Construction and modernisation of the power grid with voltage SN and nn enabling connection of units of electricity generation from RES in the commune of Żukowice, Kotla, Głogów, Polkowice and Lubin. (Q95414)
Jump to navigation
Jump to search
Project Q95414 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction and modernisation of the power grid with voltage SN and nn enabling connection of units of electricity generation from RES in the commune of Żukowice, Kotla, Głogów, Polkowice and Lubin. |
Project Q95414 in Poland |
Statements
1,680,593.91 zloty
0 references
2,071,738.06 zloty
0 references
81.12 percent
0 references
9 June 2016
0 references
21 June 2019
0 references
TAURON DYSTRYBUCJA S.A.
0 references
Przedmiot projektu: W ramach projektu „Budowa i modernizacja sieci elektroenergetycznej o napięciu SN i nN umożliwiająca przyłączanie jednostek wytwarzania energii elektrycznej z OZE na terenie gminy Żukowice, Kotla, Głogów, Polkowice i Lubin” planowane są do realizacji roboty budowlane obejmujące 5 zadań: Zadanie 1 - Modernizacja sieci SN w gminie Żukowice - L-812 w zakresie: przebudowy linii napowietrznej SN 3xBLL-T 70 mm2 i 3xBLL-T 50 mm2, montażu linii kablowej SN 3xXRUHAKXS 1x240/25 mm2 W ramach Zadania 1 powstanie: 3,2 km zmodernizowanej sieci elektroenergetycznej średniego napięcia dla OZE Zadanie 2 - Modernizacja sieci SN w gminie Kotla L-805 w zakresie: demontażu obecnej linii napowietrznej i przebudowy na linię kablową SN 3xXRUHAKXS 1x120/25 mm2 oraz budowy dwóch złączy kablowych SN. W ramach Zadania 2 powstanie: 2,3 km zmodernizowanej sieci elektroenergetycznej średniego napięcia dla OZE Zadanie 3 - Modernizacja sieci SN w miejscowości Głogów L-814 na linię typu 3x XRUHAKXS 1x120/25mm2 W ramach Zadania 3 powstanie: 0,9 km zmodernizowanej sieci elektroenergetycznej średniego napięcia dla OZE Zadanie 4 - Budowa powiązania SN relacji L-404 z GPZ-POLKOWICE STREFA do R-917-2 w miejscowości Polkowice L-404 w zakresie budowy linii SN typu 3x XRUHAKXS 1x120/25mm2 W ramach Zadania 4 powstanie: 1,2 km nowobudowanej sieci elektroenergetycznej średniego napięcia dla OZE Zadanie 5 - Budowa sieci SN w miejscowości Osiek - Kłopotów L-961-40 i L-953 w zakresie: budowa linii kablowej SN 20 kV XRUHAKXS 1x120mm2/25mm2 oraz zabudowy szafki telemechaniki. W ramach Zadania 5 powstanie: 2,1 km nowobudowanej sieci elektroenergetycznej średniego napięcia dla OZE Celem projektu jest umożliwienie przyłączenia do sieci TAURON Dystrybucja 15 elektrowni OZE o potencjalnej mocy 12.753 kW oraz przyszłych wnioskodawców o przyłączenie OZE. Zrealizowanie tych przyłączeń nie jest możliwe bez realizacji przedmiotowego projektu, ze względu na brak wystarczając (Polish)
0 references
Subject matter of the project: As part of the project “Construction and modernisation of the power grid with SN and nN voltages enabling connection of electricity generation units from RES in the commune of Żukowice, Kotla, Głogów, Polkowice and Lubin” the construction works covering 5 tasks are planned: Task 1 – Modernisation of the SN network in Żukowice commune – L-812 in the scope of: reconstruction of overhead line SN 3xBLL-T 70 mm² and 3xBLL-T 50 mm², installation of cable line SN 3xXXRUHAKXS 1x240/25 mm² As part of Task 1 will be created: 3.2 km of modernised medium voltage electricity grid for RES Task 2 – Modernisation of the SN network in Kotla L-805 commune in the scope of: dismantling the current overhead line and conversion