Revision as of 21:13, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Ce projet a pour objet la construction d’une deuxième chaussée de l’autoroute S1 sur le tronçon de la jonction «Aéroport» — jonction Podwarpie du km 2 + 158 au km 11 + 880, soit 9,72 km de long, ainsi que la construction de structures techniques, de dispositifs de protection de l’environnement, d’équipements routiers (désarrosage, éclairage routier) et la reconstruction des infrastructures techniques existantes. La voie express S1 fonctionne act...)
Jump to navigation Jump to search
Project Q85938 in Poland
Language Label Description Also known as
English
Construction of the S1 expressway. Pyrzowice (at. Airport) – Podwarpie
Project Q85938 in Poland

    Statements

    0 references
    0 references
    0 references
    74,445,971.69 zloty
    0 references
    17,867,033.21 Euro
    13 January 2020
    0 references
    87,583,496.11 zloty
    0 references
    21,020,039.07 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2022
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references

    50°26'38.8"N, 19°7'26.8"E
    0 references

    50°28'15.6"N, 19°13'54.8"E
    0 references
    Przedmiotem niniejszego projektu jest dobudowa drugiej jezdni drogi ekspresowej S1 na odcinku węzeł „Lotnisko” – węzeł „Podwarpie” od km 2+158 do km 11+880 tj. o długości 9,72 km wraz z budową obiektów inżynierskich, urządzeń ochrony środowiska, urządzeń związanych z drogą (odwodnienie, oświetlenie drogowe) oraz przebudową istniejącej infrastruktury technicznej. Droga ekspresowa S1 funkcjonuje w chwili obecnej na ww. odcinku jako jednojezdniowa droga ekspresowa tj. ruch pojazdów odbywa się dwukierunkowo na jednej jezdni drogi ekspresowej, zrealizowanej w latach 2002-2005. Początek projektu zlokalizowany jest na terenie gminy Mierzęcice, za węzłem „Lotnisko” w km 2+158. Koniec opracowania zlokalizowany jest na terenie gminy Siewierz, przed istniejącym węzłem „Podwarpie” w km 11+880. Poprzez ścisłe dopasowanie sytuacyjno – wysokościowe do jezdni istniejącej drogi ekspresowej, projektowana jezdnia S1 nie wprowadza istotnych zmian w obecnym krajobrazie. (Polish)
    0 references
    The subject of this project is the addition of the second carriageway of the S1 expressway on the section of the “Airport” junction – Podwarpie junction from km 2 + 158 to km 11+ 880, i.e. 9.72 km long with the construction of engineering facilities, environmental protection equipment, road-related equipment (dehydration, road lighting) and reconstruction of existing technical infrastructure. The S1 expressway currently operates on the above section as a one-way expressway, i.e. the traffic of vehicles takes place in two directions on one road of the expressway, which was completed between 2002 and 2005. The beginning of the project is located in Mierzęcice commune, behind the “Airport” junction in km 2+ 158. The end of the study is located in the municipality of Siewierz, in front of the existing “Podwarpie” junction in km 11+ 880. By closely adjusting the situational and altitude to the roadway of the existing expressway, the design S1 road does not make significant changes to the current landscape. (English)
    14 October 2020
    0 references
    Ce projet a pour objet la construction d’une deuxième chaussée de l’autoroute S1 sur le tronçon de la jonction «Aéroport» — jonction Podwarpie du km 2 + 158 au km 11 + 880, soit 9,72 km de long, ainsi que la construction de structures techniques, de dispositifs de protection de l’environnement, d’équipements routiers (désarrosage, éclairage routier) et la reconstruction des infrastructures techniques existantes. La voie express S1 fonctionne actuellement sur la section susmentionnée en tant que voie express unique, c’est-à-dire que le trafic des véhicules s’effectue dans deux directions sur une chaussée de la route express, qui a été réalisée entre 2002 et 2005. Le début du projet est situé dans la commune de Mierzęcice, derrière la jonction «Aéroport» au km 2 + 158. La fin de l’étude est située dans la commune de Siewierz, en face de la jonction existante «Podwarpie» au km 11 + 880. En raison de l’alignement étroit de la situation et de l’altitude avec la chaussée de l’autoroute existante, la route S1 prévue n’apporte pas de changements significatifs au paysage actuel. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.04.01.00-00-0013/19
    0 references