Modernisation of selected stations on railway line No. 274 on the section of Wrocław – Boguszów Gorce West along with extension on line 311, selected stations on railway line No. 282 together with the station at Malczyce Street located on line 275 (Q86040)
Jump to navigation
Jump to search
Project Q86040 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of selected stations on railway line No. 274 on the section of Wrocław – Boguszów Gorce West along with extension on line 311, selected stations on railway line No. 282 together with the station at Malczyce Street located on line 275 |
Project Q86040 in Poland |
Statements
83,846,138.63 zloty
0 references
98,642,516.04 zloty
0 references
85.0 percent
0 references
1 October 2017
0 references
31 March 2022
0 references
POLSKIE KOLEJE PAŃSTWOWE S.A.
0 references
Projekt jest zlokalizowany na terenie woj. dolnośląskiego w 6 powiatach: zgorzelecki (dw. Węgliniec), bolesławiecki (dw. Bolesławiec), średzki (dw. Malczyce), świdnicki (dw. Imbramowice), wałbrzyski (dw. Wałbrzych Główny, dw. Boguszów-Gorce Zachód), jeleniogórski (dw. Szklarska Poręba Górna) i 7 gminach: Węgliniec, Bolesławiec, Malczyce, Żarów, Wałbrzych Główny, Boguszów-Gorce i Szklarska Poręba. Dworce kolejowe Węgliniec i Bolesławiec zlokalizowane są przy linii kolejowej nr 282, dworzec Malczyce przy linii 275, dworce Imbramowice, Wałbrzych Główny i Boguszów-Gorce Zachód przy linii nr 274 i dworzec Szklarska Poręba Górna przy linii nr 311. Obecny stan techniczny większości dworców jest określony jako średni lub zadowalający, obiekty nie są przystosowane do potrzeb osób niepełnosprawnych, nie spełniają wymogów TSI-PRM ( odnoszących się do dostępności systemu kolei Unii dla osób niepełnosprawnych i osób o ograniczonej możliwości poruszania się) oraz współczesnych standardów i oczekiwań pasażerów. Pomimo, iż prawie wszystkie dworce są dostępne dla podróżnych (wyjątkiem jest dworzec Malczyce) to kasy biletowe są czynne jedynie na dworcach w Bolesławcu i Szklarskiej Porębie Górnej. Zdecydowana większość dworców jest objęta ochroną konserwatorską (wyjątkiem jest dworzec Imbramowice). W ramach projektu przewidziane są relokacje z 9 mieszkań (dworce: Bolesławiec, Malczyce, Boguszów-Gorce Zachód, Szklarska Poręba Górna). Zakres projektu obejmuje: - przebudowę i modernizację istniejących 7 obiektów dworców wchodzących w zakres projektu, - wykonanie prac wykończeniowych wnętrz i na zewnątrz budynków, - dostosowanie obiektów do potrzeb osób niepełnosprawnych i z ograniczoną możliwością poruszania się zgodnie z wytycznymi TSI-PRM, zagospodarowanie terenów wokół dworców w tym m.in. wymianę nawierzchni, nasadzenia zieleni, elementy małej architektury, budowa infrastruktury rowerowej, - budowę dróg dojazdowych i parkingów przed dworcami, (Polish)
0 references
The project is located in the Dolnośląskie Voivodeship in 6 powiats: “Zgorzelecki” (dw. Węgliniec), Bolsławiecki (dw. Bolesławiec), Średzki (dw. Malczyce), Widgetski (two. Imbramowice), Wałbrzych (dw. Wałbrzych Main, two. Boguszów-Gorce West), Jeleniogórski (dv. Szklarska Poręba Górna) and 7 municipalities: Węgliniec, Bolesławiec, Malczyce, Żarów, Wałbrzych Główny, Boguszów-Gorce and Szklarska Poręba. The railway stations Węgliniec and Bolesławiec are located on railway line No. 282, Malczyce station on line 275, Imbramowice, Wałbrzych Główny and Boguszów-Gorce West on line 274 and Szklarska Poręba Górna station on line 311. The current technical status of most stations is defined as medium or satisfactory, facilities are not adapted to the needs of persons with disabilities, do not meet the requirements of the TSI-PRM (referring to the availability of the Union rail system for disabled persons and persons with reduced mobility) and modern passenger standards and expectations. Although almost all stations are accessible to travellers (except Malczyce station), ticket offices are open only at the railway stations in Bolesławiec and Szklarska Poręba Górna. The vast majority of the stations are covered by conservation protection (except Imbramowice station). The project includes relocations from 9 apartments (documents: Bolesławiec, Malczyce, Boguszów-Gorce West, Szklarska Poręba Górna). The scope of the project includes: — reconstruction and modernisation of the existing 7 station buildings falling within the scope of the project, – execution of interior and exterior finishing works, – adaptation of objects to the needs of disabled people and with limited mobility according to TSI-PRM guidelines, development of areas around stations including, among others, paving, planting of greenery, elements of small architecture, construction of bicycle infrastructure, – construction of access roads and car parks in front of railway stations, (English)
14 October 2020
0 references
Le projet est situé dans la voïvodie de Basse-Silésie dans 6 comtés: Zgorrzelecki (dw. Węgliniec), Bolesławiecki (dw. Bolesławiec), Średzki (dw. Malczyce), Świidnicki (dw. Imbramowice), Wałbrzyski (dw. Wałbrzych Main, deux. Boguszów-Gorce West), Jeleniogórski (dw. Szklarska Poręba Górna) et 7 communes: Węgliniec, Bolesławiec, Malczyce, Szklarska Poręba, Wałbrzych Main, Boguszów-Gorce et Szklarska Poręba. Les gares Węgliniec et Bolesławiec sont situées sur la ligne 282, la gare Malczyce sur la ligne 275, Imbramowice, Wałbrzych Główny et Boguszów-Gorce West sur la ligne 274 et la gare Szklarska Poręba Górna sur la ligne 311. L’état technique actuel de la plupart des gares est défini comme moyen ou satisfaisant, les installations ne sont pas adaptées aux besoins des personnes handicapées, ne répondent pas aux exigences de la STI-PRM (concernant l’accessibilité du système ferroviaire de l’Union pour les personnes handicapées et les personnes à mobilité réduite) et les normes et attentes modernes des voyageurs. Bien que presque toutes les gares soient accessibles aux voyageurs (à l’exception de Malczyce), les guichets ne sont ouverts que dans les gares de Bolesławiec et Szklarska Poręba Górna. La grande majorité des stations sont protégées par la conservation (à l’exception de l’Imbramowice). Le projet prévoit des déménagements à partir de 9 appartements (stations de train: Bolesławiec, Malczyce, Boguszów-Gorce West, Szklarska Poręba Górna). La portée du projet comprend: — reconstruction et modernisation de 7 gares ferroviaires existantes dans le cadre du projet, — réalisation de travaux de finition intérieure et extérieure, — adaptation des installations aux besoins des personnes handicapées et à mobilité limitée conformément aux lignes directrices STI-PRM, aménagement de zones autour des gares, y compris, entre autres, remplacement de la chaussée, plantation de verdure, éléments de petite architecture, construction d’infrastructures cyclables, — construction de routes d’accès et de stationnements devant les gares, (French)
30 November 2021
0 references
Identifiers
POIS.05.02.00-00-0033/18
0 references