Increase energy efficiency of the building of the Institute of Energy – Research Institute in Warsaw (Q84581)

From EU Knowledge Graph
Revision as of 20:58, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet sera mis en œuvre dans la voïvodie de Mazowieckie, Varsovie, au 36, rue Augustówka, sur la propriété dont la requérante est propriétaire sous usufruit perpétuel. Ce projet concerne la thermomodernisation complète en profondeur de la construction de l’Institut de l’énergie (IEN) à Varsovie. Les objectifs à atteindre par la requérante dans le cadre du projet sont les suivants: Objectif principal: accroître l’efficacité énergétique du bât...)
Jump to navigation Jump to search
Project Q84581 in Poland
Language Label Description Also known as
English
Increase energy efficiency of the building of the Institute of Energy – Research Institute in Warsaw
Project Q84581 in Poland

    Statements

    0 references
    2,210,812.29 zloty
    0 references
    530,594.95 Euro
    13 January 2020
    0 references
    2,696,112.55 zloty
    0 references
    647,067.01 Euro
    13 January 2020
    0 references
    82.0 percent
    0 references
    21 December 2017
    0 references
    31 December 2020
    0 references
    INSTYTUT ENERGETYKI INSTYTUT BADAWCZY
    0 references
    0 references
    0 references
    Projekt będzie realizowany w województwie mazowieckim, w Warszawie,przy ulicy Augustówka 36 na nieruchomości, którą Wnioskodawca włada na mocy użytkowania wieczystego. Niniejszy Projekt dotyczy kompleksowej głębokiej termomodernizacji budynku Instytutu Energetyki (IEn) w Warszawie. Cele, jakie w ramach Projektu zrealizuje Wnioskodawca to: Cel główny: zwiększenie efektywności energetycznej budynku Instytutu Energetyki w Warszawie. Cele szczegółowe: - zmniejszenie kosztów eksploatacji budynku Instytutu, dzięki oszczędności energii elektrycznej i cieplnej; - zmniejszenie zużycia energii końcowej i pierwotnej, potrzebnej do ogrzewania infrastruktury Instytutu; - wzrost czystości powietrza w otoczeniu budynku, poprzez redukcję emisji gazów cieplarnianych; - poprawa jakości korzystania z infrastruktury publicznej – poprawa komfortu pracy i przebywania w budynku. Osiągnięcie powyższych celów będzie możliwe poprzez przeprowadzenie następujących działań, stanowiących wydatki kwalifikowane Projektu o podanych wartościach (zł): - Prace przygotowawcze: dokumentacja aplikacyjna (studium wykonalności), Prace przygotowawcze: dokumentacja projektowo - techniczna (dokumentacja: techniczna, przetargowa, projektowa, przyrodnicza), Roboty budowlane: Ocieplenie ścian szczytowych – 1419,15 m2; Ocieplenie dachu nad klatką schodową oraz maszynownią – 96,25 m2; Wymiana drzwi zewnętrznych – 24,52 m2; Ocieplenie stropodachu niewentylowanego 788,64 m2; Wymiana okien klatki schodowej - 14,04 m2; Ocieplenie ścian osłonowych – 1827,73 m2; Ocieplenie ścian cokołowych piwnic – 141,0 m2; Modernizacja instalacji c.w.u. – 1 kpl.; Modernizacja instalacji c.o. – 1 kpl. Budowa nadachowej instalacji PV – 39,96 kWp; Wymiana oświetlenia – 1 kpl., Promocja Projektu, Nadzór inwestorski, Audyt ex-post. (Polish)
    0 references
    The project will be implemented in the Mazowieckie Voivodship, Warsaw, at Augustówka 36 on the property, which the Applicant controls on the basis of perpetual use. This Project concerns comprehensive thermal modernisation of the building of the Institute of Energy (IEn) in Warsaw. The objectives to be pursued by the Applicant within the Project are: Main objective: increase the energy efficiency of the building of the Institute of Energy in Warsaw. Specific objectives: — reducing the operating costs of the Institute building, thanks to the savings of electricity and heat; — reducing the final and primary energy consumption needed to heat the Institute’s infrastructure; — increased air purity in the surroundings of the building, by reducing greenhouse gas emissions; — improving the use of public infrastructure – improving the comfort of work and staying in the building. The above objectives can be achieved by carrying out the following actions, constituting eligible expenditure of the Project with the stated values (PLN): Preparatory work: application documentation (feasibility study), preparatory work: technical and design documentation (documentation: technical, tender, design, natural), Construction works: Warming of the peak walls – 1419,15 m²; Roof warming over the stairway and engine room – 96,25 m²; Replacement of external doors – 24,52 m²; Warming of non-ventilated trophode 788,64 m²; Replacement of stairway windows – 14,04 m²; Wall warming – 1827,73 m²; Warming of the base walls of cellars – 141,0 m²; Modernisation of the installation of c.w.u. – 1 kpl.; Modernisation of the central heating system – 1 kpl. Construction of PV – 39,96 kWp; Lighting exchange – 1 kpl., Project Promotion, Investor Oversight, Ex-post Audit. (English)
    14 October 2020
    0 references
    Le projet sera mis en œuvre dans la voïvodie de Mazowieckie, Varsovie, au 36, rue Augustówka, sur la propriété dont la requérante est propriétaire sous usufruit perpétuel. Ce projet concerne la thermomodernisation complète en profondeur de la construction de l’Institut de l’énergie (IEN) à Varsovie. Les objectifs à atteindre par la requérante dans le cadre du projet sont les suivants: Objectif principal: accroître l’efficacité énergétique du bâtiment de l’Institut de l’énergie à Varsovie. Objectifs spécifiques: — réduire les coûts d’exploitation du bâtiment de l’Institut grâce à des économies d’énergie et de chaleur; — réduire la consommation d’énergie finale et primaire nécessaire pour chauffer l’infrastructure de l’Institut; — accroître la propreté de l’environnement du bâtiment en réduisant les émissions de gaz à effet de serre; — amélioration de l’utilisation des infrastructures publiques — amélioration du confort de travail et de séjour dans le bâtiment. Il sera possible d’atteindre les objectifs ci-dessus en réalisant les actions suivantes, qui constituent des dépenses éligibles du projet avec les valeurs indiquées (PLN): — Travaux préparatoires: documentation relative à la demande (étude de faisabilité), travaux préparatoires: conception et documentation technique (documentation: technique, appel d’offres, conception, nature), Travaux de construction: Réchauffement des parois des pics: 1 419,15 m²; Réchauffement du toit au-dessus de l’escalier et de la salle des machines — 96,25 m²; Remplacement des portes extérieures — 24,52 m²; Réchauffement des touffes non ventilées de 788,64 m²; Remplacement des fenêtres de l’escalier — 14,04 m²; Isolation des murs-rideaux — 1 827,73 m²; Isolation des parois des socles du sous-sol — 141,0 m²; Modernisation de l’installation d’eau chaude — 1 kpl; Modernisation des installations de chauffage central — 1 kpl. Construction d’une installation photovoltaïque aérienne — 39,96 kWc; Remplacement de l’éclairage — 1kpl., Promotion de projet, Supervision des investisseurs, Audit ex-post. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.01.03.01-00-0084/17
    0 references