji technicznej, roboty budowlano-montażowe, nadzór autorski, promocje projektu. Projekt zrealizowany zostanie w latach 2016-2018 w trybie "zaprojektuj i wybuduj". Wartość projektu wynosi 11 824 453,52 zł, w tym podatek VAT wynosi 2 211 076,67 PLN. Wydatki kwalifikowane wynoszą 10 559 382,16 PLN, w tym podatek VAT 1 974 518,61 PLN. Zakres rzeczowy Projektu obejmuje: roboty projektowe i budowlane w trybie "zaprojektuj i wybuduj", nadzór autorski, promocję projektu. Beneficjentem Projektu jest Gmina Wrocław. System zarządzania Projektem na etapie wdrażania będzie gwarantować jego sprawną realizację zgodnie z przyjętym harmonogramem oraz bezproblemowe rozliczenia z instytucjami współfinansującymi.Wnioskodawca posiada zdolność organizacyjną i finansową do utrzymania projektu. W okresie wymagan (Polish)
    0 references
    The subject of the project is a comprehensive energy modernisation of the public utility building, located at ul. Hubska 8-16 in Wrocław. The main premise of the project is the unsatisfactory technical condition of the facility. The investment will make it possible to create a fully equipped administrative building with educational function. The facility will modelly implement the EU directive on the construction requirement “almost zero energy consumption” for buildings occupied by public institutions. The building is designed in a low-energy standard with a technologically advanced and innovative installation part that will use renewable energy sources. The scope of the Project takes into account the use of the energy management system (BMS) and other environmental elements, including training of people constantly using the facility. The scope of work related to improving the energy efficiency of the facility is consistent with the assumptions of the energy audit. The project operator will be the City of Wrocław. The facility will be used by employees of the Wrocław City Council – Department of Environmental Protection and the City Guard of Wrocław. The project’s material scope includes: development of technical documentation, construction and assembly works, copyright supervision, project promotions. The project will be implemented in the years 2016-2018 in the “design and build” mode. The value of the project is PLN 11 824 453.52, including VAT is PLN 2 211 076.67. Eligible expenditure amounts to PLN 10 559 382.16, including VAT 1 974 518,61 PLN. The Project’s material scope includes: design and construction robots in “design and build” mode, copyright supervision, project promotion. The beneficiary of the project is the Municipality of Wrocław. The project management system at the implementation stage will guarantee its smooth implementation in accordance with the agreed timetable and seamless settlements with co-financing institutions.The applicant has the organisational and financial capacity to maintain the project. During the period of requirement (English)
    15 October 2020
    0 references
    L’objet du projet est une modernisation complète de l’énergie d’un bâtiment public situé à ul. Hubska 8-16 à Wrocław. La principale prémisse de la mise en œuvre du projet est l’état technique insatisfaisant de l’installation. L’investissement permettra la création d’un bâtiment administratif entièrement équipé, doté d’une fonction éducative. L’installation mettra en œuvre de manière modèle la directive de l’UE relative à l’exigence de bâtiments «presque zéro énergie» occupés par des organismes publics. Le bâtiment est conçu dans une norme de faible consommation d’énergie avec une pièce d’installation de haute technologie et innovante qui utilisera des sources d’énergie renouvelables. La portée du projet tient compte de l’application du système de gestion de l’énergie (BMS) et d’autres éléments environnementaux, y compris la formation des personnes qui utilisent constamment l’installation. Le champ des travaux liés à l’amélioration de l’efficacité énergétique de l’installation est conforme aux objectifs de l’audit énergétique. Le projet sera géré par le conseil municipal de Wrocław. L’installation sera utilisée par les employés du bureau municipal de Wrocław — Département de la protection de l’environnement et de la garde de la ville de Wrocław. Le champ d’application du projet comprend: préparation de la documentation technique, travaux de construction et d’assemblage, supervision de l’auteur, promotions de projets. Le projet sera réalisé en 2016-2018 en mode «conception et construction». La valeur du projet s’élève à 11 824 453,52 PLN, y compris la TVA de 2 211 076,67 PLN. Les dépenses éligibles s’élèvent à 10 559 382,16 PLN, y compris la TVA de 1 974 518,61 PLN. La portée matérielle du projet comprend: travaux de conception et de construction en mode «conception et construction», supervision d’auteur, promotion de projets. Le bénéficiaire du projet est la municipalité de Wrocław. Le système de gestion du projet au stade de la mise en œuvre garantira sa mise en œuvre harmonieuse conformément au calendrier convenu et le règlement sans heurt avec les institutions de cofinancement. Le demandeur a la capacité organisationnelle et financière de maintenir le projet. Pendant la période requise (French)
    1 December 2021
    0 references

    Identifiers

    RPDS.03.03.02-02-0022/16
    0 references