Works on railway line No. 52 on the Lewki – Hajnówka section (Q88499)

From EU Knowledge Graph
Revision as of 22:09, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet comprend des travaux d’infrastructure comprenant la remise en état de la ligne de chemin de fer 52 sur le tronçon allant du km -0.151 (branche gauche) au km 26 261 (gare Hajnówka) d’une longueur de 26,412 km. La section analysée a le statut d’une ligne de signification locale. La section de la ligne 52 couverte par le projet est une seule voie. Le projet comprend la remise en circulation de la ligne de chemin de fer pour des besoins te...)
Jump to navigation Jump to search
Project Q88499 in Poland
Language Label Description Also known as
English
Works on railway line No. 52 on the Lewki – Hajnówka section
Project Q88499 in Poland

    Statements

    0 references
    75,149,976.0 zloty
    0 references
    18,035,994.24 Euro
    13 January 2020
    0 references
    88,411,736.48 zloty
    0 references
    21,218,816.76 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 August 2017
    0 references
    31 December 2020
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    Zakres Projektu obejmuje Prace infrastrukturalne polegające na rehabilitacji linii kolejowej nr 52 na odcinku od km -0,151 (posterunek odgałęźny Lewki) do km 26,261 (stacja Hajnówka) o długości 26,412 km. Analizowany odcinek posiada status linii znaczenia lokalnego. Odcinek linii nr 52 objęty Projektem jest jednotorowy. Projekt zakłada przywrócenie linii kolejowej do ruchu dla potrzeb techniczno – ruchowych oraz wykonanie prac o charakterze odtworzeniowym dla nieeksploatowanych obiektów obsługi podróżnych i dostosowanie elementów infrastruktury do potrzeb osób o ograniczonej możliwości ruchowej. W ramach Projektu zostaną wykonane roboty budowlane polegające m.in. na: - kompleksowej modernizacji systemów i urządzeń elektroenergetyki do 1 kV na przedmiotowym odcinku linii kolejowej, co pozwoli na zabudowę nowoczesnych urządzeń i systemów sterowania na rehabilitowanej linii, - pracach konserwacyjnych na części obiektów inżynieryjnych zlokalizowanych na analizowanym odcinku, a w niektórych przypadkach rozbiórkę i budowę nowych obiektów, - budowie 3 peronów w nowych lokalizacjach wraz z dojściem, rozbiórkę starych i ponowną zabudowę 4 nowych peronów oraz likwidację 2 peronów wraz z niwelacją terenu, - pracach na przejazdach kolejowych związanych m.in. z zabudową systemu srk kat. B lub C, zabudową nowej nawierzchni przejazdowej, niwelacją terenu, wycinką drzew, uzupełnieniem oznakowania, - instalacji półsamoczynnej blokady liniowej jednoodstępowej dwukierunkowej, instalacji tarcz ostrzegawczych wraz z okablowaniem, zabudowy systemu kontroli niezajętości szlaku, instalacji wskaźników przytorowych, - odbudowie nawierzchni torowej, wymianie rozjazdów, montażu nowych rozjazdów, - odtworzeniu urządzeń i linii teletechnicznej, ułożeniu na całej długości linii kabla do celów łączności i transmisji, wymianie central radiołączności, montażu lub wymianie megafonów, zegarów i tablic informacyjnych. (Polish)
    0 references
    The scope of the Project includes Infrastructure Works consisting of rehabilitation of railway line No. 52 in the section from km -0.151 (left control Lewki) to 26.261 km (Hajnówka station) with a length of 26.412 km. The analysed section has the status of a local meaning line. The section of line 52 covered by the Project is single track. The project involves restoring the railway line to traffic for technical and traffic purposes and carrying out replacement works for unexploited travellers’ facilities and adapting the infrastructure elements to the needs of people with reduced mobility. As part of the project, construction works consisting of, among others: — comprehensive modernisation of power systems and appliances up to 1 kV on this section of the railway line, which will allow for the construction of modern equipment and control systems on the rehabilitated line, – maintenance works on parts of engineering facilities located on the analysed section, and in some cases demolition and construction of new facilities, – construction of 3 platforms in new locations with access, demolition of old and re-construction of 4 new platforms, and liquidation of 2 platforms. B or C, construction of a new pass surface, levelling, tree cutting, marking addition, – installation of semi-automatic linear two-way locking, installation of warning discs with wiring, installation of a track-side control system, installation of track-side indicators, – reconstruction of the track pavement, replacement of switchboards, installation of new switches, – reconstruction of the equipment and line of the teletechnical, (English)
    14 October 2020
    0 references
    Le projet comprend des travaux d’infrastructure comprenant la remise en état de la ligne de chemin de fer 52 sur le tronçon allant du km -0.151 (branche gauche) au km 26 261 (gare Hajnówka) d’une longueur de 26,412 km. La section analysée a le statut d’une ligne de signification locale. La section de la ligne 52 couverte par le projet est une seule voie. Le projet comprend la remise en circulation de la ligne de chemin de fer pour des besoins techniques et opérationnels, la réalisation de travaux de remise en état des installations de transport de voyageurs non exploitées et l’adaptation des éléments d’infrastructure aux besoins des personnes à mobilité réduite. Le projet réalisera des travaux de construction comprenant, entre autres: — une modernisation complète des systèmes électriques et des équipements jusqu’à 1 kV sur ce tronçon de la ligne ferroviaire, qui permettra la construction d’équipements et de systèmes de contrôle modernes sur la ligne réhabilitée, — les travaux d’entretien de parties de structures d’ingénierie situées sur le tronçon analysé, et dans certains cas la démolition et la construction de nouvelles installations, — la construction de 3 plates-formes dans de nouveaux emplacements avec accès, la démolition de l’ancienne et la reconstruction de 4 nouvelles plates-formes et le déclassement de 2 plates-formes ainsi que le nivellement de la zone, — les travaux sur les passages à niveau liés, entre autres, à la construction du système kat. B ou C, installation de nouvelles surfaces de croisement, nivellement du terrain, abattage des arbres, ajout de marquage, — installation d’un système de verrouillage linéaire semi-automatique à deux voies, installation de disques d’avertissement avec câblage, installation d’un système de contrôle de l’occupation au sol, installation d’écartement au sol, — reconstruction de la surface de la voie, remplacement des branchements, installation de nouveaux branchements, — reconstruction de l’équipement et de la ligne de télécommunication, pose sur l’ensemble de la ligne de câble à des fins de communication et de transmission, remplacement de tableaux radio, installation ou remplacement de mégaphones, horloges et tableaux d’information. (French)
    30 November 2021
    0 references

    Identifiers

    POPW.03.01.00-00-0006/17
    0 references