into the cable line SN 3xXXRUHAKXS 1x120/25 mm² and the construction of two SN cable connectors. As part of Task 2, the following will be created: 2.3 km of modernised medium voltage electricity grid for RES Task 3 – Modernisation of the SN network in Głogów L-814 for a line of type 3x XRUHAKXS 1x120/25 mm² As part of Task 3 will be created: 0.9 km of modernised medium voltage power grid for RES Task 4 – Construction of the connection of SN between L-404 and GPZ-Polkowice STREFA to R-917-2 in Polkowice L-404 in the scope of construction of SN line type 3x XRUHAKXS 1x120/25 mm² As part of Task 4, there will be: 1.2 km of newly built medium voltage electricity grid for RES Task 5 – Construction of the SN network in Osiek – Kłopotów L-961-40 and L-953 in the scope of: construction of cable line SN 20 kV XRUHAKXS 1x120 mm²/25 mm² and telemechanics cabinets. As part of Task 5, the following will be created: 2.1 km of newly built medium voltage electricity grid for RES The aim of the project is to enable connection to the TAURON network Distribution of 15 RES power plants with a potential power of 12.753 kW and future applicants for RES connection. These connections cannot be realised without the project being implemented, due to lack of sufficient (English)
15 October 2020
0 references
Objet du projet: Dans le cadre du projet «Construction et modernisation du réseau électrique avec une tension de SN et de NN permettant le raccordement d’unités de production d’électricité à partir de SER dans les municipalités de Uukowice, Kotla, Głogów, Polkowice et Lubin», des travaux de construction comportant 5 tâches sont prévus pour: Activité 1 — Modernisation du réseau SN dans la commune de Žukowice — L-812 dans le cadre de: reconstruction de la ligne aérienne SN 3xBLL-T 70 mm² et 3xBLL-T 50 mm², montage de la ligne de câble SN 3xXRUHAKXS 1x240/25 mm² Dans le cadre de la réalisation de la tâche 1: 3,2 km de réseau électrique à moyenne tension modernisé pour la tâche SER 2 — Modernisation du réseau SN dans la commune de Kotla L-805 dans le cadre de: démontage de la ligne aérienne actuelle et conversion en ligne SN 3xXRUHAKXS 1x120/25 mm² et construction de deux connecteurs de câble SN. Dans le cadre de la tâche 2, les éléments suivants seront créés: Tâche 3 — Modernisation du réseau SN à Głogów L-814 pour 3x XRUHAKXS 1x120/25 mm² Dans le cadre de la création de la tâche 3: 0,9 km de réseau électrique à moyenne tension modernisé pour la tâche 4 RES — Construire la liaison entre SN entre L-404 et GPZ-POLKOWICE STREFA à R-917-2 à Polkowice L-404 pour la construction de la ligne 3x SN XRUHAKXS 1x120/25 mm² 1,2 km de réseau électrique à moyenne tension nouvellement construit pour la tâche SER 5 — Construction du réseau SN à Osiek — Kłopotów L-961-40 et L-953 dans le cadre: construction de la ligne de câble SN 20 kV XRUHAKXS 1x120 mm²/25 mm² et installation d’armoire télémécanique. Dans le cadre de la tâche 5, les éléments suivants seront créés: 2,1 km de réseau électrique moyenne tension nouvellement construit pour les SER L’objectif du projet est de permettre la connexion au réseau TAURON Distribution de 15 centrales SER d’une capacité potentielle de 12,753 kW et de futurs candidats au raccordement SER. Il n’est pas possible de réaliser ces connexions sans la mise en œuvre du projet en question, car il n’est pas suffisant (French)
1 December 2021
0 references
Identifiers
RPDS.03.01.00-02-0128/16
0 references