Revision as of 21:48, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est d’améliorer le fonctionnement des transports publics à Rzeszów. Dans le cadre du projet, les tâches suivantes seront exécutées: 1. La composante STI: — extension du système de contrôle de la circulation routière par 2 sous-systèmes, — extension du système dynamique de pesage des véhicules, y compris la construction de stations de mesure pour les véhicules de pesage, — extension du service en ligne pour les conducteurs, —...)
Jump to navigation Jump to search
Project Q88457 in Poland
Language Label Description Also known as
English
Integration of different forms of public public transport in Rzeszów
Project Q88457 in Poland

    Statements

    0 references
    153,820,243.7 zloty
    0 references
    36,916,858.49 Euro
    13 January 2020
    0 references
    180,964,992.68 zloty
    0 references
    43,431,598.24 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 November 2016
    0 references
    31 March 2021
    0 references
    GMINA MIASTO RZESZÓW
    0 references
    0 references
    Przedmiotem projektu jest poprawa funkcjonowania transportu publicznego w Rzeszowie. W ramach projektu zostaną zrealizowane nw. zadania: 1. Komponent ITS: - rozbudowa Systemu Obszarowego Sterowania Ruchem Drogowym o 2 podsystemy, - rozbudowa Systemu Dynamicznego Ważenia Pojazdów w tym budowa stanowisk pomiarowych do ważenia pojazdów, - rozbudowa serwisu internetowego dla kierowców, - włączenie do systemu 4 sygnalizacji świetlnych, - rozbudowę Systemu Zarządzania Transportem Publicznym na potrzeby Rzeszowskiego Centrum Komunikacji - rozbudowa sieci PTITS (szkielet światłowodowy i data center) 2. Zakup nowoczesnego, ekologicznego i przystosowanego dla osób niepełnosprawnych taboru autobusowego (60 szt.), w tym: - Autobusy z napędem EURO 6 ON (12m) – 20 sztuk; - Autobusy z napędem EURO 6 CNG (12m) – 40 sztuk. 3. Budowa/przebudowa i wyposażenie infrastruktury przystankowej usprawniającej funkcjonowanie transportu publicznego, w tym: - wymiana krawężników na „wklęsłe" i/lub wyposażenie peronów we wtopione w ciągi piesze udogodnienia dla osób niedowidzących - 29 zatok autobusowych - wyposażenie 27 zespołów przystankowych w różnej kompletacji: wiata, zespół wiat, ławki, - Utworzenie centrum przesiadkowego - (RCK) 4. Budowa/ rozbudowa/ przebudowa infrastruktury drogowej 5. Poprawa rzeszowskiej infrastruktury rowerowej Głównymi użytkownikami projektu są mieszkańcy Rzeszowa, przede wszystkim osoby korzystające z usług transportu publicznego. Odbiorcami projektu są również osoby przyjeżdżające do miasta w różnych celach. Wśród odbiorców projektu przeprowadzono szereg badań, które miały na celu uzasadnienie realizacji projektu. (Polish)
    0 references
    The aim of the project is to improve the functioning of public transport in Rzeszów. Within the framework of the project, the following tasks will be carried out: 1. The ITS component: — extension of the Traffic Control Area System by 2 subsystems, – expansion of the Dynamic Vehicle Weight System including the construction of measuring stations for weighing vehicles, – extension of the Internet service for drivers, – inclusion in the system of 4 light signals, – extension of the Public Transport Management System for the needs of the Rzeszów Communication Centre – extension of the network ptits (fibre optic skeleton and data center) 2. Purchase of modern, ecological and disabled bus rolling stock (60 pcs), including: — Buses with drive EURO 6 ON (12 m) – 20 units; — Buses with EURO 6 CNG (12 m) – 40 units. 3. Construction/reconstruction and equipment of stop infrastructure improving the functioning of public transport, including: — replacement of curbs for “concave” and/or platforms with integrated walkway facilities for visually impaired persons – 29 bus bays – equipment of 27 stop teams in various sets: world, world team, benches, – Creating a transfer centre – (RCK) 4. Construction/expansion/reconstruction of road infrastructure 5. Improvement of the Rzeszów cycling infrastructure The main users of the project are residents of Rzeszów, mainly people using public transport services. The recipients of the project are also people coming to the city for various purposes. Among the recipients of the project, a number of studies were carried out to justify the implementation of the project. (English)
    14 October 2020
    0 references
    L’objectif du projet est d’améliorer le fonctionnement des transports publics à Rzeszów. Dans le cadre du projet, les tâches suivantes seront exécutées: 1. La composante STI: — extension du système de contrôle de la circulation routière par 2 sous-systèmes, — extension du système dynamique de pesage des véhicules, y compris la construction de stations de mesure pour les véhicules de pesage, — extension du service en ligne pour les conducteurs, — inclusion dans le système de 4 feux de circulation, — extension du système de gestion des transports publics pour les besoins du centre de communication de Rzeszów — extension du réseau de ptits (squelette fibre optique et centre de données) 2. Achat de matériel roulant moderne, respectueux de l’environnement et adapté aux personnes handicapées (60 unités), comprenant: — Bus avec EURO 6 ON (12 m) — 20 unités; — Bus avec EURO 6 CNG (12 m) — 40 unités. 3. Construction/reconstruction et équipement d’infrastructures d’arrêt pour améliorer le fonctionnement des transports publics, y compris: — remplacement des trottoirs par des trottoirs concaves et/ou de l’équipement des plates-formes piétonnes intégrées pour les personnes malvoyantes — 29 baies de bus — équipant 27 arrêts de ramassage différents: hangars, ensemble mondial, bancs, — Création d’un centre de transfert — (RCK) 4. Construction/expansion/reconstruction de l’infrastructure routière 5. Les principaux utilisateurs du projet sont les habitants de Rzeszów, en particulier ceux qui utilisent les transports publics. Les bénéficiaires du projet sont également des personnes venues en ville à des fins diverses. Parmi les bénéficiaires du projet, un certain nombre d’études ont été réalisées pour justifier la mise en œuvre du projet. (French)
    30 November 2021
    0 references

    Identifiers

    POPW.02.01.00-18-0002/16
    0 references