Extension of the Centre for Research and Development of Advanced Paper and Foil Materials. (Q94405)

From EU Knowledge Graph
Revision as of 22:59, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet est d’accroître l’innovation de Dolpap par le développement d’activités de recherche. Les objectifs spécifiques devraient inclure: développement d’installations de R-D Dolpap et développement des compétences du personnel de recherche Dolpap par la formation sur l’utilisation de nouvelles infrastructures. L’objet du projet est l’extension du centre de recherche et de développement de matériaux avancés de papier et d...)
Jump to navigation Jump to search
Project Q94405 in Poland
Language Label Description Also known as
English
Extension of the Centre for Research and Development of Advanced Paper and Foil Materials.
Project Q94405 in Poland

    Statements

    0 references
    446,132.45 zloty
    0 references
    107,071.79 Euro
    13 January 2020
    0 references
    991,405.44 zloty
    0 references
    237,937.31 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    1 April 2017
    0 references
    6 December 2019
    0 references
    ZAKŁAD PRODUKCJI WYROBÓW PAPIEROWYCH DOLPAP SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    51°16'19.9"N, 15°56'21.8"E
    0 references
    Celem głównym Projektu jest podniesienie innowacyjności firmy DOLPAP poprzez rozwój aktywności badawczo rozwojowej. Do celów szczegółowych należy zaliczyć: rozwój zaplecza badawczo-rozwojowego firmy DOLPAP oraz rozwój umiejętności kadry badawczej firmy DOLPAP poprzez szkolenia z zakresu wykorzystania nowej infrastruktury. Przedmiotem projektu jest rozbudowa centrum badań i rozwoju zaawansowanych materiałów papierowych i foliowych wraz z zakupem wyposażenia Etap ten zgodnie z planem B+R opracowanym we współpracy z jednostką naukową został określony z uwagi na swój charakter infrastrukturalny jako Etap „0” tzw. Prace Organizacyjne. W niniejszym Etapie „0” zostanie zagospodarowana przestrzeń wyznaczona przez firmę DOLPAP na rozbudowę centrum badań i rozwoju. Zgodnie z przygotowanym projektem rozbudowy, będzie ona miała na celu bardziej efektywne i wydajne zagospodarowanie przestrzeni przeznaczonej na badania i rozwój. Ponadto centrum zostanie wyposażone w specjalistyczny sprzęt pomiarowy niezbędny do prowadzenia badań rozwojowych (kadra badawcza przeszkolona z zakresu jego obsługi) oraz wyposażenie biurowe i komputerowe. ETAP „0” stanowiący przedmiot Projektu obejmuje następujące fazy: Faza 1 – rozbudowa CBiR od 01.10.2017 do 30.06.2018 W wyniku realizacji tej fazy Projektu powstaną pomieszczenia CBiR stanowiące miejsca pracy kadry B+R o łącznej powierzchni: 136,95 m2 Faza 2 – zakup specjalistycznego wyposażenia oraz wyposażenia biurowego i komputerowego dla potrzeb CBiR od 01.01.2018 do 30.09.2018: 1. Statyczna maszyna wytrzymałościowa – 1 szt. 2. Tester siły przedzierania metodą Elmendorf''a – 1 szt. 3. Chłodziarka laboratoryjna – 1 szt. 4. Aplikator do nakładania warstw – 1 szt. 5. Komora klimatyczno-temperaturowa – 1 szt. 6. Suszarka laboratoryjna – 1 szt. 7. Aparat do pomiaru siły release – 1 szt. Z uwagi na ograniczoną liczbę znaków ciąg dalszy opisu zawarto w zał. nr 26.1 (Polish)
    0 references
    The main objective of the Project is to increase the innovation of DOLPAP through the development of R & D activity. For specific purposes, it shall include: development of DOLPAP R & D facilities and development of DOLPAP research staff through training in the use of new infrastructure. The subject of the project is the expansion of the research and development centre of advanced paper and foil materials together with the purchase of equipment This stage according to the R & D plan developed in cooperation with the scientific unit was defined due to its infrastructure character as Stage “0” so-called. The Organisational Works. In this Stage “0” the space designated by DOLPAP for the expansion of the R & D centre will be developed. According to the planned expansion project, it will aim at more efficient and efficient use of the R & D space. In addition, the centre will be equipped with specialised measuring equipment necessary for development research (a research team trained in its operation) and office and computer equipment. The “0” phase of the Project shall cover the following phases: Phase 1 – extension of CBiR from 01.10.2017 to 30.06.2018 As a result of the implementation of this phase of the Project, CBiR rooms will be created which are the workplaces of R & D staff with a total area of: 136,95 m² Phase 2 – purchase of specialised equipment and office and computer equipment for CBiR purposes from 01.01.2018 to 30.09.2018: 1. Static strength machine – 1 pcs. 2. Elmendorf method piercing force tester – 1 pcs. 3. Laboratory refrigerator – 1 pcs. 4. Application for application layers – 1 pcs. 5. Climate and temperature chamber – 1 pcs. 6. Laboratory dryer – 1 pcs. 7. Camera for measuring the strength release – 1 pcs. Due to the limited number of characters, further description is included in Appendix No. 26.1. (English)
    15 October 2020
    0 references
    L’objectif principal du projet est d’accroître l’innovation de Dolpap par le développement d’activités de recherche. Les objectifs spécifiques devraient inclure: développement d’installations de R-D Dolpap et développement des compétences du personnel de recherche Dolpap par la formation sur l’utilisation de nouvelles infrastructures. L’objet du projet est l’extension du centre de recherche et de développement de matériaux avancés de papier et de feuilles ainsi que l’achat d’équipements L’étape, conformément au plan de R & D élaboré en coopération avec l’unité scientifique, a été définie en raison de sa nature infrastructurelle comme étant la phase «0» dite «0». Travail d’organisation. Dans cette étape «0», l’espace désigné par Dolpap pour l’expansion du centre de R & D sera développé. Selon le projet d’expansion prévu, il visera à une utilisation plus efficace et plus efficace de l’espace de R & D. En outre, le centre sera équipé de l’équipement de mesure spécialisé nécessaire à la réalisation de la recherche de développement (personnel de recherche formé à son fonctionnement) ainsi que de l’équipement de bureau et informatique. La phase «0» couverte par le projet comprend les phases suivantes: Phase 1 — extension du CBIR du 1er octobre 2017 au 30 juin 2018 À la suite de cette phase du projet, des locaux du CBIR seront créés, représentant des emplois en R & D d’une superficie totale de: 136,95 m² Phase 2 — achat de matériel de bureau et informatique spécialisé pour CBIR du 01.01.2018 au 30.09.2018: 1. Machine statique de résistance — 1 pcs. 2. Elmendorf testeur de force de perçage — 1 pcs. 3. Réfrigérateur de laboratoire — 1 pcs. 4. Applicateur pour couches — 1 pcs. 5. Chambre climatique-température — 1 pcs. 6. Sèche-linge de laboratoire — 1 pcs. 7. Relâchement de l’appareil de mesure de la force — 1 pcs. En raison du nombre limité de caractères, une description plus détaillée figure à l’annexe 26.1. (French)
    30 November 2021
    0 references

    Identifiers

    RPDS.01.02.01-02-0019/17
    0 references