Extension and reconstruction of the sewage treatment plant in Sulęcin with the modernisation of the sanitary and water supply system in the Sulęcin agglomeration (Q85428)
Jump to navigation
Jump to search
Project Q85428 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension and reconstruction of the sewage treatment plant in Sulęcin with the modernisation of the sanitary and water supply system in the Sulęcin agglomeration |
Project Q85428 in Poland |
Statements
22,753,294.91 zloty
0 references
26,768,582.25 zloty
0 references
85.0 percent
0 references
1 February 2015
0 references
31 December 2020
0 references
GMINA SULĘCIN
0 references
Projekt obejmuje rozbudowę i przebudowę oczyszczalni ścieków w Sulęcinie, modernizację systemu kanalizacji, w tym rozdział kanalizacji ogólnospławnej na kanalizację sanitarną i deszczową, przebudowę i remont sieci wodociągowej oraz rozbudowę SUW w Sulęcinie. Przepustowość oczyszczalni nie ulega zmianie i wynosić będzie nadal 14 234 RLM. Natomiast wdrażane będą rozwiązania, umożliwiające usuwanie azotu i fosforu do parametrów wymaganych prawem. Obecnie normy w tym zakresie są przekraczane. Ponadto nastąpi poprawa zagospodarowania osadów ściekowych w celu rolniczego wykorzystania. Na oczyszczalni wykonane zostaną m.in. obiekty: zlewnia ścieków dowożonych, pompownia ścieków surowych, stacja dmuchaw i mech. podczyszczania, stacja chemicznego strącania fosforu, 2 bloki biologiczne, budynek mech. odwodniania osadów, zbiornik wapna, magazyny osadu odwodnionego, zbiornik tlenowej stabilizacji, zagęszczacz mech. osadów. W związku z planowanym rozdziałem kanalizacji ogólnospławnej oczyszczalnia zostanie przebudowana pod kątem przyjęcia ścieków deszczowych. Modernizacja systemu kanalizacji obejmuje ponadto renowację odcinków w złym stanie techn. i wyłączenie z eksploatacji odcinków zużytych. W zakresie zaopatrzenia w wodę prace dotyczyć będą budowy nowych odcinków sieci, renowacji odcinków w złym stanie techn. i rozbudowy SUW (2 budynki techn. i 2 zbiorniki na wodę czystą). Realizowane będą wskaźniki produktu: Liczba przebudowanych oczyszczalni ścieków kom.– 1 szt.; Liczba oczyszczalni ścieków kom. wspartych w zakresie przeróbki / zagospodarowania osadów ściekowych – 1 szt.; Długość przebudowanej kanalizacji san.– 2,05 km; Długość wyremontowanej kanalizacji san.– 3,91 km; Długość wybudowanej sieci wodoc.– 4,20 km; Długość przebudowanej sieci wodoc.– 1,27 km; Długość wyremontowanej sieci wodoc.– 1,26 km; Liczba wspartych stacji uzdatniania wody – 1 szt.; Realizowane będą wskaźniki rezultatu: Liczba dodatk. osób korzystających z ulepszonego oczyszczania (Polish)
0 references
The project includes the extension and reconstruction of the sewage treatment plant in Sulęcin, the modernisation of the sewerage system, including the distribution of general drainage into sanitary and rain drainage, the reconstruction and renovation of the water supply network and the extension of the SUW in Sulęcin. The capacity of the treatment plant is unchanged and will continue to be 14 234 RLM. On the other hand, solutions will be implemented to remove nitrogen and phosphorus to the parameters required by law. Standards in this area are now being exceeded. In addition, the use of sewage sludge for agricultural use will be improved. On the treatment plant will be made, among others: transport sewage sink, raw sewage pumping plant, blow and moss station. cleaning, chemical phosphorus precipitation station, 2 biological blocks, moss dehydration building, lime tank, dehydrated sediment warehouses, oxygen stabilisation tank, moss thickener. sediment. In view of the planned unbundling of the sewage system, the treatment plant will be rebuilt with a view to the acceptance of rainwater. The modernisation of the sewer system also includes the renovation of sections in poor technical condition and the exclusion from operation of worn sections. In the area of water supply, works will concern the construction of new sections of the network, renovation of sections in poor technical condition and extension of the SUW (2 techn. buildings and 2 clean water tanks). Output indicators will be implemented: Number of reconstructed waste water treatment plants – 1 units; Number of waste water treatment plants supported by the treatment/management of sewage sludge – 1 units; Length of the remodeled sanitary sanitary system – 2,05 km; Length of the refurbished sanitary sanitary system – 3,91 km; Length of the water network built.– 4,20 km; Length of the reconstructed water network – 1,27 km; Length of the refurbished water network – 1,26 km; Number of water treatment stations supported by 1 units; Results indicators will be implemented: Number of additives. persons benefiting from improved purification (English)
14 October 2020
0 references
Le projet comprend l’extension et la reconstruction de la station d’épuration des eaux usées de Sulęcin, la modernisation du réseau d’assainissement, y compris la séparation du système d’assainissement combiné en eaux usées sanitaires et d’assainissement des eaux pluviales, la reconstruction et la rénovation du réseau d’alimentation en eau et l’extension du SUW à Sulęcin. La capacité de la station d’épuration reste inchangée et sera toujours de 14 234 EH. Toutefois, des solutions seront mises en œuvre pour éliminer l’azote et le phosphore selon les paramètres requis par la loi. Les normes dans ce domaine sont actuellement dépassées. En outre, la gestion des boues d’épuration sera améliorée à des fins agricoles. Les installations suivantes seront réalisées sur la station d’épuration: installation de captage d’eau, station de pompage d’eaux usées brutes, ventilateur et station de mousse. purification, station de précipitation chimique du phosphore, 2 blocs biologiques, bâtiment de drainage des sédiments mech., réservoir de chaux, stockage de boues déshydratées, réservoir de stabilisation d’oxygène, épaississant mech. boues. Compte tenu de la séparation prévue des eaux usées, la station d’épuration sera reconstruite pour accueillir l’eau de pluie. La modernisation du système d’assainissement comprend également la rénovation de tronçons en mauvais état technologique et le déclassement des tronçons de déchets. Dans le domaine de l’approvisionnement en eau, les travaux porteront sur la construction de nouveaux tronçons du réseau, la rénovation de tronçons en mauvais état technologique et l’extension du SUW (2 bâtiments techniques et 2 réservoirs d’eau propre). Les indicateurs de réalisation seront mis en œuvre: Nombre de stations de traitement des eaux résiduaires reconstruites — 1 unité; Nombre d’installations de traitement des eaux usées cellulaires bénéficiant d’un soutien pour le traitement/gestion des boues d’épuration — 1 pièce; Longueur de l’égout reconstruit de san. — 2,05 km; Longueur du réseau d’assainissement rénové — 3,91 km; Longueur du réseau wodoc construit-4,20 km; Longueur du réseau wodoc reconstruit-1,27 km; Longueur du réseau de wodoc rénové — 1,26 km; Nombre d’installations de traitement de l’eau bénéficiant d’un soutien — 1 pièce; Les indicateurs de résultat seront mis en œuvre: Nombre d’ajouts. personnes bénéficiant d’une purification améliorée (French)
30 November 2021
0 references
Identifiers
POIS.02.03.00-00-0183/16
0 references