Works on railway line No. 219 on the Szczytno-Ełk section (Q88502)

From EU Knowledge Graph
Revision as of 22:09, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Les travaux sur la ligne de chemin de fer no 219 sur le tronçon Szczytno — Ełk comprennent: Les travaux d’infrastructure, y compris la remise en état de la ligne 219 du km 45 823 au km 156.950, c’est-à-dire 111,127 km (selon le kilomètre existant), avec la longueur finale prévue du tronçon de la ligne 219 réhabilité à la suite de la reconstruction du réseau de voies à la gare d’Ełk; Travaux de gare, y compris la reconstruction de la gare de Szcz...)
Jump to navigation Jump to search
Project Q88502 in Poland
Language Label Description Also known as
English
Works on railway line No. 219 on the Szczytno-Ełk section
Project Q88502 in Poland

    Statements

    0 references
    262,027,757.38 zloty
    0 references
    62,886,661.77 Euro
    13 January 2020
    0 references
    308,267,949.87 zloty
    0 references
    73,984,307.97 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 December 2016
    0 references
    31 March 2020
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    Projekt Prace na linii kolejowej nr 219 na odcinku Szczytno - Ełk obejmuje: Prace infrastrukturalne, obejmujące rehabilitację linii nr 219 na odcinku od km 45,823 do km 156,950, to jest o długości 111,127 km (wg istniejącego kilometrażu), przy czym, w wyniku przebudowy układu torowego na stacji Ełk, planowana finalna długość zrehabilitowanego odcinka linii nr 219 wynosić będzie 111,069 km; Prace dworcowe, obejmujące przebudowę dworca w Szczytnie wraz z budową parkingu Park&Ride. Prace infrastrukturalne obejmują przywrócenie pierwotnych parametrów technicznych linii wraz dostosowaniem elementów infrastruktury do potrzeb osób o ograniczonej możliwości ruchowej. W ramach Projektu wykonane zostaną m.in. następujące roboty budowlane: • wymiana nawierzchni torowej na całej długości linii, • wymiana rozjazdów w torach szlakowych oraz głównych zasadniczych, • prace budowlane na obiektach inżynieryjnych, w tym rozbiórka i odbudowa 2 mostów, • likwidacja 11 przejazdów kolejowych, • modernizacja 89 przejazdów kolejowych, w tym podniesienie kategorii na 13 przejazdach, • likwidacja 1 przystanku osobowego, • modernizacja obiektów obsługi podróżnych (14 przystanków osobowych i 4 stacji), w tym zmiana 2 przystanków osobowych na stacje, • budowa 1 przystanku osobowego, • przebudowa 18 peronów i budowa 1 peronu wraz z infrastrukturą spełniającą wymogi TSI, • modernizacja urządzeń srk. (Polish)
    0 references
    Project Works on the railway line No. 219 on the Szczytno-Ełk section includes: Infrastructure works, including rehabilitation of line No. 219 in the section from km 45.823 to km 156.950, i.e. 111.127 km long (according to the existing kilometre), the planned final length of the rehabilitated section of line 219 will be 111,069 km as a result of the reconstruction of the track system at Ełk station; The station works, including the reconstruction of the station in Szczytno with the construction of the Park &Ride parking lot. Infrastructure works include the restoration of the original technical parameters of the line with the adaptation of infrastructure elements to the needs of people with reduced mobility. As part of the project, the following construction works will be carried out: • replacement of track pavement on the entire length of the line, • replacement of switches in the tracks and the main basic, • construction works on engineering facilities, including demolition and reconstruction of 2 bridges, • liquidation of 11 railway crossings, • modernisation of 89 railway crossings, including construction of the category on 13 crossings, • removal of 1 passenger stops, • modernisation of passenger facilities (14 passenger platforms and 4 stations), (English)
    14 October 2020
    0 references
    Les travaux sur la ligne de chemin de fer no 219 sur le tronçon Szczytno — Ełk comprennent: Les travaux d’infrastructure, y compris la remise en état de la ligne 219 du km 45 823 au km 156.950, c’est-à-dire 111,127 km (selon le kilomètre existant), avec la longueur finale prévue du tronçon de la ligne 219 réhabilité à la suite de la reconstruction du réseau de voies à la gare d’Ełk; Travaux de gare, y compris la reconstruction de la gare de Szczytno, ainsi que la construction du parking Park&Ride. Les travaux d’infrastructure comprennent la restauration des paramètres techniques d’origine de la ligne et l’adaptation de l’infrastructure aux besoins des personnes à mobilité réduite. Les travaux de construction suivants seront réalisés dans le cadre du projet: • remplacement de la surface de la voie sur toute la longueur de la ligne, • remplacement des branchements sur les voies et les principaux principaux, • travaux de construction d’installations d’ingénierie, y compris démolition et reconstruction de 2 ponts, • démantèlement de 11 passages à niveau, • modernisation de 89 passages à niveau, y compris relèvement de la catégorie de 13 passages à niveau, • déclassement d’un arrêt de passagers, • modernisation des installations destinées aux passagers (14 arrêts passagers et 4 gares), y compris le changement de 2 arrêts passagers en gares, • construction d’un arrêt passagers, • reconstruction de 18 quais et construction de quai 1 avec une infrastructure conforme aux STI, • modernisation de l’équipement de la gare. (French)
    30 November 2021
    0 references

    Identifiers

    POPW.03.01.00-00-0009/17
    0 references