Construction of a tramway along the street. Kujawska on the section from the Kujawski roundabout to the Bernardy Roundabout along with the extension of the road system, the reconstruction of rail transport infrastructure and the purchase of rolling stock in Bydgoszcz. (Q86055)
Jump to navigation
Jump to search
Project Q86055 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a tramway along the street. Kujawska on the section from the Kujawski roundabout to the Bernardy Roundabout along with the extension of the road system, the reconstruction of rail transport infrastructure and the purchase of rolling stock in Bydgoszcz. |
Project Q86055 in Poland |
Statements
168,300,000.0 zloty
0 references
212,000,099.49 zloty
0 references
79.39 percent
0 references
1 January 2014
0 references
31 December 2021
0 references
BYDGOSZCZ - MIASTO NA PRAWACH POWIATU
0 references
Projekt obejmuje budowę infrastruktury szynowej w ul. Kujawskiej na odcinku od ronda Kujawskiego do ronda Bernardyńskiego wraz z przebudową układu dróg, przebudowę infrastruktury transportu szynowego w ciągu ul. Wojska Polskiego od pętli Magnuszewska do węzła komunikacyjnego Wojska Polskiego – Szpitalna - Szarych Szeregów – Bełzy oraz przyłączenie wyżej wymienionych odcinków do Systemu Transportowego miasta Bydgoszczy (ITS), przebudowę i budowę parkingów oraz zakup nowoczesnego taboru tramwajowego. Obejmuje: • budowę infrastruktury szynowej na odcinku od ronda Kujawskiego do ronda Bernardyńskiego wraz z budową trakcji, oświetleniem (w tym powiązanie funkcji trakcji tramwajowej z oświetleniem), 8 przystankami tramwajowymi, podłączeniem do ITS oraz przebudową istniejącej i budową nowej drogi dwujezdniowej z wydzielonym BUSPASEM a także przebudową i budową chodników i przejść dla pieszych; • przebudowę infrastruktury transportu szynowego na odcinku od pętli Magnuszewska do węzła komunikacyjnego Wojska Polskiego – Szpitalna – Szarych Szeregów – Bełzy; • budowę i przebudowę zatok autobusowych; • przebudowę infrastruktury (w tym podziemnej) kolidującej z zakresem rzeczowym projektu • budowę parkingu Park&Ride przy rondzie Kujawskim; • przebudowę parkingów na ul. Ustronie i ul. Długiej oraz miejsc postojo Celem przedsięwzięcia jest usprawnienie systemu miejskiej komunikacji zbiorowej, prowadzące do zwiększenia udziału osób korzystających ze środków transportu publicznego. Całość zadań infrastrukturalnych polega na wykonaniu robót - torowych, drogowych, wodociągowych, energetycznych (oświetlenie i sygnalizacja świetlna), odwodnieniowych, gazowych, szaty roślinnej, wraz z systemem monitoringu miejskiego, natomiast zadanie taborowe polega na dostarczeniu 15 szt. niskopodłogowych, nowoczesnych tramwajów. Zadania przyczynią się do zmniejszenia zatłoczenia motoryzacyjnego w mieście, do poprawy płynności ruchu i ograniczenia negatywnego wpływu transportu na środowisko. (Polish)
0 references
The project includes the construction of rail infrastructure in ul. Kujawska on the section from the Kujawski roundabout to the Bernardyński roundabout along with the reconstruction of the road layout, reconstruction of the rail transport infrastructure within the street. The Polish Army from the Magnuszewska loop to the transport hub of the Polish Army – Szpitalna – Szaryregów – Bełzy and the connection of the above mentioned sections to the Transport System of the City of Bydgoszcz (ITS), the reconstruction and construction of parking lots and the purchase of modern tram rolling stock. Includes: • construction of rail infrastructure on the section from the Kujawski roundabout to the Bernardyński roundabout with the construction of traction, lighting (including connection of tram traction function with lighting), 8 tram stops, connection to the ITS and reconstruction of the existing two-way road with a separate busband, as well as reconstruction and construction of pavements and pedestrian crossings; • reconstruction of rail transport infrastructure on the section from Magnuszewska loop to the transport hub of the Polish Army – Hospital – Grey ranks – Bełzy; • construction and reconstruction of bus bays; • reconstruction of the infrastructure (including underground) conflicting with the material scope of the project • construction of the Park &Ride car park at the Kujawski roundabout; • redevelopment of parking lots on ul. Ustronie and St. Long and parking places The aim of the project is to improve the public transport system, leading to an increase in the participation of people using public transport. The entire infrastructure task consists of the execution of works – track, road, water supply, energy (lighting and light signalling), drainage, gas, plant robe, together with the city monitoring system, while the task of rolling stock consists of delivering 15 low-floor, modern trams. The tasks will contribute to reducing congestion in the city, improving traffic flow and reducing the negative environmental impact of transport. (English)
14 October 2020
0 references
Le projet comprend la construction d’infrastructures ferroviaires à ul. Kujawska sur la section allant du rond-point de Kujawski au rond-point Bernardyński avec reconstruction du système routier, reconstruction de l’infrastructure de transport ferroviaire dans la rue. L’armée polonaise de la boucle Magnuszewska à l’armée polonaise — hôpital — Szary Szary Szeregów — centre de transport Belzy et la connexion des sections susmentionnées au système de transport de la ville de Bydgoszcz (ITS), la reconstruction et la construction de parcs de stationnement et l’achat de matériel roulant de tramway moderne. Comprend: • construction d’infrastructures ferroviaires sur le tronçon allant du rond-point de Kujawski au rond-point Bernardine avec la construction de la traction, de l’éclairage (y compris le raccordement de la fonction de traction à l’éclairage), de 8 arrêts de tramway, de la connexion aux STI et de la reconstruction de l’actuelle et de la construction d’une nouvelle route à deux voies avec une voie d’autobus séparée, ainsi que de la reconstruction et de la construction de trottoirs et de passages pour piétons; • reconstruction de l’infrastructure de transport ferroviaire entre la boucle Magnuszewska et l’armée polonaise — hôpital — Szary Szeregów — Belzy; • construction et reconstruction de baies d’autobus; • reconstruction de l’infrastructure (y compris souterraine) en conflit avec le champ d’application matériel du projet • construction du parc et des marais; parking pédestre au rond-point de Kujawski; • reconstruction des parkings sur ul. Ustronie et St. L’objectif du projet est d’améliorer le système de transport public, ce qui permettra d’accroître la participation des usagers des transports publics. Toutes les tâches d’infrastructure consistent à exécuter des travaux — voie, route, approvisionnement en eau, énergie (éclairage et feux de circulation), drainage, gaz, peignoirs d’usine, ainsi qu’un système de surveillance urbaine, tandis que la tâche du matériel roulant consiste à fournir 15 tramways modernes à plancher bas. Ces tâches contribueront à réduire l’encombrement de la ville, à améliorer la circulation et à réduire l’impact négatif des transports sur l’environnement. (French)
30 November 2021
0 references
Identifiers
POIS.06.01.00-00-0007/16
0 references